Difference between revisions of "2019-04-15-LeadershipReports"

From Administrative
Jump to navigation Jump to search
Line 1: Line 1:
April 15, 2019 Report - April 1 - April 26
+
April 15, 2019 Report - April 15 - May 10
  
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
 
       -  
 
       -  
   Next two weeks (Apr 15 - Apr 25)
+
   Next two weeks (Apr 29 - May 10)
 
       -  
 
       -  
  
 
Alex Bogacz
 
Alex Bogacz
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Machine support
+
       -  
      - Paper on ‘Dogbone’ ERL for IPAC
+
   Next two weeks (Apr 29 - May 10)
      - Finalizing White Paper on Publications and Conferences
+
       -
      - JLEIC Collab. mgt.
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Injector solenoids - importance of uniformity of focusing across the bunch and stray field
 
      - Finalizing paper on ‘Dogbone’ ERL for IPAC
 
      - Implementation of new Internal Publication system
 
      - PRAB paper - review
 
 
   
 
   
  
 
Rui Li
 
Rui Li
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Participated in the EIC collaboration meeting, presented my talk, and interacted with colleagues from different labs
+
       -  
      - Extended discussions with the RF group and John Fox and Dmitry Teytelman on feedback requirements for JLEIC
+
   Next two weeks (Apr 29 - May 10)
      - Scheduling the next impedance meeting and update impedance wiki
+
       -  
      - Started collaboration with LBL on impedance and wakefield studies for ALS-U
 
      - Literature studies on impedances
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Continue with broadband impedance study for JLEIC
 
      - Impedance meeting on 4/22 at 10:30am
 
      - Review some of the studies on CSR effects
 
 
   
 
   
  
 
Ed Nissen
 
Ed Nissen
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Attended the JLEIC collaboration meeting
+
       -  
      - Working on ECA application
+
   Next two weeks (Apr 29 - May 10)
   Next two weeks (Apr 15 - Apr 25)
+
       -
       - Continue working on ECA application
 
      - Finish paper to submit for light peer review at IPAC
 
  
 
Chris Tennant
 
Chris Tennant
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
      - JLEIC collaboration meeting
+
       -  
      - Finished collecting parameters for updated ERL landscape plot (with help of Peter Williams)
+
   Next two weeks (Apr 29 - May 10)
       - Met with SLAC representatives about collaborating on their LDRD (ML relating to SRF)
+
       -
      - Went over SRF classification analysis with Anna and Adam
 
      - Continue analysis and documentation in TN for SRF classification (text needed for Anna's LDRD, IPAC paper and Adam's
 
        ICALEPCS paper)
 
      - Vacation day to attend "Applied Machine Learning Conference" in Charlottesville
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Finish(?) TN
 
  
  
Line 64: Line 44:
 
Fanglei Lin
 
Fanglei Lin
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Maternity Leave
+
       -  
      - Finished the electron collider ring design
+
   Next two weeks (Apr 29 - May 10)
      - Updating the pCDR-100 in the electron complex section
+
       -
      - Prepared electron ring information to the talk given in the collaboration meeting spring 2019
 
      - Provided the electron ring magnet information to Leigh and Tim for the cost estimation
 
      - Had a discussion and made a plan on the study of electron polarization with colleagues from UNM and Cornell University
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Maternity Leave
 
  
 
<br>
 
<br>
 
Vasiliy Morozov
 
Vasiliy Morozov
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - JLEIC collaboration meeting: preparation and presentation of four talks on JLEIC overview, IR design, collider ring
+
       - Preparation of the DoE quarterly reports: they were submitted on April 26
        designs and working group summary, discussions with collaborators. Presentation of the latest JLEIC design to NP.
+
       - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper
      - Costing and energy upgrade exercises.
+
       - Two-energy storage ring cooler: study of stability of the longitudinal dynamics
       - Ion polarization: spin transparency experiment analysis and simulations, preparation of a paper with Kondratenko.
+
 
       - IR design: setting up collider ring simulations in Elegant with Randy.
+
   Next two weeks (Apr 29 - May 10)
      - Work on simulations of the longitudinal dynamics in a storage ring cooler with Bhawin.
+
       - Preparation of IPAC'18 papers
      - Work on beam-beam simulations with River
+
       - Pre-CDR update
   Next two weeks (Apr 15 - Apr 25)
+
      - Costing exercise.
 
       - Preparation of the DoE quarterly reports.
 
      - Work on the spin transparency experiment and polarization papers
 
       - Completion of the pCDR.
 
      - Collider ring design and simulations.
 
