Difference between revisions of "2021-9-16-LeadershipReports"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | September 16, 2021 Report - Aug 30 - Sept 24''' | + | '''September 16, 2021 Report - Aug 30 - Sept 24''' |
'''Director - Todd Satogata''' <br> | '''Director - Todd Satogata''' <br> | ||
Line 61: | Line 61: | ||
'''Ryan Bodenstein''' | '''Ryan Bodenstein''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- Operations meetings | - Operations meetings | ||
- B-Team meetings | - B-Team meetings | ||
Line 67: | Line 67: | ||
- Positron/FFA liaison work | - Positron/FFA liaison work | ||
- PhD Student guidance | - PhD Student guidance | ||
− | - | + | - Playing around with Zgoubi to see if it’s the right tool for FFA work |
− | + | - Diversity meetings | |
− | - Diversity | + | '''Next two weeks (Sept 13 - Sept 24)''' |
− | '''Next two weeks ( | ||
- Operations meetings | - Operations meetings | ||
- B-Team meetings | - B-Team meetings | ||
Line 76: | Line 75: | ||
- Positron/FFA liaison work | - Positron/FFA liaison work | ||
- PhD Student guidance | - PhD Student guidance | ||
− | - | + | - UITF Operations Training |
- Diversity meetings | - Diversity meetings | ||
Line 90: | Line 89: | ||
'''Rui Li''' | '''Rui Li''' | ||
− | |||
'''Previous two weeks (Aug 30 - Sept 10)''' | '''Previous two weeks (Aug 30 - Sept 10)''' | ||
- CBB and TCBI | - CBB and TCBI | ||
Line 96: | Line 94: | ||
- Collective effect problems from EDM | - Collective effect problems from EDM | ||
- Spend some time to further understand the questions raised to me by Riad about the CSR and by Slava about the negative mass instability in their EDM ring design | - Spend some time to further understand the questions raised to me by Riad about the CSR and by Slava about the negative mass instability in their EDM ring design | ||
+ | - Computer Learning | ||
+ | - Taking online webinar from mathtype about advanced programming using matlab | ||
+ | '''Next two weeks (Sept 13 - Sept 24)''' | ||
- Start writing paper on CBB and TCBI | - Start writing paper on CBB and TCBI | ||
- Communicate with Themis Mastoridis of California Polytech State Univ. about his work on the emittance growth due to noise from crab cavities in EIC, got his slides for helping the work by River Huang et al in CASA | - Communicate with Themis Mastoridis of California Polytech State Univ. about his work on the emittance growth due to noise from crab cavities in EIC, got his slides for helping the work by River Huang et al in CASA | ||
- Attend and listen to the machine advisory committee sessions for EIC | - Attend and listen to the machine advisory committee sessions for EIC | ||
+ | - Vacation 9/23-24 | ||
Line 129: | Line 131: | ||
'''Chris Tennant''' | '''Chris Tennant''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
− | - | + | - |
− | + | '''Next two weeks (Sept 13 - Sept 24)''' | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | '''Next two weeks ( | ||
- RADSMA: discussions with industry partner for year 2 plans | - RADSMA: discussions with industry partner for year 2 plans | ||
- ARDFML: coordinate deployment of model for fault classification | - ARDFML: coordinate deployment of model for fault classification | ||
Line 158: | Line 152: | ||
'''Yuhong Zhang''' | '''Yuhong Zhang''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 13 - Sept 24)''' |
- | - | ||
Line 168: | Line 162: | ||
'''Bhawin Dhital''' | '''Bhawin Dhital''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
− | + | - Continued with lattice optimization. Dr Fanglei Lin is making a lot of e�ort to optimize the lattice that will work best for electron cooling. | |
− | - Continued with lattice optimization | + | - Particle tracking simulations with new optimized lattice. Dynamic Aperture (DA), Frequency Map Analysis (FMA) studies were carried out in the new lattice. |
− | - Particle tracking simulations with new optimized lattice | + | '''Next two weeks (Sept 13 - Sept 24)''' |
− | '''Next two weeks ( | + | - Will continue the lattice optimization |
− | - | + | - Will continue - Tracking simulations, Dynamic Aperture calculation, tune shifts calculations etc. |
− | - Tracking simulations, Dynamic Aperture | ||
Line 206: | Line 199: | ||
'''Computational Physics - Yves Roblin'''<br> | '''Computational Physics - Yves Roblin'''<br> | ||
'''Yves Roblin''' | '''Yves Roblin''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 13 - Sept 24)''' |
- | - | ||
Line 222: | Line 215: | ||
'''Randi Gamage''' | '''Randi Gamage''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 13 - Sept 24)''' |
- | - | ||
Line 265: | Line 258: | ||
'''Dennis Turner''' | '''Dennis Turner''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- HLA | - HLA | ||
− | - Modified ArcSteer to load machine settings. | + | - Modified ArcSteer to load machine settings. Had to roll back due to weirdness. Need to investigate. |
- Wrote documentation for rayTrace_dataCollector and released to production | - Wrote documentation for rayTrace_dataCollector and released to production | ||
- Helped troubleshoot rfCavHistory | - Helped troubleshoot rfCavHistory | ||
Line 319: | Line 312: | ||
'''Kevin Jordan''' | '''Kevin Jordan''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 13 - Sept 24)''' |
- | - | ||
Line 329: | Line 322: | ||
'''Joe Gubeli''' | '''Joe Gubeli''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- '''Isotopes –''' | - '''Isotopes –''' | ||
- '''ARDDOT - ''' | - '''ARDDOT - ''' | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 13 - Sept 24)''' |
- '''Isotopes –''' | - '''Isotopes –''' | ||
- '''ARDDOT –''' | - '''ARDDOT –''' | ||
Line 340: | Line 333: | ||
'''Michael Tiefenback''' | '''Michael Tiefenback''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 30 - Sept 10)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 13 - Sept 24)''' |
- | - | ||
Latest revision as of 08:52, 27 September 2021
September 16, 2021 Report - Aug 30 - Sept 24
Director - Todd Satogata
Todd Satogata
Previous two weeks (Aug 30 - Sept 10) - EIC Meetings (management, RF, crab, cooling, impedance, team, R&D, beam-beam) - EIC Meetings (second IR), resource planning (critical hires) - EIC AI@EIC talk planning, workshop (Sep 7-9), EICPP planning - EIC MAC talk prep, dry run (Sep 2) - MGMT Meetings (Leadership/Dept Heads, CASA coffee), travel planning - MGMT Andrei triweekly (Sep 9) - OPS Meetings (08:00 daily, BTeam; optics on call) - ADMIN PSsQCD@EIC organizing committee meetings - ADMIN Training updates - ODU Undergrad/grad funding meeting (Sep 3) - HOLIDAY (Sep 6) - SICK time (Sep 7 PM dental appointment) Next two weeks (Sept 13 - Sept 24) - EIC Meetings (management, RF, crab, cooling, impedance, team, R&D, beam-beam) - EIC Meetings (critical hires, C3 for linac, cost/schedule, risk assessments) - EIC Machine Advisory Committee (Sep 21-24), dry runs (Sep 13-14) - MGMT Meetings (Leadership/Dept Heads, CASA coffee) - MGMT Accelerator/Data Science brainstorming (Sep 20) - OPS Meetings (08:00 daily, BTeam) - ADMIN PSsQCD@EIC organizing committee meetings - ADMIN Virtual Field Trip dry run (Sep 15) - SICK time (Sep 22 AM doctor appointment)
Alex Bogacz
Previous two weeks (Aug 30 - Sept 10) - Mentoring Isurumali - Writing a PRAB paper on PERLE - Coordinating FFA@CEBAF - More letters of recommendation - Time accounting training - Submitting nomination package for Mark Stefani Next two weeks (Sept 13 - Sept 24) - Vacation - Writing a paper on PERLE - MED day - PRAB paper review - FFA@CEBAF design work - Convener - Muon Collider Community mtg.
Ryan Bodenstein
Previous two weeks (Aug 30 - Sept 10) - Operations meetings - B-Team meetings - FFA@CEBAF collab work - Positron/FFA liaison work - PhD Student guidance - Playing around with Zgoubi to see if it’s the right tool for FFA work - Diversity meetings Next two weeks (Sept 13 - Sept 24) - Operations meetings - B-Team meetings - FFA@CEBAF collab work - Positron/FFA liaison work - PhD Student guidance - UITF Operations Training - Diversity meetings
Rui Li
Previous two weeks (Aug 30 - Sept 10) - CBB and TCBI - Prepare and present my presentation at the EIC Accelerator Design meeting - Collective effect problems from EDM - Spend some time to further understand the questions raised to me by Riad about the CSR and by Slava about the negative mass instability in their EDM ring design - Computer Learning - Taking online webinar from mathtype about advanced programming using matlab Next two weeks (Sept 13 - Sept 24) - Start writing paper on CBB and TCBI - Communicate with Themis Mastoridis of California Polytech State Univ. about his work on the emittance growth due to noise from crab cavities in EIC, got his slides for helping the work by River Huang et al in CASA - Attend and listen to the machine advisory committee sessions for EIC - Vacation 9/23-24
Edy Nissen
Previous two weeks (Aug 30 - Sept 10) - Attended RCS meeting - Submitted DODGE paper to NIM, formatting needed fixing, currently stuck going through this with tech support. - Prepared for and began PD Shift on the 8th Next two weeks (Sept 13 - Sept 24) - Program Deputy from 8th to 22nd - Will probably take some time off afterwards.
Chris Tennant
Previous two weeks (Aug 30 - Sept 10) - Next two weeks (Sept 13 - Sept 24) - RADSMA: discussions with industry partner for year 2 plans - ARDFML: coordinate deployment of model for fault classification - AIFOA1: lead weekly meetings, understand project bottlenecks - Holiday + vacation
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (Aug 30 - Sept 10) - Next two weeks (Sept 13 - Sept 24) -
Bhawin Dhital
Previous two weeks (Aug 30 - Sept 10) - Continued with lattice optimization. Dr Fanglei Lin is making a lot of e�ort to optimize the lattice that will work best for electron cooling. - Particle tracking simulations with new optimized lattice. Dynamic Aperture (DA), Frequency Map Analysis (FMA) studies were carried out in the new lattice. Next two weeks (Sept 13 - Sept 24) - Will continue the lattice optimization - Will continue - Tracking simulations, Dynamic Aperture calculation, tune shifts calculations etc.
Amy Sy
Previous two weeks (Aug 30 - Sept 10) - Laser particle counter: Data analysis of pass/fail testing data taken during last vendor visit. Implementing new algorithm at vendor suggestion that calculates local peak to peak amplitudes in both the amplitude and phase data, and sums the two signals together for improved event detection. Continued algorithm optimization by varying moving window size in the peak to peak calculations, as well as low and high pass filtering effects. Studies of dynamic window and dynamic averaging implementation in data processing applications. The newer 18 sensors have met pass/fail specifications, but the full 24 channel system is incomplete until the initial 6 sensors can be replaced with upgraded versions. The vendor has committed to supplying these upgraded sensors as replacements for the initial 6, and have been authorized to begin work on 24 additional sensors for a full 48 channel system. Delivery of the remaining 6 upgraded sensors for further testing is anticipated in the late September to mid October time frame. Next two weeks (Sept 13 - Sept 24) - Laser particle counter: Found a bug in the data-taking software that erroneously saves one extra bit to random data arrays - vendor has confirmed that this is a software issue and is working to understand why it occurred and how to prevent this in the next version of the GUI. Summarizing current progress in advance of taking extended leave. Preparing content for update on laser particulate counter status at JLAAC in November/December time frame. Vendor anticipates returning with full 24 channel system the week of September 20-24 for continued testing.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (Aug 30 - Sept 10) - Next two weeks (Sept 13 - Sept 24) -
Randi Gamage
Previous two weeks (Aug 30 - Sept 10) - Next two weeks (Sept 13 - Sept 24) -
River Huang
Previous two weeks (Aug 30 - Sept 10) - EIC Beam-Beam project: Collaborating with colleagues in JLAb, Oak Ridge Lab and BNL, working on evaluating emittance growth rate due to rf noise. Next two weeks (Sept 13 - Sept 24) - EIC Beam-Beam project: Collaborating with colleagues, working on evaluating emittance growth rate due to rf noise and testing different cases by using CASA BeamBeam for SPS and JLEIC lattice.
Isurumali Neththikumara
Previous two weeks (Aug 30 - Sept 10) - Did my annual review which is a requirement in ODU graduate program. - Obtained better optics with new objectives for the 14-variable search. - Continue the search process with 16 variable. Next two weeks (Sept 13 - Sept 24) - Obtained solutions for 10-pass north linac lattice with nice optics for the 16-variable search. - Completed 2 searches for 18-variables, but optics of the obtained solutions show over focused behavior, therefore need to make some modifications to the search by adding constraints. - Read on parallelization of a code and python ‘multiprocessing’ library.
Dennis Turner
Previous two weeks (Aug 30 - Sept 10) - HLA - Modified ArcSteer to load machine settings. Had to roll back due to weirdness. Need to investigate. - Wrote documentation for rayTrace_dataCollector and released to production - Helped troubleshoot rfCavHistory - rayTrace tweaks - Explored doing multiple spreader matches and choosing the best four quads - Optics On-Call - UITF - Provided snapfile scaled for 180kV gun - Updated deck and UED for 180kV gun and wastewater experiment - Stood operator training shifts - Completed web-based trainings for UITF operator qualification - rayTrace - Performed rayTrace from Injector to 1R. - Found shortcomings in the rayTrace analyzer to be fixed. - Attended 0745, 0800, BTeam, AI FOA, UITF meetings Next two weeks (Sept 13 - Sept 24) - UITF - Operator shifts for Wastewater experiment (most of my time was spent here) - Start work on a download tool like eDT - HLA - rayTrace analyzer bugfixes and enhancements - qsUtility tweaks for UITF - AIPINJ - Create decks for spectrometer lines and import to CED - Attended 0800, BTeam, AI FOA, UITF meetings
He Zhang
Previous two weeks (Aug 30 - Sept 10) - On sick leave and vacation most of the time. - Revisited the JSPEC2-python code and doing testing. Next two weeks (Sept 13 Sept 24) - Finish and submit the FMM paper. - Revisit and finish the non-Gaussian IBS model in JSPEC.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (Aug 30 - Sept 10) - Next two weeks (Sept 13 - Sept 24) -
Joe Gubeli
Previous two weeks (Aug 30 - Sept 10) - Isotopes – - ARDDOT - Next two weeks (Sept 13 - Sept 24) - Isotopes – - ARDDOT –
Michael Tiefenback
Previous two weeks (Aug 30 - Sept 10) - Next two weeks (Sept 13 - Sept 24) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (Aug 30 - Sept 10) - Submitted new LOSP for alignment in the LERF vault - Worked with BNL to determine cooler match for the MAC. - Prepared MAC presentation - Met with BNL team to review JLab responsibilities for the EIC cooling ERL. - Developed WBS dictionary for level 4 ERL WBS elements. - Reviewed Kastner report for BESAC competitiveness and went over proposed XFELO at JLab. Next two weeks (Sept 13 - Sept 24) - Assist in final MAC presentation review - Close out CATs item about laser alignment in the LERF vault LOSP. - Go over possible applications in the LERF with Drew Weisenberger for the Strategic Partnerships, Tech transfer S&T Agenda. - Submit revised FAST magnetized beam paper for review. - Submit No-Cost Extension request for FOA electron cooling project to Manouchehr Farkhondeh. - Start to review ERL requirements documents - Attend Cost and Schedule planning meeting. - Complete "Building a Respectful Workplace in a Technical Environment" training
Andrew Hutton
Previous two weeks (Aug 30 - Sept 10) - Isotopes: Loida has completed a run with 20 MeV protons - the typical energy of a hospital cyclotron. She has identified two known production pathways for 18Fluorine and 119Antimony. This confirms that the program is performing correctly. More interestingly, she identify three other possibilities: 55Cobalt, 76Bromine and another pathway to 119Antimony. I am working on looking at the other radioisotopes that are co-produced and which could be dangerous. The 56Fe (p,2n) 55Co reaction seems clean with a small production of two Manganese isotopes that should be easily separable chemically. The 76Bromine is more complicated as there are many byproducts and this pathway may not be viable unless the target 76Selenium is isotopically purified before irradiation. There are similar problems with the alternative pathway for 119Antimony, which may or may not make it unacceptable. Loida is now working on getting the neutron production working. The goal is still to identify pathways for all the medically interesting isotopes called out by the DOE Isotope program. - ERL: The sub-Panel has has another meeting and has now moved back to weekly meetings for the next month to finish. We already have ~20 pages written and will probably expand to ~30 pages before we are finished. The short answer is that neither is in a state that it could replace the ILC or the FCC-ee. We will come up with a list of R&D items that should be pursued to make these ideas achievable. For me, the most important is operation of the cryomodules at 4.5K to reduce the cryogenic plant construction cost as well as the power requirement. This should be an area where Jefferson Lab invests heavily - the pay-back would be enormous as it would also enable every university to envisage having a small superconducting accelerator for Compton back scatter, etc. - SuperKEKB: I am advising both of them for their graduate studies. Lila wishes to pursue medical physics and I put her in contact with Thia Keppel and Ethan Balkin (who was a medical physicist at the University of Washington before moving to the DOE-ONP Isotope program). Loida wishes to pursue accelerator physics, and I am helping her choose a University. Coming from Puerto Rico, she hates the cold, which does limit her options! Next two weeks (Sept 13 - Sept 24) - Isotopes: I went over Loida’s 20 MeV output data and identified another medically interesting isotope Bromine77, which is not on the DOE list but has been used in the past. Both Bromine76 and Bromine77 would be produced from isotopically purified Selenium, which has one problem. The melting point of Selenium is 221°C, which means that it cannot be in the form of a stand-alone foil. I envisage encapsulating it in Titanium(?) like ANL does with their zinc targets used to produce Copper67. The range of 20 MeV protons is ~1mm in Selenium, so it would be a thin disc, the size of a US quarter. Our UVA collaborators tell us that separation should be easy as bromine is volatile. - ERL: I wrote a draft of the conclusions of the ERL sub-Panel, which initiated an email storm. Eventually, all the members with one exception agreed on a more nuanced version that I will produce in the next few days. Getting a unanimous conclusion will take some effort! The hang-up is whether operation at 4.5K with high Q0 would bring the cryogenic load for the ERLC version of the ILC sufficiently low to be competitive as a future upgrade. We will need some careful wording to be able to come up with a report that everyone accepts. The ERL Panel has now two weeks to complete the first draft of the actual roadmap, complete with cost and schedule estimates. The upcoming few weeks are going to be extremely busy. - I attended a meeting of the ALCC, where the latest news from Japan is not good. MEXT has decided that it cannot approve the ILC Pre-Lab until other countries have signed on. However, the other countries are waiting for a clear indication of intent from Japan. The Japanese solution - create another review panel! The ALCC is normally very positive about the chances for the realization of the ILC, but were distinctly disturbed by the news, which was presented by Hitoshi Murayama, a very credible source. - PERLE: I have been in contact with Wim Leemans at DESY ( a long-time friend) about DESY joining PERLE. We will have a high-level meeting between the PERLE inner circle (Walid Kaabi, Max Klein, Hans Weise, and perhaps Achille Stocchi) this week to discuss the opportunities. This is also intended to try and bring DESY into the ERL Roadmap, which would strengthen it considerably. The ICRADA is slowly going the rounds - I don’t know where it is stuck it this moment, but resolution should be near. I also got in the middle of unblocking the collaboration with BINP as the Director used to be my student. I continue to have concerns about the role that Jefferson Lab is willing to play in PERLE, but until the ICRADA is signed, I don’t think it is worth bringing the matter up to Stuart.