Difference between revisions of "2020-9-10-LeadershipReports"

From Administrative
Jump to navigation Jump to search
 
Line 17: Line 17:
 
       - OPS Daily 07:45/08:00, weekly W 1:30
 
       - OPS Daily 07:45/08:00, weekly W 1:30
 
       - ODU Meetings (Xelera weekly, Isurumali beam-beam, Bhawin)
 
       - ODU Meetings (Xelera weekly, Isurumali beam-beam, Bhawin)
   '''Next two weeks (Aug 17 - Aug 28)'''  
+
   '''Next two weeks (Aug 31 - Sept 11)'''  
 
       -  
 
       -  
  
Line 104: Line 104:
 
'''Yuhong Zhang'''
 
'''Yuhong Zhang'''
  
   '''Previous two weeks (May 11 - May 22)'''
+
   '''Previous two weeks (Aug 17 - Aug 28)'''
 
       -   
 
       -   
   '''Next two weeks (May 25 - Jun 5)'''
+
   '''Next two weeks (Aug 31 - Sept 11)'''
 
       -  
 
       -  
  
Line 114: Line 114:
 
'''Max Bruker'''
 
'''Max Bruker'''
  
   '''Previous (Aug 31 - Sept 11)'''
+
   '''Previous (Aug 17 - Aug 28)'''
       - Linac 2020 conference
+
       - Beam loading calculations; maybe I've finally figured out what I need to do
      - Lots of fun at the UITF. Very nice machine with just the right size. I haven't touched a lot of hardware so far but got to play with the
+
       - EIC CDR edits
        beam and learn the controls.
+
   '''Next (Aug 31 - Sept 11)'''
       - The IMP paper is back from the review. There is some homework to be done but nothing backbreaking.
+
       - RF simulations continue
   '''Next (Sept 14 - Sept 25)'''
+
       - Potential involvement in UITF Run1
       - IBIC
+
       - Linac 2020 conference
       - More UITF fun
+
 
       - IBS and cooling simulations to back up the experimental results presented in the IMP paper. We should aim for resubmission of the
 
        manuscript within 1--2 weeks.
 
 
 
  
  
Line 214: Line 211:
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Yves Roblin'''
 
'''Yves Roblin'''
     Previous two weeks (May 28 - Jun 5)
+
     Previous two weeks (Aug 17 - Aug 28)
       - Beam-beam meetings,
+
       -  
      - Wrote notes on how to determine tunes by tracking in elegant
+
     Next two weeks (Aug 31 - Sept 11)
      - New method to calculate tune diffusion implemented in python
+
       -  
      - Bteam meetings, support for restart
 
      - AI meetings, litterature search and reading on AI, in particular the
 
      - Concept of using streaming AI's for CEBAF data.
 
      - Vacation (June 1-5th)
 
     Next two weeks (Jun 8 - Jun 19)
 
       - Build the latest (very latest, from the subversion branch.) Pelegant for the farm
 
      - Wrote scripts for bhawin to allow for running Pelegant with multiple processors and across computing nodes using SLURM.
 
      - Next, will attempt to rebuild bb3d and do the same for it. (it is currently limited to running multiple processors but only on one node)
 
      - AI lunch series, AI reading, working on drafting proposals for using streaming AIs in order to process the CEBAF data
 
      - Bteam, getting ready for restart, discussions with Hall A/C regarding engineered controls for beam excursions
 
 
 
  
  
Line 235: Line 221:
 
'''Randi Gamage'''
 
'''Randi Gamage'''
  
     '''Previous two weeks (May 11 - May 22)'''
+
     '''Previous two weeks (Aug 17 - Aug 28)'''
 
       -  
 
       -  
     '''Next two weeks (May 25 - Jun 5)'''
+
     '''Next two weeks (Aug 31 - Sept 11)'''
 
       -  
 
       -  
  
Line 244: Line 230:
 
'''River Huang'''
 
'''River Huang'''
  
     '''Previous two weeks (May 28 - Jun 5)'''
+
     '''Previous two weeks (Aug 17 - Aug 28)'''
       - Doing the particle tracking (with / without H-kick and V-kick) using CASA Beam-Beam scripts For JLEIC ring and BNL EIC ring.
+
       -  
      - CASA Beam-Beam package
+
     '''Next two weeks (Aug 31 - Sept 11)'''
          - Optimizing phase coordinates output of CASA Beam-Beam.
+
       -  
     '''Next two weeks (Jun 8 - Jun 19)'''
 
       - Continue working on EIC project.
 