 
 
 
<br>
 
<br>
 
Amy Sy
 
Amy Sy
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Attended JLEIC collaboration meeting.
+
       -  
      - Continued work on early career proposal.
+
   Next two weeks (Apr 29 - May 10)
      - Participated in commissioning of laser-driven polarized proton source at FZ Juelich. Testing Lamb-shift polarimeter
+
       -
        with unpolarized pulsed proton beam.
 
      - Summarized longitudinal Schottky signal analysis work on IMP experiment data for quarterly report.
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Continued work on early career proposal.
 
      - Continued participation in experiments with Lamb-shift polarimeters at FZ Juelich.
 
 
   
 
   
 
<br>
 
<br>
 
Yuhong Zhang
 
Yuhong Zhang
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
      - Organized and attended JLEIC collaboration meeting.
+
       -  
      - Met with various visitors during the week of the collaboration meeting
+
   Next two weeks (Apr 29 - May 10)
      - Activites supporting the cost exercises (design and risk factors)
+
       -
       - Worked on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Continue work on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
 
 
   
 
   
 
<br>
 
<br>
Line 122: Line 83:
 
Yves Roblin
 
Yves Roblin
 
     CEBAF
 
     CEBAF
       - Prepare for machine startup.
+
       - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt
      - Preparing talk to Hall A collaboration.
+
        optics to the gradient profile of the linac prior to starting ORFP.
      - Completed TOSP for Hall A Apex Experiment
 
      - Developing method to center solenoids (in particular
 
        Hall A moeller solenoid)
 
      - BTEAM
 
 
     JLEIC:   
 
     JLEIC:   
       - Reviewing Implications of the 100 GeV CM setup for BeamBeam 
+
       - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA.
 +
      - Writing tech note on the implementation of IR multipole kicks in BB3D.
 +
      - Gave a presentation on the status of the beam-beam for the new pCDR100 optics
 
     OTHER
 
     OTHER
       - Attended workshop on ML
+
       - Attended the ML seminar
       - Conducted interviews for postdoc position
+
       - Starting to work on the use of deep learning networks for CEBAF (matching with sync light )
       - TRC meetings
+
    Next two weeks (Apr 29 - May 10)
       - FOA reports.
+
       - Fiish tech note on the IR multipole kicks implementation
       - Evaluating various Python frameworks for ML and GA (DEAP,        pyEVOLVE)
+
       - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks
+
       - Work on a model for a landau cavity (its 3rd quarter of FOA)
 +
 
 +
  +work on optics for the summer run (CEBAF)
 +
 
  
 
<br>
 
<br>
 
He Zhang
 
He Zhang
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
       - MAD-X 5D Map tracking code has been sent to Yun Luo and Ji Qiang
+
       - MAD-X 5d Map tracking
       - Working on JSPEC development
+
       - JSPEC development
    Next two weeks (Apr 15 - Apr 25)
+
  Next two weeks (Apr 29 - May 10)
       - Enhance the luminosity module of JSPEC
+
       - Update the manual for the luminosity module.
       - Simulation on dispersive cooling
+
       - Dispersive cooling (New friction force  formulas and benchmark with theory).
 +
 
  
  
Line 153: Line 116:
 
'''Diagnostic Development - Kevin Jordan''' <br>
 
'''Diagnostic Development - Kevin Jordan''' <br>
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
      - Attended an ARIES sponsored workshop on scintillating screens, cameras & optics.
 
      - Working on getting power setup for Magnetron Project. This will be done in Lab 1 of the LERF. Within the next
 
        few weeks the first of two transmitters will arrive and be installed in the LERF.
 
      - Mounted a BNNT Halo monitor screen for the Isotope beam line run the LERF, also worked to get beam to 0G dump
 
        and to the 1G dump. Initially the vacuum system was not ready then we were all ready & the drive laser would not stay
 
        locked. There were a number of items on HCO that were signed off but not operational. We will try to run to the 1G
 
        dump in ~6 weeks when we are back at 2K.
 
      - Working with Joe & Mike to get the first SLM installed in Arc 7 during the SAD. I also mounted a BNNT flag as a part
 
        of this installation.
 
      - Attending a meeting at ODU about hope to better work together on common projects with the school of engineering.
 
      - Finishing up some IBIC program details for this fall’s conference.
 
      - Spent some time on the IPM gun pulser design for the 300 kV experiment.
 
