Difference between revisions of "2020-1-5-LeadershipReports"

From Administrative
Jump to navigation Jump to search
Line 271: Line 271:
 
Joe Gubeli
 
Joe Gubeli
  
     Previous two weeks (Nov 11 - Nov 22)
+
     Previous two weeks (Dec 23 - Jan 3)
       - Isotope Experiment – Prepare for a two day run to the 1G dump. Worked with I&C to fix problems with viewers. Created a test setup for
+
       - '''Isotope Experiment –''' Helped with the two day run to the 1G dump.
        the LERF Cameras. These cameras can now be set correctly (gain, black level, sharpness and gamma) as well as verified to work on the
+
       - '''Halo monitor –''' Conducted the Halo Monitor experiment in the LERF.
        Beamenizer.
+
       - '''ARDDOT ''' Was able to install and run the Beamenizer on a Windows 10 machine.
       - Halo monitor – Run delayed a week.
 
       - HPWS Printed a pneumatic cylinder holder for the air balancer. It and the cylinder was installed and tested.
 
 
     Next two weeks (Nov 11 - Nov 22)
 
     Next two weeks (Nov 11 - Nov 22)
       - Isotope Experiment – Help with the two day run to the 1G dump.
+
       - '''Isotope Experiment –''' Help with the two day run to the 1X line.
       - Halo monitor Conduct the Halo Monitor experiment in the LERF.
+
       - '''ARDDOT ''' Start work on the other CEBAF SLMs
      - DPIT – Discuss the future of the LERF Video system
+
 
  
  

Revision as of 11:35, 15 January 2020

Dec 5 2019 Report - Nov 25 - Dec 20 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Nov 25 - Dec 6)
     - ADMIN 12 GeV PRAB paper planning/writing
     - MGMT Continue annual appraisals, AWP updates
     - JLEIC planning and organization, cooling studies
     - JACOW Team meeting preparations
     - IPAC'20 SPC/3 preparations, absract submissions
     - OPS CEBAF startup support
     - ODU PHYS854 teaching (with Geoff Krafft)
     - Madison Accelerator Lab annual telecon (Dec 2)
     - HOLIDAY (Nov 28-29, Thankgiving)
     - JACOW Team Meeting (Nov 30-Dec 7, attended remotely)
  Next two weeks (Dec 9 - Dec 20)
     - ADMIN 12 GeV PRAB paper planning/writing
     - MGMT Complete annual appraisals, AWP updates
     - JLEIC planning and organization, transfer line start
     - JLEIC ICR BPM start evaluation, calculations
     - JACOW Post-Team Meeting info transfer to new Directors
     - IPAC'20 SPC/3 preparations, abstract QA/reclassification
     - OPS CEBAF ops support, Hall D procedures development
     - ODU PHYS854 final exam (with Geoff Krafft)
     - VACATION (Dec 19-20)




Alex Bogacz

  Previous two weeks (Dec 23 - Jan 3) 
     - Vacation & Holidays
     -	Lecture preparation for USPAS’20
  Next two weeks (Jan 6 - Jan 17)
     - Invention disclosures - review
     -	Teaching Accelerator Physics course at USPAS’20




Rui Li

  Previous two weeks (Dec 23 - Jan 3)
     - Holiday vacations
     - Recap and planning for works
  Next two weeks (Jan 6 - Jan 17) 
     - Finish writing up the technote on uneven bunch spectra
     - Study literature about impact of uneven bunch fill on coupled bunch instability behavior
     - Schedule and planning for the next JLEIC impedance meeting



Edy Nissen

   Previous two weeks (Nov 25 - Dec 6)
     - I will be on extended medical leave
   Next two weeks (Dec 9 - Dec 20)
     - I will be on extended medical leave
     - I will put a little bit of time in to update my pre-proposal for for the DOE Early Career Award.



Chris Tennant

   Previous two weeks (Dec 23 - Jan 3)
     - Shutdown/vacation
     - Administrative tasks (excessing desktop, spec'ing new laptop, answering e-mails, etc.)
     - Collected and sent Cheng-Ying CCR lattice material for collaborative work
   Next two weeks (Jan 6 - Jan 17)
     - Possible visit to CNU robotics lab
     - Start tracking distributions from Fay through CCR and evaluate performance
     - Prepping for AI presentation to DOE (meet with people about proposed projects)





Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Dec 23 - Jan 3)
     - shutdown/vacation
  Next two weeks (Jan 6 - Jan 17)
     - 


Max Bruker

  Previous (Dec 23 - Jan 3)
     -	Vacation
     - Had a first look at some data from the IMP experiment
  Next (Jan 6 - Jan 17)
     - Plan and perform IMP data analysis
     - Tentatively: DC electron cooler discussion at Fermilab



Fanglei Lin

  Previous two weeks (Dec 23 - Jan 3)
       - Holiday break
  Next two weeks (Jan 6 - Jan 17)
       - Work on simulations of spin transparency experiment
       - Work on the storage ring cooler project
       - Work on teaching material for the Spin@USPAS class




Bhawin Dhital

   Previous two weeks (Dec 23 - Jan 3)
     - Learning python and data science with python. Took some online courses on python.
     - Preparing slides on ` beam cooling ' for coming USPAS .
   Next two weeks (Jan 6 - Jan 17)
     - Working with stability in a two energy storage ring cooler with ` Radiation on'.
     - Working on generalized formula for stability in a two - energy storage ring cooler.
     - Going to USPAS ( Jan 13 - Jan 24) San Diego, CA as a TA for "Accelerator Physics".