 
 
  
  
 
'''Isurumali Neththikumara'''
 
'''Isurumali Neththikumara'''
  
     '''Previous two weeks (May 11 - May 22)'''
+
     '''Previous two weeks (Aug 17 - Aug 28)'''
 
       -  
 
       -  
     '''Next two weeks (May 25 - Jun 5)'''
+
     '''Next two weeks (Aug 31 - Sept 11)'''
 
       -  
 
       -  
  
Line 266: Line 249:
 
'''Dennis Turner'''
 
'''Dennis Turner'''
  
     '''Previous two weeks (May 11 - May 22)'''
+
     '''Previous two weeks (Aug 17 - Aug 28)'''
       - Attended IPAC talks
+
       - '''CEBAF'''
 +
          - Secondary Optics On-Call
 +
          - Hall B CED discrepancy
 +
          - Hall B background rates
 +
          - Hall A energy drift
 +
      - '''UITF'''
 +
          - Continue optics support: testing qsUtility, UED setup, optics measurements, etc.
 
       - '''HLA'''
 
       - '''HLA'''
           - Released new version of eDT in response to feature requests from Ops.
+
           - Continue testing and debugging rayTrace
 
       - '''AIPINJ'''
 
       - '''AIPINJ'''
           - Continue finalizing optics in the elegant model
+
           - Import deck into CED once element names and coordinates are finalized
           - Further explored numerical solutions for QW settings vs Wien settings
+
           - Build deck for 130keV run with upgraded beamline up to chopper, existing beamline from chopper to quarter
          - Presented latest optics at AIPINJ meeting, resulting in a list of
+
       - Attend 0745/0800, BTeam, CASA, AIPINJ meetings
       - Attended CASA, BTeam, AIPINJ meetings
+
       - Attend Accelerator Seminars and other lectures as available
       - Attended Accelerator Seminars and AI Lunch Series talks
+
     '''Next two weeks (Aug 31 - Sept 11)'''
      - Caught up with reading various papers on Wien filters, optics, etc.
 
     '''Next two weeks (May 25 - Jun 5)'''
 
 
       - '''AIPINJ'''
 
       - '''AIPINJ'''
         - Continue (and hopefully finish) finalizing optics
+
         -  
        - Camille will be requesting a review soon; prepare slides
+
       -  
      - Explore implementing the beta matching using beam jitter from the paper Jay sent around
 
      - Attend CASA, BTeam, AIPINJ meetings
 
      - Attend Accelerator Seminars and AI Lunch Series talks
 
       - Continue with online training opportunities as time permits
 
  
  
Line 309: Line 292:
 
'''Kevin Jordan'''
 
'''Kevin Jordan'''
  
   '''Previous two weeks (May 11 - May 22)'''
+
   '''Previous two weeks (Aug 17 - Aug 28)'''
 
       -  
 
       -  
   '''Next two weeks (May 25 - Jun 5)'''
+
   '''Next two weeks (Aug 31 - Sept 11)'''
 
       -   
 
       -   
  
Line 337: Line 320:
 
'''Michael Tiefenback'''
 
'''Michael Tiefenback'''
  
     '''Previous two weeks (May 11 - May 22)'''
+
     '''Previous two weeks (Aug 17 - Aug 28)'''
 
       -  
 
       -  
     '''Next two weeks (May 25 - Jun 5)'''
+
     '''Next two weeks (Aug 31 - Sept 11)'''
 