    Next two weeks (Apr 15 - Apr 25)
 
 
       -  
 
       -  
 +
  Next two weeks (Apr 29 - May 10)
 +
      -
  
  
 
Joe Gubeli
 
Joe Gubeli
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
       - Finished and implemented the new optical layout of ARC 7 SLM. We now have a filter wheel in front of the first optic
+
       -  
        as Mike T. asked for the second filter wheel is 90mm upstream of the third filter wheel which is located at the field
+
  Next two weeks (Apr 29 - May 10)
        stop. The first wheel will contain the slits. I am waiting on input from Mike T. on the width and offset of the five
+
       -
        different slits that will be installed here. The second wheel will contain bandpass filters for short and long visible
 
        wavelengths along with a vertical and a horizontal polarizer. The last wheel contains neutral density filters. Met
 
        with Steve S. and Keith C. at the installation location. Steve said he will approve the installation but hasn’t yet
 
        updated the Atlis.
 
      - Spent time working on the Beamenizer after we found the system not working when running to the 0G dump. I created a
 
        test fixture and
 
        after a timing board repair I was able to verify the system now works.
 
    Next two weeks (Apr 15 - Apr 25)
 
       - VACATION - 1 week
 
      - Prepare and install the ARC 7 SLM.
 
  
  
 
Michael Tiefenback
 
Michael Tiefenback
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
 
       - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
 
       - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
 
       - Specify depth of field limiting slit widths for Arc 7 SLM
 
       - Specify depth of field limiting slit widths for Arc 7 SLM
 
       - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
 
       - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
 
       - Planning for overall diagnostic system integration, including periodic calibration requirements
 
       - Planning for overall diagnostic system integration, including periodic calibration requirements
     Next two weeks (Apr 15 - Apr 25)
+
     Next two weeks (Apr 29 - May 10)
       - model SyncLightMonitor matching process for arcs
+
       - Model SyncLightMonitor matching process for arcs
 
       - Review field map updates for Moller quads requested by Benesch
 
       - Review field map updates for Moller quads requested by Benesch
 
       - Continue on 4) above (diagnostic system integration)
 
       - Continue on 4) above (diagnostic system integration)
Line 205: Line 147:
 
'''LERF - Steve Benson''' <br>
 
'''LERF - Steve Benson''' <br>
 
   
 
   
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
 
       -  
 
       -  
    Next two weeks (Apr 15 - Apr 25)
+
  Next two weeks (Apr 29 - May 10)
 
       -
 
       -

Revision as of 11:06, 20 May 2019

April 15, 2019 Report - April 15 - May 10

Director - Todd Satogata

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     - 

Alex Bogacz

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -

Rui Li

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     - 

Ed Nissen

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -

Chris Tennant

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -



Accelerator R & D - Yuhong Zhang

Fanglei Lin

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -


Vasiliy Morozov

  Previous two weeks (Apr 15 - Apr 26)
     - Preparation of the DoE quarterly reports: they were submitted on April 26
     - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper
     - Two-energy storage ring cooler: study of stability of the longitudinal dynamics
  Next two weeks (Apr 29 - May 10)
     - Preparation of IPAC'18 papers
     - Pre-CDR update


Amy Sy

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -


Yuhong Zhang

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -



Computational Physics - Yves Roblin
Yves Roblin

   CEBAF
     - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt
       optics to the gradient profile of the linac prior to starting ORFP.
    JLEIC:   
     - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA.
     - Writing tech note on the implementation of IR multipole kicks in BB3D.
     - Gave a presentation on the status of the beam-beam for the new pCDR100 optics 
   OTHER
     - Attended the ML seminar 
     - Starting to work on the use of deep learning networks for CEBAF (matching with sync light )
   Next two weeks (Apr 29 - May 10)
     - Fiish tech note on the IR multipole kicks implementation
     - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks
     - Work on a model for a landau cavity (its 3rd quarter of FOA)
 +work on optics for the summer run (CEBAF)



He Zhang

   Previous two weeks (Apr 15 - Apr 26)
     - MAD-X 5d Map tracking
     - JSPEC development
  Next two weeks (Apr 29 - May 10)
     - Update the manual for the luminosity module. 
     - Dispersive cooling (New friction force  formulas and benchmark with theory).




Diagnostic Development - Kevin Jordan

   Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -


Joe Gubeli

   Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -


Michael Tiefenback

   Previous two weeks (Apr 15 - Apr 26)
     - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
     - Specify depth of field limiting slit widths for Arc 7 SLM
     - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
     - Planning for overall diagnostic system integration, including periodic calibration requirements
   Next two weeks (Apr 29 - May 10)
     - Model SyncLightMonitor matching process for arcs
     - Review field map updates for Moller quads requested by Benesch
     - Continue on 4) above (diagnostic system integration)



LERF - Steve Benson

   Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -