Difference between revisions of "2021-6-24-LeadershipReports"

From Administrative
Jump to navigation Jump to search
(Created page with "June 24, 2021 Report - June 7 - July 2''' '''Director - Todd Satogata''' <br> '''Todd Satogata''' '''Previous two weeks (June 7 - June 18)''' - EIC Meetings (manag...")
 
Line 34: Line 34:
 
'''Alex Bogacz'''
 
'''Alex Bogacz'''
 
    
 
    
   '''Previous two weeks (May 24 - June 4)'''
+
   '''Previous two weeks (June 7 - June 18)'''  
      - Attending IPAC’21
 
      - Presenting Summer Students lecture on ‘Introduction to Accelerators ’
 
      - ERL Roadmap Panel - writeup on ‘the LHeC ERL’
 
      - Mentoring  Rishi
 
      - FFA@CEBAF multi-pass linac optics
 
  '''Next two weeks (June 7 - June 18)'''
 
 
       - One-on-one with Rishi
 
       - One-on-one with Rishi
 
       - ERL Roadmap Panel - writeup on the LHeC ERL
 
       - ERL Roadmap Panel - writeup on the LHeC ERL
Line 46: Line 40:
 
       - Letter of recommendation for Ben Hounsell  
 
       - Letter of recommendation for Ben Hounsell  
 
       - Serving as a conveners for Muon Collider Roadmap Panel
 
       - Serving as a conveners for Muon Collider Roadmap Panel
 +
  '''Next two weeks (June 21 - July 2)'''
 +
      - Attending Source Group mtg. on positron production channels
 +
      - Mentoring Rishi
 +
      - Coordinating/writing a PRAB paper on ‘Beam Dynamics Driven PERLE Design’
 +
      - Update on FFA@CEBAF at CBETA monthly mtg.
 +
      - DIS’21 proceedings  - composing paper on PERLE
  
  
Line 55: Line 55:
 
'''Ryan Bodenstein'''
 
'''Ryan Bodenstein'''
 
    
 
    
   '''Previous two weeks (May 24 - June 4)'''
+
   '''Previous two weeks (June 7 - June 18)'''  
      - IPAC21 Attendence
 
      - LDRD Proposal submitted on May 28th
 
      - Summer student – help with project definition and guidance
 
      - Help with guidance of Isurumali
 
      - B-Team
 
      - FFA@CEBAF collaboration
 
  '''Next two weeks (June 7 - June 18)'''
 
 
       - Operations meetings
 
       - Operations meetings
 
       - B-Team meetings
 
       - B-Team meetings
 
       - Radworker I training test (passed)
 
       - Radworker I training test (passed)
       - Radworker I training practical (scheduled for 15th)
+
       - Radworker I training practical (passed)
 
       - MAC training for MCC/CEBAF (for channel access)
 
       - MAC training for MCC/CEBAF (for channel access)
 
       - Summer Student guidance
 
       - Summer Student guidance
 
       - FFA@CEBAF collab work
 
       - FFA@CEBAF collab work
 
       - LDRD questions and updates
 
       - LDRD questions and updates
 +
  '''Next two weeks (June 21 - July 2)'''
 +
      - Operations meetings
 +
      - B-Team meetings
 +
      - MAC training for MCC/CEBAF (complete)
 +
      - Summer Student guidance
 +
      - FFA@CEBAF collab work
 +
      - Positron/FFA liaison work initial meeting
 +
      - Tunnel Cleanup
 +
      - PERLE collaboration meeting
 +
  
  
Line 81: Line 84:
 
'''Rui Li'''
 
'''Rui Li'''
 
    
 
    
   '''Previous two weeks (May 24 - June 4)'''
+
   '''Previous two weeks (June 7 - June 18)'''
      - Attend IPAC 2021
 
      - Finishing up my two IPAC papers
 
  '''Next two weeks (June 7 - June 18)'''  
 
 
       - Vacation 6/7-11
 
       - Vacation 6/7-11
 
       - Attending CeC monthly review meeting  
 
       - Attending CeC monthly review meeting  
 
       - Attending EIC impedance/instability meeting
 
       - Attending EIC impedance/instability meeting
 
       - Proceed with the tune scan for my study of the interplay between coherent beam-beam and coupled-bunch instability  
 
