Difference between revisions of "2017-07-07"
Jump to navigation
Jump to search
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | '''Accel. Physics | + | '''Accel. Physics (T. Satogata)''' |
Todd Satogata | Todd Satogata | ||
Line 92: | Line 92: | ||
---- | ---- | ||
− | Computational Physics | + | |
+ | '''Accelerator R and D (Y. Zhang)'''<br> | ||
+ | No report. | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Computational Physics (Y. Roblin)'''<br> | ||
+ | |||
Yves Roblin: | Yves Roblin: | ||
− | + | *Last week vacation | |
− | + | *Before this: | |
− | working on PRL referee report (submitted today) | + | #working on PRL referee report (submitted today) |
− | reread articles on gear changing, trying to reproduce Hao Paper with BB3D | + | #reread articles on gear changing, trying to reproduce Hao Paper with BB3D |
− | modifying BB3D to do gear changing | + | #modifying BB3D to do gear changing |
− | Interviewed candidates for #11807. | + | #Interviewed candidates for #11807. |
− | + | <Br> | |
He Zhang: | He Zhang: | ||
− | + | *Worked on cooling simulations for DC cooling scenarios where one reuses the b. beam cooler. | |
− | + | *Conclusion is that one can cool after filling the booster at 8GeV. 30 meters of solenoid, 3A of e- current and about 10 minutes of cooling time. | |
− | interview panel for #11807 | + | #interview panel for #11807 |
− | working on user interface for JSPEC | + | #working on user interface for JSPEC |
− | working with summer student. | + | #working with summer student. |
+ | <br> | ||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Diagnostic Development (K. Jordan)'''<br> | ||
+ | No report. | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | '''LERF (S. Benson)'''<br> | ||
+ | No report. |
Latest revision as of 14:17, 30 August 2017
Accel. Physics (T. Satogata)
Todd Satogata
Previous two weeks (Jun 26-Jul 7) - ADMIN: S&T Dry Runs (Jun 26, Jul 6), slide updates - ADMIN: Finish JINST, PRAB paper reviews - OPS: Review ORFP, troubleshooting guide notes - JLEIC: Add space charge, other calcs to RampCalculator - USPAS: Search committee meeting (Jun 27), prep - JACoW: Board of Directors telecon (Jun 29) - IPAC18: Start sending out invited oral invitations - ADMIN: Summer student advising, lunch talk on cooling (Jun 29) - VACATION: July 3 Next two weeks (July 10-21) - IPAC18: Finish sending out invited oral invitations - JLEIC: RampCalculator to svn, ANL visit (Jul 11) - JLEIC: Booster ramp modeling, parameter documentation - USPAS: Search committee travel (Jul 12-13) - OPS: Restart BTeam, start prep for StayTreat talk - ODU: REU student presentations (Jul 20) - OPS: Larry Weinstein Great Course filming (Jul 21) - JACOW: Conference advisement (COOL'17)
Alex Bogacz
Previous two weeks (Jun 26-Jul 7) - ADMIN: Prep talk on "Challenges and Opportunities of Energy Recovering Linacs" - PERLE: CERN visit (June 19-June 28) coincident with ERL workshop - VACATION: Jun 29-July 7 Next two weeks (July 10-21) - VACATION: June 28-July 10, July 17-18 - USPAS: Travel (Jul 13) - PERLE: Followup discussions after ERL workshop
David Douglas
Previous two weeks (Jun 26-Jul 7) - JLEIC: FAST/IOTA study brainstorming - OPS: StayTreat presentation development for LERF beam studies - JLEIC: ERL/CCR status summary, exchange transport (fighting aberrations) - JLEIC: Continue CCR recirculation arc development - ADMIN: Start packing up trailer office Next two weeks (July 10-21) - VACATION: Jul 12-18 - OPS: Continue StayTreat presentation development - PERLE: CSR/uBI, lattice ruminations - JLEIC: Continue CCR recirculation arc development - JLEIC: Start CCR architecture/doomedness note - JLEIC: Continue work on EmEx with accelerating mode cavity (with Slava) - ADMIN: Perhaps start ruminations on Springer ERL book - ADMIN: Continue packing up trailer office
Rui Li
Previous two weeks (Jun 26-Jul 7) - VACATION: Jun 30, half Jun 29, Jul 3 - ADMIN: three interviews for the postdoc position in Yves' group - JLEIC: detailed calculations of coupled bunch instabilities Next two weeks (July 10-21) - JLEIC: continue detailed calculations of coupled bunch instabilities - JLEIC: Present coupled bunch instability results at R&D meeting - JLEIC: SRF HOM discussions re coupled bunch instabilities - JLEIC: start investigating electron cloud parameters, effect
Ed Nissen
Previous two weeks (Jun 26-Jul 7) - JLEIC: Finish chromaticity corrections; emittance growth verified to be space charge - JLEIC: Continue iterating Booster injection parameters (momentum spread) - JLEIC: Start ramping sections of Booster cycle - JLEIC: Investigate DESIREE for gear-changing; conclude tune spreads too low Next two weeks (July 10-21) - JLEIC: Booster lattice to COSY/COMFY for tune footprint - JLEIC: Iterating base tunes based on COSY/COMFY results - JLEIC: Move on to Booster 6D injection space charge evaluation
Chris Tennant
Previous two weeks (Jun 26-Jul 7) - ADMIN: Wrap-up after ERL17 workshop (Jun 18-Jun 23) - PERLE: Checking elegant lattice (translated by Yves) - PERLE: initial uBI gain analysis - ADMIN: Start packing up office :( Next two weeks (July 10-21) - JLEIC: Continue electron cooler work (continue pushing 3nC distribution) - JLEIC: Test project E merger with electron cooler - ADMIN: Continue packing up trailer office - VACATION: Jul 17-21
Randy Gamage
Previous two weeks (Jun 26-Jul 7) - JLEIC: Coasting beam instability calculations/simulations - Dissertation writing: Continue coasting beam chapter, tech note Next two weeks (July 10-21) - JLEIC: Continue coasting beam instability calculations/simulations - Dissertation writing: Continue coasting beam chapter, tech note
Accelerator R and D (Y. Zhang)
No report.
Computational Physics (Y. Roblin)
Yves Roblin:
- Last week vacation
- Before this:
- working on PRL referee report (submitted today)
- reread articles on gear changing, trying to reproduce Hao Paper with BB3D
- modifying BB3D to do gear changing
- Interviewed candidates for #11807.
He Zhang:
- Worked on cooling simulations for DC cooling scenarios where one reuses the b. beam cooler.
- Conclusion is that one can cool after filling the booster at 8GeV. 30 meters of solenoid, 3A of e- current and about 10 minutes of cooling time.
- interview panel for #11807
- working on user interface for JSPEC
- working with summer student.
Diagnostic Development (K. Jordan)
No report.
LERF (S. Benson)
No report.