Difference between revisions of "2018-05-11"

From Administrative
Jump to navigation Jump to search
Line 26: Line 26:
 
'''LERF - S. Benson''' <br>
 
'''LERF - S. Benson''' <br>
 
April 30-May 11
 
April 30-May 11
**Worked on preparing the LERF for the isotope visit
+
*Worked on preparing the LERF for the isotope visit
**Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
+
*Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
**Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
+
*Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
**Started putting together AWP for FOA proposal  
+
*Started putting together AWP for FOA proposal  
**Hosted visit from Steve Peggs for CBETA discussions
+
*Hosted visit from Steve Peggs for CBETA discussions
  
 
May 14-25
 
May 14-25
**Arrange for collaboration with HZDR for Elbe II facility.
+
*Arrange for collaboration with HZDR for Elbe II facility.
**Complete AWP for FOA proposal
+
*Complete AWP for FOA proposal
**Derive draft budget for isotope production
+
*Derive draft budget for isotope production
**Revise LOD to match new ASE document.
+
*Revise LOD to match new ASE document.
**Continue cleaning up the LERF for isotope visit.
+
*Continue cleaning up the LERF for isotope visit.
**Attend teleconference with DOE for isotope project.
+
*Attend teleconference with DOE for isotope project.

Revision as of 08:38, 14 May 2018

Director - M. Spata
No report. Acting Accelerator Division Head.



Accelerator Physics - T. Satogata



Accelerator R & D - Y. Zhang



Computational Physicss - Y. Roblin



Diagnostic Development - K. Jordan



LERF - S. Benson
April 30-May 11

  • Worked on preparing the LERF for the isotope visit
  • Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
  • Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
  • Started putting together AWP for FOA proposal
  • Hosted visit from Steve Peggs for CBETA discussions

May 14-25

  • Arrange for collaboration with HZDR for Elbe II facility.
  • Complete AWP for FOA proposal
  • Derive draft budget for isotope production
  • Revise LOD to match new ASE document.
  • Continue cleaning up the LERF for isotope visit.
  • Attend teleconference with DOE for isotope project.