       -  
 
       -  
  

Latest revision as of 10:30, 16 September 2020

September 10 2020 Report - Aug 17 - Sept 11 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Aug 17 - Aug 28) 
     - EIC Analysis of Alternatives review post-meetings
     - EIC Mini-MAC prep/dry run (Aug 17-18); review (Aug 26/28)
     - EIC CDR editing, editorial review, integration (much work)
     - EIC Meetings (impedance, RCS task force; CDR editorial; physics; planning/project; start weekly L2 meetings)
     - EIC EIC/FCC planning discussions
     - EIC OPA review early draft slide preparations
     - MGMT Meetings (Leadership/Dept Heads, CASA coffee, Accel Div Diversity survey)
     - MGMT P&C Meeting (Aug 24)
     - ADMIN Finish Snowmass LOI planning, emails
     - ADMIN APS DPB Exec Committee quarterly meeting (Aug 28)
     - OPS Daily 07:45/08:00, weekly W 1:30
     - ODU Meetings (Xelera weekly, Isurumali beam-beam, Bhawin)
  Next two weeks (Aug 31 - Sept 11) 
     - 




Alex Bogacz

  Previous two weeks (Aug 17 - Aug 28) 
     - Machine support
     -	Letter of intent on Twin Axis Cavity
     -	Write up on ‘Site Filler’ and ‘CEBAF FFA Upgrade’
     -	Publications, Awards Committee 
  Next two weeks (Aug 31 - Sept 11)
     - Machine support
     -	ER@CEBAF optics revisit
     -	Muon acceleration paper
     -	PRAB paper review





Rui Li

  Previous two weeks (Aug 17 - Aug 28)
     - Going through microwave instability threshold analysis by Stupakov and Heifets
     - Use Mathematica to calculate CSR in eSR of EIC, using Murphy's paper for shielding of parallel plate. Compare with Alexei Blednyke's CSR
       results from Demin Zhou's code
     - Check literature for transient CSR with shielding effect for the split dipole in eSR of EIC
     - Planning for TCBI modeling for eSR of EIC
     - Participate task force meetings and discussions on impedance in eSR of EIC
     - Continue attending meeting and discussion in ALS-U impedance studies
  Next two weeks (Aug 31 - Sept 11) 
     - Attend LINAC 2020
     - Calculate more results for my technote on beam spectra for uneven bunch fill
     - Worked on planning the modeling of transverse coupled-bunch instability for eSR in EIC
     - Participate task force meetings and discussions on impedance in eSR of EIC
     - Continue attending meeting and discussion in ALS-U impedance studies




Edy Nissen

   Previous two weeks (Jun 8 - Jun 19)
     - Attended task force meetings
     - Performed beam beam simulations for the beam beam task force
     - Worked on analysis of DODGE data
     - Gave R&D meeting talk about DODGE
   Next two weeks (Jun 22 - Jul 2)
     - Continue simulations for task forces
     - Continue analysis of DODGE data



Chris Tennant

   Previous two weeks (Aug 17 - Aug 28)
     - Coordinate efforts for beam studies to collect data for Smart Alarm (SBIR)
     - Follow-up on a number of papers/topics from KDD conference about possible applications at JLab 
     - Review E. Nissen manuscript
     - Review L. Vidyaratne Tech Note (JLAB-TN-20-027)
     - AI lunch (web, administrative, public affairs, etc.)
   Next two weeks (Aug 31 - Sept 11)
     - AI lunch (web, administrative, public affairs, etc.)
     - Prep talk for SLAC AI Seminar




Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Aug 17 - Aug 28)
     -  
  Next two weeks (Aug 31 - Sept 11)
     - 



Max Bruker

  Previous (Aug 17 - Aug 28)
     - Beam loading calculations; maybe I've finally figured out what I need to do
     - EIC CDR edits
  Next (Aug 31 - Sept 11)
     - RF simulations continue
     -	Potential involvement in UITF Run1
     -	Linac 2020 conference




Fanglei Lin

  Previous two weeks (Aug 17 - Aug 28)
     - Continuing the work on the task force on novel techniques for ESR polarization improvement  
     - Studying electron polarization in the eSR on benchmarking results from SLICK, SITRO and Bmad 
     - Continuing the working on the storage ring cooler project  
     - Miscellaneous: attended the EIC hadron polarization meeting, attended the EIC low energy luminosity/facility optimization meeting,
       attended EIC design team meeting, attended alternate strong cooling task force meeting, attended the Storage Ring Cooler meeting, 
       attended the Innovative HE Cooling Project Status meeting, attended the EIC Accelerator Design meeting, attended the EIC general 
       meeting, attended the Machine Advisory Committee Meeting 
  Next two weeks (Aug 31 - Sept 11)
     - Work on the task force on novel techniques for eSR polarization improvement 
     - Study the polarization in the eSR 
     - Work on the storage ring cooler project  