       - Proceed with the tune scan for my study of the interplay between coherent beam-beam and coupled-bunch instability  
 +
  '''Next two weeks (June 21 - July 2)'''
 +
      - Vacation 6/24-25
 +
      - Attending EIC impedance/instability meeting
 +
      - Attending EIC weekly meeting at JLAB
 +
      - Reading references on coherent beam-beam instability (CBB) and its instability threshold in tune space
 +
      - Think about ways to improve the code for eliminating tune dependence of growth rate caused by the modeling algorithm
  
  
Line 98: Line 104:
 
'''Edy Nissen'''
 
'''Edy Nissen'''
 
    
 
    
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
       - Attended IPAC 2021
+
       - Attended beam-beam task force meetings
            - 1 contributed talk
+
      - Worked on proceedings papers for IPAC
            - 2 posters
+
       - Worked on updating DODGE paper
       - Gave SAD update at GlueX collaboration meeting
+
       - Half day off on June 17
       - Was on vacation June 1-4
+
     '''Next two weeks (June 21 - July 2)'''
     '''Next two weeks (June 7 - June 18)'''
+
       - Attending beam-beam task force meetings
       - Attending EIC beam-beam meetings
+
       - Work on DODGE paper
       - Attend Bteam meetings
+
       - Judge for JLUO student poster contest
      - Correct proceedings papers
 
      - Adding new data to DODGE paper for resubmission
 
       - Communicating with KARVE group at Los Alamos for possible future collaboration
 
  
  
Line 122: Line 125:
 
'''Chris Tennant'''
 
'''Chris Tennant'''
 
    
 
    
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
 
       -  
 
       -  
     '''Next two weeks (June 7 - June 18)'''
+
     '''Next two weeks (June 21 - July 2)'''
 
       -  
 
       -  
  
Line 139: Line 142:
 
'''Yuhong Zhang'''
 
'''Yuhong Zhang'''
  
   '''Previous two weeks (May 24 - June 4)'''
+
   '''Previous two weeks (June 7 - June 18)'''
 
       -  
 
       -  
  '''Next two weeks (June 7 - June 18)'''
+
    '''Next two weeks (June 21 - July 2)'''
 
       -  
 
       -  
  
Line 161: Line 164:
 
'''Bhawin Dhital'''
 
'''Bhawin Dhital'''
 
    
 
    
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
       - Participated and presented a talk at IPAC'21. Two papers in this conference are presented and �nally accepted for the publication in the near future.
+
       - I was taking USPAS online courses. The first course was "Spin Dynamics" from June 07 - June 19. The course was great. I learned the fundamental concepts on spin dynamics. And I also learned the basic concept of "Zgoubi" software to study the spin dynamics. That was a big class and great course.
      - Dual energy ring lattice design with isochronous arc is completed. Some initial parameters calculations were performed. Damping times, IBS times were calculated. RF parameters are explored and started a particle tracking simulation to understand the stability.
+
     '''Next two weeks (June 21 - July 2)'''
     '''Next two weeks (June 7 - June 18)'''
+
       - I will be taking US Particle Accelerator School (USPAS). There are two courses, Spin Dynamics (June 06 - June 18) and Machine Learning and Optimization (June 21 - July 02). I will be busy with this \Machine Learning and Optimization" course. I will not be able to work with my dual energy storage
       - II will be taking courses at US Particle Accelerator School (USPAS). There are two courses, Spin Dynamics (June 06 - June 18) and Machine Learning and Optimization (June 21 - July 02). I will be busy with these courses. I will not be able to work with my dual energy storage ring within this time period.
+
ring within this time period.
  
  
Line 174: Line 177:
 
'''Amy Sy'''
 
'''Amy Sy'''
  
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
      - Attending virtual IPAC2021. Following week: catching up on IPAC talks missed during on site work.
 
      - Laser particle counter: On site visit by vendor on 5/26 and 5/27. A 6-channel prototype was delivered instead of the 12-channel prototype expected due to hardware delays. Initial visit to familiarize ourselves with the hardware and GUI for data-taking. The current prototype can only record data from two channels simultaneously, so an obvious action item is to enable simultaneous recording of data from all six available channels.
 
      - Submitted an action item list to the vendor. Vendor will return with prototype detector either 6/3 or the following week.
 
    '''Next two weeks (June 7 - June 18)'''
 
 
       - Evaluating candidates for the open SS1 position as part of the search committee.
 
       - Evaluating candidates for the open SS1 position as part of the search committee.
       - Laser particle counter: vendor visit 6/10-6/11 with prototype detector and new software. New software for simultaneous recording of 6 channels of data was quarantined by anti-virus software - working with the vendor to try to resolve this. Vendor will return 6/14 with new software. Data analysis of 2 channel data collection using the vendor's MATLAB data parser, and also jupyter notebook to more easily handle the datasets. Discussions with the detector group on methods for testing wire and particle passage through the 6 available channels for both vacuum and ambient pressure testing setups.
+
       - Laser particle counter: vendor visit 6/10-6/11 with prototype detector and new software. New software for simultaneous recording of 6 channels of data was quarantined by anti-virus software - this issue was resolved.  
 +
        Vendor returned on 6/14 to participate in simultaneous data collection from all six available channels with wire sweeping events at approximately 1 Hz rep rate. Worked with vendor's MATLAB data parser to extract saved
 +
        data, and generated new MATLAB functions to plot and manipulate data from all available channels. Lowpass filtering filters out the signal from the recorded amplitude data, and only marginally improves the displacement
 +
        signal data. Tried a window technique where the displacement signal is binned, and the average over each bin is subtracted from the displacement signal over that bin - this amplifies the event signals in a way that makes
 +
        them more easily visualized.
 +
    '''Next two weeks (June 21 - July 2)'''
 +
      - Laser particle counter: Continued data analysis of 6-channel data with both 1 Hz and more sporadic wire sweeping events. Vendor will return on July 1 with software updates and for discussion on issues that have arisen during data analysis, e.g. unphysical magnitudes of displacement signal for one channel only, ways to improve the internal algorithm used for calculation of the displacement signal, and others. Will give update on LPC status at biweekly PIT meeting. Discussions with Detector Group on methods for well-defined and well-controlled wire/particle event generation.
 +
      - Looking into PD info (daily meetings, existing summaries) to better understand PD responsibilities for a possible stint as PD.
 +
 
  
  
Line 198: Line 205:
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Yves Roblin'''
 
'''Yves Roblin'''
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
 
       -  
 
       -  
     Next two weeks (June 7 - June 18)
+
     Next two weeks (June 21 - July 2)
 
       -  
 
       -  
  
Line 213: Line 220:
 
'''Randi Gamage'''
 
'''Randi Gamage'''
  
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
 
       -  
 
       -  
     '''Next two weeks (June 7- June 18)'''
+
     '''Next two weeks (June 21 - July 2)'''
 
       -  
 
       -  
  
Line 222: Line 229:
 
'''River Huang'''
 
'''River Huang'''
  
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
      - Attended IPAC 2021 meeting and worked on EIC Beam-Beam project.
 
    '''Next two weeks (June 7 - June 18)'''
 
 
       - Working on EIC Beam-Beam project, especially focusing on the research of the emittance growth in SPS lattice due to the different noises.
 
       - Working on EIC Beam-Beam project, especially focusing on the research of the emittance growth in SPS lattice due to the different noises.
 +
    '''Next two weeks (June 21 - July 2)'''
 +
      - Continue working on EIC Beam-Beam project.
  
  
Line 233: Line 240:
  
  
 +
'''Isurumali Neththikumara'''
  
'''Isurumali Neththikumara'''
+
    '''Previous two weeks (June 7 - June 18)'''
 +
      - Attended the 1st session of USPAS summer 2021
 +
    - Spin Dynamics in Particle Accelerators
 +
    '''Next two weeks (June 21 - July 2)'''
 +
      - Attend the 2nd session of USPAS summer 2021
 +
            - Optimization and Machine Learning for Accelerators
  
    '''Previous two weeks (May 24 - June 4)'''
 
      -
 
    '''Next two weeks (June 7 - June 18)'''
 
      -
 
  
  
Line 290: Line 299:
 
'''He Zhang'''
 
'''He Zhang'''
  
     '''Previous two weeks (May 24 - June 4)'''   
+
     '''Previous two weeks (June 7 - June 18)'''    
      - Attend IPAC’21
 
      - Add to TPSA lib the feature: generate a symplectic map from a given truncated map.
 
      - Parallelize the element-by-element tracking and IBS calculation in JSPEC.
 
      - Update the IBS rate calculation in JSPEC using F. Zimmerman’s model according to their latest paper.
 
    '''Next two weeks (June 7 - June 18)'''  
 
 
       - Write a section for ICFA paper.  
 
       - Write a section for ICFA paper.  
       - Finish writing the tests for the TPSA lib.
+
      - Finished writing the tests for the C++ TPSA C++ lib.
       - Writing FMM paper.  
+
    '''Next two weeks (June 21 - July 2)'''
 +
       - Finish writing the tests for the TPSA Python lib.
 +
       - Writing a paper on the TPSA lib for JOSS.
 +
      - Organize data for FMM paper.  
 
   
 
   
  
Line 311: Line 318:
 
'''Kevin Jordan'''
 
'''Kevin Jordan'''
  
   '''Previous two weeks (May 24 - June 4)'''
+
   '''Previous two weeks (June 7 - June 18)'''
       - Working on organizing talks for IBIC conference
+
       -  
          - Updated Faraday Cup website
+
    '''Next two weeks (June 21 - July 2)'''
          - Prepared the worksheet & packages for SPC members of the three Faraday Cup award candidates
+
       -  
      - Continued working on the Magnetron controls interface & cooling water connections
 
      - Worked with Joe & I&C to get new SLMs connected and tested
 
      - Started preparing my invited talk for Aries workshop on Materials and Engineering Technologies for Particle Accelerator Beam Diagnostic Instruments
 
      - Helped Carlos on GTS gun HV troubles
 
      - Began “homework” for upcoming Canadian Light Source MAC meeting
 
  '''Next two weeks (June 7- June 18)'''
 
       - Helping Carlos & source group to get the GTS operational
 
      - Attend Aries workshop & present talk on boron based materials for accelerator diagnostics
 
      - Hopefully begin Magnetron commissioning
 
      - Attend Canadian Light Source MAC Meeting (June 28 & 29)
 
  
  
Line 331: Line 328:
 
'''Joe Gubeli'''
 
'''Joe Gubeli'''
  
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
 
       - '''Isotopes –'''
 
       - '''Isotopes –'''
 
       - '''ARDDOT - '''  
 
       - '''ARDDOT - '''  
     '''Next two weeks (June 7 - June 18)'''
+
     '''Next two weeks (June 21 - July 2)'''
 
       - '''Isotopes –'''  
 
       - '''Isotopes –'''  
 
       - '''ARDDOT –'''
 
       - '''ARDDOT –'''
Line 342: Line 339:
 
'''Michael Tiefenback'''
 
'''Michael Tiefenback'''
  
     '''Previous two weeks (May 24 - June 4)'''
+
     '''Previous two weeks (June 7 - June 18)'''
 
       -  
 
       -  
     '''Next two weeks (June 7 - June 18)'''
+
     '''Next two weeks (June 21 - July 2)'''
 
       -  
 
       -  
  

Revision as of 10:24, 6 July 2021

June 24, 2021 Report - June 7 - July 2 Director - Todd Satogata

Todd Satogata

  Previous two weeks (June 7 - June 18) 
     - EIC Meetings (management, RF, crab, cryo, cooling, impedance, OPC, team, R&D)
     - EIC Meetings (second IR), FCC-ee diagnostics (Jun 16), review report writing
     - EIC Review of FPC dry run Jun 9, resource planning (Vasiliy/Fanglei)
     - MGMT Meetings (Leadership/Dept Heads, CASA coffee, personnel)
     - ADMIN APS DPB Education/Outreach/Diversity committee (Jun 18)
     - ADMIN PSsQCD EIC 2nd IR OC meetings
     - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD, PAC49 TAC Jun 7)
     - SICK Dr appt (oral surgery) AM Jun 17
     - HOLIDAY May 31
  Next two weeks (June 21 - July 2) 
     - EIC Meetings (management, RF, crab, cryo, cooling, impedance, OPC, team, R&D)
     - EIC Meetings (second IR), resource planning (critical hires), Nb purchase guidance
     - EIC PC review triage (Jun 23), scope/cost changes retreat (Jun 25)
     - EIC TCCB review meeting (Jun 25)
     - MGMT Meetings (Leadership/Dept Heads, CASA coffee, personnel)
     - ADMIN JSA poster competition, user group meeting
     - ADMIN PSsQCD EIC 2nd IR OC meetings
     - ADMIN AI Lunch on collider data analysis (Jun 30)
     - OPS Meetings (08:00 daily, BTeam)
     - SICK Dr appt (physical) AM Jun 28




