Difference between revisions of "2018-05-11"
Jump to navigation
Jump to search
(Created page with "'''Director - M. Spata'''<br> ''No report.'' Acting Accelerator Division Head. ---- '''Accelerator Physics - T. Satogata'''<br> ---- '''Accelerator R & D - Y. Zhang'...") |
|||
Line 25: | Line 25: | ||
---- | ---- | ||
'''LERF - S. Benson''' <br> | '''LERF - S. Benson''' <br> | ||
+ | April 30-May 11 | ||
+ | **Worked on preparing the LERF for the isotope visit | ||
+ | **Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes | ||
+ | **Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work. | ||
+ | **Started putting together AWP for FOA proposal | ||
+ | **Hosted visit from Steve Peggs for CBETA discussions | ||
+ | |||
+ | May 14-25 | ||
+ | **Arrange for collaboration with HZDR for Elbe II facility. | ||
+ | **Complete AWP for FOA proposal | ||
+ | **Derive draft budget for isotope production | ||
+ | **Revise LOD to match new ASE document. | ||
+ | **Continue cleaning up the LERF for isotope visit. | ||
+ | **Attend teleconference with DOE for isotope project. |
Revision as of 08:37, 14 May 2018
Director - M. Spata
No report. Acting Accelerator Division Head.
Accelerator Physics - T. Satogata
Accelerator R & D - Y. Zhang
Computational Physicss - Y. Roblin
Diagnostic Development - K. Jordan
LERF - S. Benson
April 30-May 11
- Worked on preparing the LERF for the isotope visit
- Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
- Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
- Started putting together AWP for FOA proposal
- Hosted visit from Steve Peggs for CBETA discussions
May 14-25
- Arrange for collaboration with HZDR for Elbe II facility.
- Complete AWP for FOA proposal
- Derive draft budget for isotope production
- Revise LOD to match new ASE document.
- Continue cleaning up the LERF for isotope visit.
- Attend teleconference with DOE for isotope project.