Difference between revisions of "2015-08-21 Accelerator Physics Report"

From Administrative
Jump to navigation Jump to search
 
Line 27: Line 27:
 
</li>
 
</li>
 
</ul>
 
</ul>
 +
  
 
Alex Bogacz:<br>
 
Alex Bogacz:<br>
Line 39: Line 40:
 
<li>ER@CEBAF: continue optics matching work with Yves
 
<li>ER@CEBAF: continue optics matching work with Yves
 
</ul>
 
</ul>
 +
  
 
Dave Douglas:<br>
 
Dave Douglas:<br>
Line 55: Line 57:
 
<li>Reviews (PRST:AB paper, USPAS proposal)
 
<li>Reviews (PRST:AB paper, USPAS proposal)
 
</ul>
 
</ul>
 +
  
 
Chris Tennant:<br>
 
Chris Tennant:<br>
Line 70: Line 73:
 
<li>MEIC: Continue Linac/arc acceptance with Douglas CSR-suppression arc
 
<li>MEIC: Continue Linac/arc acceptance with Douglas CSR-suppression arc
 
</ul>
 
</ul>
 +
  
 
Alex Castilla:<br>
 
Alex Castilla:<br>
Line 82: Line 86:
 
<li>Continue preparations for MEPAS teaching in Nov
 
<li>Continue preparations for MEPAS teaching in Nov
 
</ul>
 
</ul>
 +
  
 
Randy Gamage:<br>
 
Randy Gamage:<br>

Latest revision as of 10:26, 17 August 2015

CASA Accelerator Physics
Report: 07/27/15 - 08/21/15
Submitted by Todd Satogata


Todd Satogata:
Previous two weeks (Jul 27-Aug 7)

  • FMLA: 07/31-08/04
  • ODU: NNSA funding proposal development
  • ER@CEBAF: biweekly meeting, BBU model development with BNL
  • ODU/MEIC: Develop Randy research plan, start bunch-splitting simulations
  • CEBAF: StayTreat debrief, ORFP revision, Hall D FFB meet
  • ADMIN: Eric Thompson, COOL'15 org
  • MEIC: More work on gear-changing implications

Next two weeks (Aug 10-21)

  • CEBAF: ORFP editing, StayTreat summary prep, Hall D FFB modeling, BTeam
  • ADMIN: IPAC'15 proceedings finalization, COOL'15 program work
  • ER@CEBAF: biweekly meeting notes, BBU model development with BNL
  • ODU/MEIC: Continue bunch-splitting simulations with Randy
  • ODU: NNSA funding proposal development
  • Vacation: 8/10(pm), 8/12, 8/14(am)


Alex Bogacz:
Previous two weeks (Jul 27-Aug 7)

  • Preparation for NuFact15 (Aug 10-15)
  • ER@CEBAF: optics work with Yves

Next two weeks (Aug 10-21)

  • NuFact15 (Aug 10-15)
  • ER@CEBAF: continue optics matching work with Yves


Dave Douglas:
Previous two weeks (Jul 27-Aug 7)

  • Project E: Eindhoven workshop (through Jul 28)
  • Project E: Develop collimation experiment in IR upgrade
  • MEIC: Assemble CSR-suppression arc for tracking with Chris

Next two weeks (Aug 10-21)

  • Project E: Detail collimation experiment in IR upgrade
  • MEIC: Continue CSR-suppression arc for tracking with Chris
  • Darklight: Develop match for C target/no solenoid, gas target+solenoid
  • Medical isotope IR upgrade backleg lattice assembly
  • Reviews (PRST:AB paper, USPAS proposal)


Chris Tennant:
Previous two weeks (Jul 27-Aug 7)

  • Project E: Followup from workshop outcome
  • ER@CEBAF: Followup on measurement, BBU planning
  • LERF: FEL lattice to CED with Michele Joyce
  • MEIC: Linac/arc acceptance with Douglas CSR-suppression arc

Next two weeks (Aug 10-21)

  • ER@CEBAF: Continue measurement, BBU planning
  • LERF: Continue FEL lattice to CED with Michele Joyce
  • MEIC: Continue Linac/arc acceptance with Douglas CSR-suppression arc


Alex Castilla:
Previous two weeks (Jul 27-Aug 7)

  • Dissertation writing
  • Start preparations for MEPAS teaching in Nov

Next two weeks (Aug 10-21)

  • Dissertation writing
  • Continue preparations for MEPAS teaching in Nov


Randy Gamage:
Previous two weeks (Jul 27-Aug 7)

  • MEIC: Longitudinal model development

Next two weeks (Aug 10-21)

  • MEIC: Longitudinal model development