Difference between revisions of "2020-1-5-LeadershipReports"
Jump to navigation
Jump to search
Line 271: | Line 271: | ||
Joe Gubeli | Joe Gubeli | ||
− | Previous two weeks ( | + | Previous two weeks (Dec 23 - Jan 3) |
− | - Isotope Experiment – | + | - '''Isotope Experiment –''' Helped with the two day run to the 1G dump. |
− | + | - '''Halo monitor –''' Conducted the Halo Monitor experiment in the LERF. | |
− | + | - '''ARDDOT –''' Was able to install and run the Beamenizer on a Windows 10 machine. | |
− | - Halo monitor – | ||
− | - | ||
Next two weeks (Nov 11 - Nov 22) | Next two weeks (Nov 11 - Nov 22) | ||
− | - Isotope Experiment – Help with the two day run to the | + | - '''Isotope Experiment –''' Help with the two day run to the 1X line. |
− | - | + | - '''ARDDOT –''' Start work on the other CEBAF SLMs |
− | + | ||
Revision as of 11:35, 15 January 2020
Dec 5 2019 Report - Nov 25 - Dec 20
Director - Todd Satogata
Todd Satogata
Previous two weeks (Nov 25 - Dec 6) - ADMIN 12 GeV PRAB paper planning/writing - MGMT Continue annual appraisals, AWP updates - JLEIC planning and organization, cooling studies - JACOW Team meeting preparations - IPAC'20 SPC/3 preparations, absract submissions - OPS CEBAF startup support - ODU PHYS854 teaching (with Geoff Krafft) - Madison Accelerator Lab annual telecon (Dec 2) - HOLIDAY (Nov 28-29, Thankgiving) - JACOW Team Meeting (Nov 30-Dec 7, attended remotely) Next two weeks (Dec 9 - Dec 20) - ADMIN 12 GeV PRAB paper planning/writing - MGMT Complete annual appraisals, AWP updates - JLEIC planning and organization, transfer line start - JLEIC ICR BPM start evaluation, calculations - JACOW Post-Team Meeting info transfer to new Directors - IPAC'20 SPC/3 preparations, abstract QA/reclassification - OPS CEBAF ops support, Hall D procedures development - ODU PHYS854 final exam (with Geoff Krafft) - VACATION (Dec 19-20)
Alex Bogacz
Previous two weeks (Dec 23 - Jan 3) - Vacation & Holidays - Lecture preparation for USPAS’20 Next two weeks (Jan 6 - Jan 17) - Invention disclosures - review - Teaching Accelerator Physics course at USPAS’20
Rui Li
Previous two weeks (Dec 23 - Jan 3) - Holiday vacations - Recap and planning for works Next two weeks (Jan 6 - Jan 17) - Finish writing up the technote on uneven bunch spectra - Study literature about impact of uneven bunch fill on coupled bunch instability behavior - Schedule and planning for the next JLEIC impedance meeting
Edy Nissen
Previous two weeks (Nov 25 - Dec 6) - I will be on extended medical leave Next two weeks (Dec 9 - Dec 20) - I will be on extended medical leave - I will put a little bit of time in to update my pre-proposal for for the DOE Early Career Award.
Chris Tennant
Previous two weeks (Dec 23 - Jan 3) - Shutdown/vacation - Administrative tasks (excessing desktop, spec'ing new laptop, answering e-mails, etc.) - Collected and sent Cheng-Ying CCR lattice material for collaborative work Next two weeks (Jan 6 - Jan 17) - Possible visit to CNU robotics lab - Start tracking distributions from Fay through CCR and evaluate performance - Prepping for AI presentation to DOE (meet with people about proposed projects)
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (Dec 23 - Jan 3) - shutdown/vacation Next two weeks (Jan 6 - Jan 17) -
Max Bruker
Previous (Dec 23 - Jan 3) - Vacation - Had a first look at some data from the IMP experiment Next (Jan 6 - Jan 17) - Plan and perform IMP data analysis - Tentatively: DC electron cooler discussion at Fermilab
Fanglei Lin
Previous two weeks (Dec 23 - Jan 3) - Holiday break Next two weeks (Jan 6 - Jan 17) - Work on simulations of spin transparency experiment - Work on the storage ring cooler project - Work on teaching material for the Spin@USPAS class
Bhawin Dhital
Previous two weeks (Dec 23 - Jan 3) - Learning python and data science with python. Took some online courses on python. - Preparing slides on ` beam cooling ' for coming USPAS . Next two weeks (Jan 6 - Jan 17) - Working with stability in a two energy storage ring cooler with ` Radiation on'. - Working on generalized formula for stability in a two - energy storage ring cooler. - Going to USPAS ( Jan 13 - Jan 24) San Diego, CA as a TA for "Accelerator Physics".