Alex Bogacz

  Previous two weeks (June 7 - June 18) 
     - One-on-one with Rishi
     - ERL Roadmap Panel - writeup on the LHeC ERL
     - PRAB paper review
     - Letter of recommendation for Ben Hounsell 
     - Serving as a conveners for Muon Collider Roadmap Panel
  Next two weeks (June 21 - July 2)
     - Attending Source Group mtg. on positron production channels
     - Mentoring Rishi 
     - Coordinating/writing a PRAB paper on ‘Beam Dynamics Driven PERLE Design’
     - Update on FFA@CEBAF at CBETA monthly mtg.
     - DIS’21 proceedings  - composing paper on PERLE 




Ryan Bodenstein

  Previous two weeks (June 7 - June 18) 
     - Operations meetings
     - B-Team meetings
     - Radworker I training test (passed)
     - Radworker I training practical (passed)
     - MAC training for MCC/CEBAF (for channel access)
     - Summer Student guidance
     - FFA@CEBAF collab work
     - LDRD questions and updates
  Next two weeks (June 21 - July 2)
     - Operations meetings
     - B-Team meetings
     - MAC training for MCC/CEBAF (complete)
     - Summer Student guidance
     - FFA@CEBAF collab work
     - Positron/FFA liaison work initial meeting
     - Tunnel Cleanup 
     - PERLE collaboration meeting





Rui Li

  Previous two weeks (June 7 - June 18)
     - Vacation 6/7-11
     - Attending CeC monthly review meeting 
     - Attending EIC impedance/instability meeting
     - Proceed with the tune scan for my study of the interplay between coherent beam-beam and coupled-bunch instability 
  Next two weeks (June 21 - July 2) 
     - Vacation 6/24-25
     - Attending EIC impedance/instability meeting
     - Attending EIC weekly meeting at JLAB
     - Reading references on coherent beam-beam instability (CBB) and its instability threshold in tune space
     - Think about ways to improve the code for eliminating tune dependence of growth rate caused by the modeling algorithm




Edy Nissen

   Previous two weeks (June 7 - June 18)
     - Attended beam-beam task force meetings
     - Worked on proceedings papers for IPAC
     - Worked on updating DODGE paper
     - Half day off on June 17
   Next two weeks (June 21 - July 2)
     - Attending beam-beam task force meetings
     - Work on DODGE paper
     - Judge for JLUO student poster contest






Chris Tennant

   Previous two weeks (June 7 - June 18)
     - 
   Next two weeks (June 21 - July 2)
     - 






Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (June 7 - June 18)
     - 
   Next two weeks (June 21 - July 2)
     - 



Max Bruker

  Previous two weeks (May 24 - June 4)
     - 
  Next two weeks (June 7 - June 18)
     - 




Bhawin Dhital

   Previous two weeks (June 7 - June 18)
     - I was taking USPAS online courses. The first course was "Spin Dynamics" from June 07 - June 19. The course was great. I learned the fundamental concepts on spin dynamics. And I also learned the basic concept of "Zgoubi" software to study the spin dynamics. That was a big class and great course.  
   Next two weeks (June 21 - July 2)
     - I will be taking US Particle Accelerator School (USPAS). There are two courses, Spin Dynamics (June 06 - June 18) and Machine Learning and Optimization (June 21 - July 02). I will be busy with this \Machine Learning and Optimization" course. I will not be able to work with my dual energy storage

ring within this time period.