Vasiliy Morozov

   Previous two weeks (Nov 25 - Dec 6)
     -Attended the EIC Ion Collider Research and Development Project (11/16 - 11/30/19)
   Next two weeks (Dec 9 - Dec 20)
     -Attended the EICUG Yellow Reports - Kick-off Meeting (12/11 - 12/13/19)




Amy Sy

   Previous two weeks (Dec 23 - Jan 3):
     - Preparing Early Career Award pre-proposal for submission.
     - DTL phase optimization in H- ion linac in TRACK.
   Next two weeks (Jan 6 - Jan 17)
     - Continued work on getting the DTL portion of the ion linac working in PyORBIT.
     - Schottky signal analysis for latest IMP experiment as necessary.






Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Nov 25 - Dec 6)
     - CEBAF:
          - 
     - JLEIC:
          -     
     - OTHER
          - 
   Next two weeks (Dec 9 - Dec 20)
     - 



Randi Gamage

   Previous two weeks (Nov 25 - Dec 6)
     - 
   Next two weeks (Dec 9 - Dec 20)
     - 


River Huang

   Previous two weeks (Nov 25 - Dec 6)
     - Continue working on EIC project
   Next two weeks (Nov 25 - Dec 6)
     -


Isurumali Neththikumara

   Previous two weeks (Nov 25 - Dec 6)
     - 
   Next two weeks (Dec 9 - Dec 20)
     - 



Dennis Turner

   Previous two weeks (Nov 25 - Dec 6)
     - Attended Accelerator AI projects meeting.
     - Addressed High Level Apps OPS-PRs generated during ops
         - eDT
         - DogCalc
         - QTSnyder
         - ArcSteer
     - Discussed with Tief a new RF cresting method using SLMs.
         - AIPINJ
             - Reconciled elegant deck with Alicia's GPT model.
     - 12GeV PRAB
         - Revised Optics Tuning section.
         - Completed first draft of Pathlength section.
     - Continued QTSnyder upgrade.
     - Attended BTeam, Injector Upgrade Modeling, AI Lunch meetings.
     - Took a few sick days for doctor appointments and such.
   Next two weeks (Dec 6 - Dec 20)
     - Provide Optics On-Call support through the end of the run.
     - Begin working with Tief on new cresting method with SLM.
     - Finish QTSnyder upgrade and write ATLis for testing.
     - Continue work on Injector upgrade elegant deck.
     - Continue work on assigned sections of the 12GeV PRAB paper.
     - Attend BTeam, Injector Upgrade, AI lunch, 12GeV PRAB meetings.
     - Continue exploring ML with Keras and TensorFlow, particularly for use at CEBAF.



He Zhang

   Previous two weeks (Dec 23 - Jan 3)     
     - Revised JSPEC for better management of the code. 
     - Calculated the IBS rate for new lattices from Vasiliy.
     - Ao Liu, A scientist from Euclid Techlab, want to apply for an SBIR project on space charge effects and he wish Ji Qiang and I can join.
       Discussed with them and helped to write an LOI. 
   Next two weeks (Jan 6 - Jan 17) 
     - FOA Quarterly report.
     - Set up turn-by-turn tracking for IMP experiment and ion beam edge cooling. 
 



Diagnostic Development - Kevin Jordan

Kevin Jordan

   Previous two weeks (Nov 25 - Dec 6)
     - 
   Next two weeks (Dec 9 - Dec 20)
     - 



Joe Gubeli

   Previous two weeks (Dec 23 - Jan 3)
     - Isotope Experiment – Helped with the two day run to the 1G dump.
     - Halo monitor – Conducted the Halo Monitor experiment in the LERF.
     - ARDDOT – Was able to install and run the Beamenizer on a Windows 10 machine.
   Next two weeks (Nov 11 - Nov 22)
     - Isotope Experiment – Help with the two day run to the 1X line.
     - ARDDOT – Start work on the other CEBAF SLMs



Michael Tiefenback

   Previous two weeks (Nov 25 - Dec 6)
     - 
   Next two weeks (Dec 9 - Dec 20)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Nov 25 - Dec 6)
     - Assisted in run to the 1G dump with CW beam. Unfortunately we could not run beam.
     -	Reviewed SBIR
     - Reviewed IPAC 2020 abstracts
     -	Looked over new Phase II SBIRs
     - Met with diagnostics team to derive a plan for replacing the beam-a-nizer frame grabber at the LERF
     -	Met with the magnet group and came up with a strategy for the kicker coils for RF merge test
     -	Continued gathering documents for the ERR punch list
     -	Planned for another run to the 1G dump
   Next two weeks (Dec 9 - Dec 20)
     - Assist with the run to the 1G dump
     -	Certify User Lab 4 in the LERF
     -	Host Michael Famiano for Acc. seminar (with Joe Grames)
     -	Move excess equipment out of the LERF



Andrew Hutton

   Previous two weeks (Dec 23 - Jan 3)
     - Before Christmas, I developed a scaling for the AWA-ANL defection cavity for JLEIC straight merger.  I managed to find a parameter set 
       that would enable the straight merger cavity to be a room-temperature copper cavity, rather than an SRF cavity.  But it is a bit of a 
       brute, so may not be the optimum.  
     - After Christmas, I returned to AccApp 2020 preparations.  I have already evaluated the Abstracts, now I am trying to develop a layout
       for each Session I am responsible for (4).  
     - Jan 3, I am hosting Courtney Washington for a visit to the isotope irradiation area in the LERF vault.  I promised her that I would
       invite her once she turned 18, which happened in November.  
   Next two weeks Jan 6 - Jan 17)
     - I will complete the AccApp 202 preparations.  
     - I have to prepare the first draft of the Quarterly Report for the Isotope Program.  In addition, Doug Wells and I have a conference call
       with Ethan Balkin, the DOE Isotope Program Manager, to discuss the relative importance of Copper64 when mixed with Copper 67.  
     - I leave for Vienna on January 9, returning on January 16, but will not come to the lab on January 17.