Vasiliy Morozov
Previous two weeks (Nov 25 - Dec 6) -Attended the EIC Ion Collider Research and Development Project (11/16 - 11/30/19) Next two weeks (Dec 9 - Dec 20) -Attended the EICUG Yellow Reports - Kick-off Meeting (12/11 - 12/13/19)
Amy Sy
Previous two weeks (Dec 23 - Jan 3): - Preparing Early Career Award pre-proposal for submission. - DTL phase optimization in H- ion linac in TRACK. Next two weeks (Jan 6 - Jan 17) - Continued work on getting the DTL portion of the ion linac working in PyORBIT. - Schottky signal analysis for latest IMP experiment as necessary.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (Nov 25 - Dec 6) - CEBAF: - - JLEIC: - - OTHER - Next two weeks (Dec 9 - Dec 20) -
Randi Gamage
Previous two weeks (Nov 25 - Dec 6) - Next two weeks (Dec 9 - Dec 20) -
River Huang
Previous two weeks (Nov 25 - Dec 6) - Continue working on EIC project Next two weeks (Nov 25 - Dec 6) -
Isurumali Neththikumara
Previous two weeks (Nov 25 - Dec 6) - Next two weeks (Dec 9 - Dec 20) -
Dennis Turner
Previous two weeks (Nov 25 - Dec 6) - Attended Accelerator AI projects meeting. - Addressed High Level Apps OPS-PRs generated during ops - eDT - DogCalc - QTSnyder - ArcSteer - Discussed with Tief a new RF cresting method using SLMs. - AIPINJ - Reconciled elegant deck with Alicia's GPT model. - 12GeV PRAB - Revised Optics Tuning section. - Completed first draft of Pathlength section. - Continued QTSnyder upgrade. - Attended BTeam, Injector Upgrade Modeling, AI Lunch meetings. - Took a few sick days for doctor appointments and such. Next two weeks (Dec 6 - Dec 20) - Provide Optics On-Call support through the end of the run. - Begin working with Tief on new cresting method with SLM. - Finish QTSnyder upgrade and write ATLis for testing. - Continue work on Injector upgrade elegant deck. - Continue work on assigned sections of the 12GeV PRAB paper. - Attend BTeam, Injector Upgrade, AI lunch, 12GeV PRAB meetings. - Continue exploring ML with Keras and TensorFlow, particularly for use at CEBAF.
He Zhang
Previous two weeks (Dec 23 - Jan 3) - Revised JSPEC for better management of the code. - Calculated the IBS rate for new lattices from Vasiliy. - Ao Liu, A scientist from Euclid Techlab, want to apply for an SBIR project on space charge effects and he wish Ji Qiang and I can join. Discussed with them and helped to write an LOI. Next two weeks (Jan 6 - Jan 17) - FOA Quarterly report. - Set up turn-by-turn tracking for IMP experiment and ion beam edge cooling.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (Nov 25 - Dec 6) - Next two weeks (Dec 9 - Dec 20) -
Joe Gubeli
Previous two weeks (Dec 23 - Jan 3) - Isotope Experiment – Helped with the two day run to the 1G dump. - Halo monitor – Conducted the Halo Monitor experiment in the LERF. - ARDDOT – Was able to install and run the Beamenizer on a Windows 10 machine. Next two weeks (Nov 11 - Nov 22) - Isotope Experiment – Help with the two day run to the 1X line. - ARDDOT – Start work on the other CEBAF SLMs
Michael Tiefenback
Previous two weeks (Nov 25 - Dec 6) - Next two weeks (Dec 9 - Dec 20) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (Nov 25 - Dec 6) - Assisted in run to the 1G dump with CW beam. Unfortunately we could not run beam. - Reviewed SBIR - Reviewed IPAC 2020 abstracts - Looked over new Phase II SBIRs - Met with diagnostics team to derive a plan for replacing the beam-a-nizer frame grabber at the LERF - Met with the magnet group and came up with a strategy for the kicker coils for RF merge test - Continued gathering documents for the ERR punch list - Planned for another run to the 1G dump Next two weeks (Dec 9 - Dec 20) - Assist with the run to the 1G dump - Certify User Lab 4 in the LERF - Host Michael Famiano for Acc. seminar (with Joe Grames) - Move excess equipment out of the LERF
Andrew Hutton
Previous two weeks (Dec 23 - Jan 3) - Before Christmas, I developed a scaling for the AWA-ANL defection cavity for JLEIC straight merger. I managed to find a parameter set that would enable the straight merger cavity to be a room-temperature copper cavity, rather than an SRF cavity. But it is a bit of a brute, so may not be the optimum. - After Christmas, I returned to AccApp 2020 preparations. I have already evaluated the Abstracts, now I am trying to develop a layout for each Session I am responsible for (4). - Jan 3, I am hosting Courtney Washington for a visit to the isotope irradiation area in the LERF vault. I promised her that I would invite her once she turned 18, which happened in November. Next two weeks Jan 6 - Jan 17) - I will complete the AccApp 202 preparations. - I have to prepare the first draft of the Quarterly Report for the Isotope Program. In addition, Doug Wells and I have a conference call with Ethan Balkin, the DOE Isotope Program Manager, to discuss the relative importance of Copper64 when mixed with Copper 67. - I leave for Vienna on January 9, returning on January 16, but will not come to the lab on January 17.