Bhawin Dhital

   Previous two weeks (Aug 17 - Aug 28)
     - Learning post processing of output data from elegant simulation using ifarm.
     - Calculation of damped equilibrium emittance and energy spread values from elegant simulation.
     - Further understanding dynamic aperture, momwntum aperture and Touschek's lifetime in dual energy storage ring
   Next two weeks (Aug 31 - Sept 11)
     - I have learned sddsprocess for data analysis after elegant job output. Damped equilibrium values are calculated using sddsprocess and 
       using Jupyter note-book. Results are promising.
     - I was taking Polarized He3 experimental shifts at Hall C. I was taking 6 swing shifts from September 07 to September 13. Now all shifts
       are completed and
     - I think my name will appear for two papers in the future based on that Polarized helium3 experiment.
     - I was trying to understand the best way to calculate dynamic aperture and Frequency Map Analysis (FMA) for the whole two rings.



Vasiliy Morozov

   Previous two weeks (Aug 17 - Aug 28)
     - Work on the task force on novel techniques for eSR polarization improvement 
     - Study the polarization in the eSR 
     - Work on the storage ring cooler project  
   Next two weeks (Aug 31 - Sept 11)
     - Electron and ion polarization: 
         - effect of the detector solenoid in combination with orbit corrector on the ion polarization, 
         - effect of crabbing kicks on the electron and ion polarizations, 
         - calculation of the electron and ion polarization lifetimes,
   - 2nd IR design: lattice design, calculation of the parasitic beam-beam tune shift
   - Adjusting coupling in the electron collider ring at 10 GeV and providing input to beam-beam simulations 





Amy Sy

   Previous two weeks (Aug 17 - Aug 28)
     - CDR chapter/appendix reading.
     - Collecting and editing inputs for the August 2020 EIC Design Update Newsletter.
     - Submitted input to EIC Biweekly report.
     - Attended EIC  mini MAC review.
     - Attended various meetings on second IR-related topics.
   Next two weeks (Aug 31 - Sept 11)
     - Completed August 2020 EIC Design Update Newsletter.
     - MADX optimization of integrated solenoid/quadrupole/skew quadrupole fields for a compact spin rotator. Working on solutions that match
       to the existing optics for both solenoids.
     - Attended various meetings on second IR-related topics.







Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Aug 17 - Aug 28)
     - 
   Next two weeks (Aug 31 - Sept 11)
     - 



Randi Gamage

   Previous two weeks (Aug 17 - Aug 28)
     - 
   Next two weeks (Aug 31 - Sept 11)
     - 


River Huang

   Previous two weeks (Aug 17 - Aug 28)
     - 
   Next two weeks (Aug 31 - Sept 11)
     - 


Isurumali Neththikumara

   Previous two weeks (Aug 17 - Aug 28)
     - 
   Next two weeks (Aug 31 - Sept 11)
     - 



Dennis Turner

   Previous two weeks (Aug 17 - Aug 28)
     - CEBAF 
          - Secondary Optics On-Call
          - Hall B CED discrepancy
          - Hall B background rates
          - Hall A energy drift
     - UITF
          - Continue optics support: testing qsUtility, UED setup, optics measurements, etc.
     - HLA
          - Continue testing and debugging rayTrace
     - AIPINJ
          - Import deck into CED once element names and coordinates are finalized
          - Build deck for 130keV run with upgraded beamline up to chopper, existing beamline from chopper to quarter
     - Attend 0745/0800, BTeam, CASA, AIPINJ meetings
     - Attend Accelerator Seminars and other lectures as available
   Next two weeks (Aug 31 - Sept 11)
     - AIPINJ
        - 
     - 



He Zhang

   Previous two weeks (Aug 17 - Aug 28)     
     - Performed a few simulations for EIC alternative cooling. 
     - Finished two Snowmass LOIs and contributed to another one. 
   Next two weeks (Aug 31 - Sept 11) 
     - Submit the Snowmass LOIs.
     - Test JSPEC python wrapper.
     - Finish coding the IBS formula. 