Amy Sy

   Previous two weeks (June 7 - June 18)
     - Evaluating candidates for the open SS1 position as part of the search committee.
     - Laser particle counter: vendor visit 6/10-6/11 with prototype detector and new software. New software for simultaneous recording of 6 channels of data was quarantined by anti-virus software - this issue was resolved. 
       Vendor returned on 6/14 to participate in simultaneous data collection from all six available channels with wire sweeping events at approximately 1 Hz rep rate. Worked with vendor's MATLAB data parser to extract saved 
       data, and generated new MATLAB functions to plot and manipulate data from all available channels. Lowpass filtering filters out the signal from the recorded amplitude data, and only marginally improves the displacement 
       signal data. Tried a window technique where the displacement signal is binned, and the average over each bin is subtracted from the displacement signal over that bin - this amplifies the event signals in a way that makes 
       them more easily visualized. 
   Next two weeks (June 21 - July 2)
     - Laser particle counter: Continued data analysis of 6-channel data with both 1 Hz and more sporadic wire sweeping events. Vendor will return on July 1 with software updates and for discussion on issues that have arisen during data analysis, e.g. unphysical magnitudes of displacement signal for one channel only, ways to improve the internal algorithm used for calculation of the displacement signal, and others. Will give update on LPC status at biweekly PIT meeting. Discussions with Detector Group on methods for well-defined and well-controlled wire/particle event generation.
     - Looking into PD info (daily meetings, existing summaries) to better understand PD responsibilities for a possible stint as PD.










Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (June 7 - June 18)
     - 
   Next two weeks (June 21 - July 2)
     - 






Randi Gamage

   Previous two weeks (June 7 - June 18)
     - 
   Next two weeks (June 21 - July 2)
     - 


River Huang

   Previous two weeks (June 7 - June 18)
     - Working on EIC Beam-Beam project, especially focusing on the research of the emittance growth in SPS lattice due to the different noises.
   Next two weeks (June 21 - July 2)
     - Continue working on EIC Beam-Beam project.




Isurumali Neththikumara

   Previous two weeks (June 7 - June 18)
     - Attended the 1st session of USPAS summer 2021

- Spin Dynamics in Particle Accelerators

   Next two weeks (June 21 - July 2)
     - Attend the 2nd session of USPAS summer 2021
            - Optimization and Machine Learning for Accelerators






Dennis Turner

   Previous two weeks (May 24 - June 4)
     - CED Import
          - Continued tweaking and bugfixing elegant2ced, including exploring ways to speed it up.
          - Modified elegant2ced to work with svn baseline decks, since they handle the linacs differently from ced2elegant
          - Started on code to audit for consistency and correct optics
     - AIPINJ
          - Corrected floor coordinates for PREINJ deck to match up with svn baseline
          - Scheduled to perform emittance measurments vs wien configurations, but IHA0I02 broke
     - Ops Procedure Review
          - Sent Brian write up on how to validate match with harp measurement
          - Worked on Aperure Scan procedure
          - Provided input for the Pathlength Correction procedure and spreader matching section of ORFP
     - 'HLA
          - ced2elegant bugfixes and tweaks. Removed "fix" for negative length drifts
     - Attended AI Lunch Series, Accelerator Seminars
     - Attended 0800, AIPINJ toolbox, AIPINJ beam drivers, AI FOA, BTeam, PPB meetings
   Next two weeks (June 7 - June 18)
     - CED Import
         - Continued ironing out elegant2ced
         - Explored accounting for Hall A and C elevation change in CED
     - AIPINJ
          - Worked with Alicia to finalize injector solenoid conversions (B to I to KS and back)
          - Verified changes to the Injector Quick Reference, PREINJ deck, and CED all agree
          - Met with Joe Grames and Reza to discuss MDR coil fixture rotation test plan
          - Worked with Mamun to take solenoid scan data with IYG0I02. Prepared scripts to analyze the data once the pixel to mm 
            calibration is complete.
     - HLA
          - Modified cs2sdds and eDT to account for new solenoid unit conversions.
          - Verified qsUtility works with the new conversions 
     - Attended AI Lunch Series, Accelerator Seminars
     - Attended 0800, AIPINJ toolbox, AIPINJ beam drivers, AI FOA, BTeam, PPB meetings



He Zhang

   Previous two weeks (June 7 - June 18)     
     - Write a section for ICFA paper. 
     - Finished writing the tests for the C++ TPSA C++ lib. 
   Next two weeks (June 21 - July 2) 
     - Finish writing the tests for the TPSA Python lib.
     - Writing a paper on the TPSA lib for JOSS. 
     - Organize data for FMM paper. 