Diagnostic Development - Kevin Jordan

Kevin Jordan

  Previous two weeks (Aug 17 - Aug 28)
     - 
  Next two weeks (Aug 31 - Sept 11)
     -  



Joe Gubeli

   Previous two weeks (Aug 17 - Aug 28)
     - Isotopes –Attended several planning meetings. Setup some equipment needed for next week’s run
     - ARDDOT - Had a few meeting with the Injector group to determine if the new viewer image design would work for them. They have some
       very tight spaces. Met with the I&C group to show them the viewer imager and to test a lipstick replacement camera. The tested camera 
       has an nonadjustable lens an images a lot of the tube with a small image of the view screen. Not sure that it is a good replacement. The
       I&C folks had to run to another call and didn’t have time to assemble an imager. We will reschedule for another time. Have inventoried
       and conveniently placed all the parts received for the imager. Still have a few parts including the cameras that have not arrived.
   Next two weeks (Aug 31 - Sept 11)
     - Isotopes – Help as much as possible with the upcoming experimental run.
     - ARDDOT – Work with I&C on imager assembly
     - ACCTVL – Attend the virtual IBIC2020 Conference.



Michael Tiefenback

   Previous two weeks (Aug 17 - Aug 28)
     - 
   Next two weeks (Aug 31 - Sept 11)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Aug 17 - Aug 28)
     - Discussed transfer of funds for new FOAs with Manouchehr Farkhondeh
     - Worked to get new project allocation for FOA project
     - Worked with D. Douglas to develop CeC ERL design concept
     - Recorded and submitted presentation for Linac 2020
     - Reviewed PRAB paper
     - Sent out punch list for LERF startup
   Next two weeks (Aug 31 - Sept 11)
     - Attend Linac 2020 and present talk
     - Write contribution to Cooling Alternatives Document
     - Submit request to re-allocate FOA funds to M. Farkhondeh
     - Present status of Low Energy Cooling Task Force at the Wednesday EIC Research meeting
     - Get LOSP for Drive Laser Enclosure submitted and approved
     - Modify Isotope run plans for Ga_71 exposures
     - Develop ATLis’ for isotope runs
     - Review MCBI paper




Andrew Hutton

   Previous two weeks (Aug 17 - Aug 28)
     - I was on vacation the week of August 17 - 24.  
     - This week I started to look over the EIC CDR for a second time; I also attended several EIC meetings.  
     - I participated in a VNECA meeting and sent an email to Stuart and Andrei regarding the draft “Virginia is Nuclear Strategic Plan 2020-
       2024” which I also forwarded.  
     - I also participated inn an early morning videoconference with Stuart, Andrei, Achille Stocchi (Director of IJCLab), Max Klein and Oliver
       Brüning regarding PERLE.  The Europeans made a concerted effort to convince Stuart and Andrei of the importance of Jefferson Lab 
       involvement in PERLE, perhaps with some success.  In addition, I have been answering questions from the DOE regarding the PERLE ICRADA 
       (Jessie Tenbusch has been an enormous help in this).  
     - I have prepared a request to the Experiment Review Committee to carry out a calibration run in addition to the irradiations already 
       partially approved.  Interesting new fact: there are now two FLUKAs;  FLUKA2020 from INFN and FLUKA 4.0 from CERN.  We are trying to 
       find out if they are the same or different!  
     - I missed the meeting on the organization of a Linear Collider Workshop while I was on vacation; I distributed the information to Stuart,
       Andrei, Mike Spata and Todd.  
   Next two weeks (Aug 31 - Sept 11)
     - I attended various EIC meetings.  I also spent some time studying the draft report from the Alternate Strong Cooling Task Force. This 
       resulted in a suggestion to Geoff and Fanglei to shorten the high energy section of the dual ring cooler; I sent the same recommendation
       to Jorg Kewish for the single ring cooler.  I proposed a method to arrange the cross-over between the high and low energy sections of 
       the dual energy cooler using twin-axis SRF cavities.  Finally, I suggested to Jorg that he modify the wiggler design he developed for 
       the single ring cooler to be compatible with the high energy section of the dual axis cooler ring.  
     - The modified (and much improved) PERLE ICRADA was sent to the DOE.  
     - We have been making detailed plans for the Isotope Irradiations, scheduled for September 13 - 19.  
     - I have been active on the AWLC 2020 organization, proposing three talks from Jefferson Lab, which were accepted.