Diagnostic Development - Kevin Jordan

Kevin Jordan

  Previous two weeks (June 7 - June 18)
     - 
   Next two weeks (June 21 - July 2)
     - 



Joe Gubeli

   Previous two weeks (June 7 - June 18)
     - Isotopes –
     - ARDDOT -  
   Next two weeks (June 21 - July 2)
     - Isotopes – 
     - ARDDOT –


Michael Tiefenback

   Previous two weeks (June 7 - June 18)
     - 
   Next two weeks (June 21 - July 2)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (June 7 - June 18)
     - Researched Steady State Micro-Bunching (SSMB) option for SRFEL
     - Worked out transfer of funds for harmonic buncher completion
     - Reviewed several papers for IPAC
     - Reviewed FEL mirror information with Export Control lawyers
     - Negotiated with Leigh on LDRD proposal travel plans.
   Next two weeks (June 21 - July 2)
     - Track down mirror vendor information for lawyers
     - Rewrite and submit the LOSP for User Lab 4
     - Continue developing longitudinal model for CeC ERL on LiTrack
     - Get CRADA with HZDR set up
     - Explore Super-radiant undulator operation





Andrew Hutton

   Previous two weeks (June 7 - June 18) 
     - Isotopes: we will start preparing our closeout report, and decide whether it is worth our time to prepare a response to the FOA if we don’t have the support of the lab.               
     - ERL Panel: this activity will continue unabated as we start working towards the Roadmap itself and interacting with the various European scientific committees.      
     - ERL sub-panel: we held our kick-off meeting on June 9 with all the members present.  We agreed on the path forward and our first “interview” with Vladimir Litvinenko and Thomas Roser will be around June 16.  In the meantime, I am collecting questions from the sub-Panel members to be transmitted to the authors.  The sup-Panel members are: Chris Adolphsen (SLAC, Reinhard Brinkmann (DESY), Oliver Brüning (CERN), Andrew Hutton (Jefferson Lab) - Chairman’ Sergei Nagaitsev (Fermilab), Max Klein (Liverpool), Peter Williams (STFC), Akira Yamamoto (KEK), Kaoru Yokoya (KEK), and Frank Zimmermann (CERN). We held a second meeting to hear a presentation by Thomas Roser and Vladimir Litvinenko of CERC, initiating an ebullition of emails and comments.  

Loida should have made some progress on her project, she is already collecting up information she will need as input.

     - ALCC:attended a meeting June 10 and presented the ERL sub-Panel.  The group is excited by the possibilities and scared of the Telnov proposal derailing the ILC.  Lots of discussion!
     - AccApp'21: I got active, drafted the letter explaining the mixed in person/remote conditions and invited four speakers.  Two accepted, one declined (I need a replacement) and one I haven’t heard back from.              
   Next two weeks (June 7 - June 18)  
     - Isotopes: I have been told not to submit a proposal that involves irradiations at LERF until he talks with the DOE.  At this time, I am working with my UVA collaborators to craft a proposal where they buy copper 67 and carry out all of the radiochemistry.  I still need to close out the current grant, after which, I do not see how I can l can keep our team together, which will make  it difficult for Jefferson Lab to get back into isotopes.  Sad! 
     - On the other hand, Loida is doing really well with her program to search for new radioisotope production pathways. She has submitted an Abstract to AccApp’2021 and I have contacted the Program Chair regarding student funding for her to attend in person.     
     - ERL Panel:  The ERL Panel is getting more active again; I will be presenting the present status to the Particle Physics community on July 9 (haven’t received the info yet).  
     - I have a PERLE Collaboration Board meeting on Friday, June 25.  We are informed that the CNRS have signed the ICRADA and sent it via DHL to Jefferson Lab, but we haven’t seen it yet.  All the other collaborators have signed the Collaboration Agreement except for BINP.  Emails to the BINP representative went unanswered, so I contacted the BINP Lab Director and he immediately agreed to sign it and appointed a new representative.  Our participation will be more difficult with the departure of Frank Marhauser.  
     - Next week, I hope to have the last meeting on the CERC and prepare my ERL talk - when I know the audience!