Difference between revisions of "2019-06-01-LeadershipReports"
Jump to navigation
Jump to search
(Created page with "May 15, 2019 Report - May 27 - June 21 '''Director - Todd Satogata''' <br> Todd Satogata Previous two weeks (May 27 - June 7) - HOLIDAY: May 27 (Memorial Day)...") |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | June 20, 2019 Report - June 10 - July 5 | |
'''Director - Todd Satogata''' <br> | '''Director - Todd Satogata''' <br> | ||
Todd Satogata | Todd Satogata | ||
− | Previous two weeks ( | + | Previous two weeks (June 10 - June 21) |
- HOLIDAY: May 27 (Memorial Day) | - HOLIDAY: May 27 (Memorial Day) | ||
- VACATION: May 28-31 | - VACATION: May 28-31 | ||
Line 20: | Line 20: | ||
- JLEIC: pCDR-100 restart, R&D planning, meetings | - JLEIC: pCDR-100 restart, R&D planning, meetings | ||
- PERS SICK: Jun 13-14 (Arm surgery) | - PERS SICK: Jun 13-14 (Arm surgery) | ||
+ | |||
Alex Bogacz | Alex Bogacz | ||
+ | Previous two weeks (June 10 - June 21) | ||
+ | - Machine support , OOC | ||
+ | - Summer student lecture on 'Introduction to Accelerators' | ||
+ | - Finalizing Technical Reviewer list for the new Internal Publication system | ||
+ | - Review of IOP submissions for the IPAC'19 Light Peer Review | ||
+ | Next two weeks (June 24 - July 5) | ||
+ | - Machine support , OOC | ||
+ | - 'Dogbone' ERL lattice design - ERL'19 invited talk | ||
+ | - Implementation of the new Internal Publication system | ||
+ | - Revisions to Operations Training, MOODLE | ||
+ | - PRAB paper review | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Rui Li | Rui Li | ||
− | Previous two weeks ( | + | Previous two weeks (June 10 - June 21) |
- Impedance studies | - Impedance studies | ||
− | - | + | - Held JLEIC impedance meetings, with interesting discussion on uneven-bunch spectrum |
− | - | + | - Participated in ALS-U impedance meeting, with interesting discussions on microwave instability |
− | - | + | - Participate in the multilab monthly meeting on collective effects and group discussions |
− | + | I was invited to participate this meeting by its host Marco Ventuini of LBL. It is mostly attended | |
− | + | by the light source people from ALS-U, APS, NSLSII and SLAC. This week's topic is the measurement of | |
− | + | microwave instability at NSLSII and its comparison with simulation. It turns out the IBS effect unexpectedly | |
− | - | + | showing up in the microwave instability measurement. |
− | + | - Analysis of spectrum for uneven bunch distribution | |
− | - | + | - Finished my analysis and presented results at the JLEIC impedance meeting on 6/17 |
− | + | - It explained the modeling results from Frank Marhauser and Gunn Tae Park as presented in the last meeting | |
− | - | + | - Beam dynamics in JLEIC collective effects |
− | + | - I had an extended phone conversation with Bob Warnock of SLAC (he is around 90 year old and is still very | |
− | Next two weeks (June | + | active in beam dynamics studies), discussing various beam dynamics issues in JLEIC and about our common interest |
− | - | + | - He will send me his code on microwave instability, and currently he is developing a new code for coupled-bunch |
− | + | instabilities, and he may run the JLEIC case after the code is done | |
− | + | - Interaction with Vladimir Litvinenko of BNL about CeC | |
− | - | + | - I'm invited by Vladimir to participate their weekly CeC meetings and upcoming experiment on the plasma-cascade |
− | + | amplifier at CeC. I will start participate their weekly meeting | |
− | + | - I got their references about recent activities in CeC, and will try to catch up on their studies. | |
+ | Next two weeks (June 24 - July 5) | ||
+ | - Write up technote on bunch spectra for uneven bunch fill, and compare results with that from Frank Marhauser | ||
+ | - Study the effect of uneven bunch fill on the growth rate of coupled bunch instabilities | ||
+ | - Continue to participate in the ALS-U impedance studies and discuss related beam physics | ||
+ | - Start to participate in the CeC beam studies, pay special attention to microbunching development in their beam | ||
+ | - Organize the next JLEIC impedance meeting | ||
+ | |||
− | |||
Edy Nissen | Edy Nissen | ||
− | + | Previous two weeks (June 10 - June 21) | |
− | - | + | - I was Program deputy from June 12 through June 19, with some preparation beforehand. |
− | - | + | - I am finishing up the formatting of my light peer review paper and will return to pCDR |
− | + | preparation when that is done. | |
− | - | + | Next two weeks (June 24 - July 5) |
+ | - I will continue working on pCDR preparations | ||
+ | - I will be taking July 5 off. | ||
+ | |||
Chris Tennant | Chris Tennant | ||
− | Previous two weeks ( | + | Previous two weeks (June 10 - June 21) |
− | - | + | - Work on implementing pipeline for (near) real-time RF fault classification (goal is to implement and take data during current run) |
− | Next two weeks (June | + | - Served on job panel for SSI hire in IT (4 candidate interviews) |
− | - | + | - Helped Bhawin with longitudinal manipulations in elegant |
+ | - General editing for others (paper for SRF workshop, proposal for JSA Initiative, software requirements document for SRF fault classification) | ||
+ | - Work to understand BNL CeC requirements | ||
+ | Next two weeks (June 24 - July 8) | ||
+ | - Vacation (June 24-28, July 5) | ||
+ | - Prepare slides for LDRD presentation | ||
+ | |||
+ | |||
Line 81: | Line 103: | ||
Yuhong Zhang | Yuhong Zhang | ||
− | Previous two weeks ( | + | Previous two weeks (June 10 - June 21) |
- | - | ||
− | Next two weeks (June | + | Next two weeks (June 24 - July 5) |
- | - | ||
Fanglei Lin | Fanglei Lin | ||
+ | Previous two weeks (June 10 - June 21) | ||
+ | - Working on the transparent spin project | ||
+ | - Working on the storage ring cooler project | ||
+ | - Updating the pCDR-100 | ||
+ | - Preparing tutorial material for ZGOUBI workshorp | ||
+ | - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended | ||
+ | the Storage Ring Cooler meeting, attended JLEIC R&D meeting, attended ZGOUBI workshop | ||
+ | committee meetings, attended IR magnet design meeting | ||
+ | Next two weeks (June 24 - July 5) | ||
+ | - Update the pCDR-100 | ||
+ | - Work on the transparent spin project | ||
+ | - Work on the storage ring cooler project | ||
+ | - Prepare tutorial material for ZGOUBI workshop | ||
+ | |||
− | |||
− | |||
− | |||
− | |||
Line 113: | Line 145: | ||
Previous two weeks (May 27 - June 7) | Previous two weeks (May 27 - June 7) | ||
− | - | + | - Implemented newer linac accelerator node modules in PyORBIT for the superconducting section of |
− | + | the proton/H- linac lattice. Still some mismatch in the optics compared to TRACK simulation, likely | |
− | of | + | due to the use of cavity field maps in TRACK that are not currently available to be read in PyORBIT. |
− | - | + | - Implemented DTL section of the proton/H- linac lattice using newer linac accelerator node modules. |
− | + | Having issues with cavity phasing and beam stability. | |
− | + | - Worked with summer student Madeline Clyburn to run TRACK simulations of the H- linac, calculate average | |
− | + | power of the H- linac and beam current needed to reach 1 MW average power, and start running PyORBIT simulations | |
− | + | of the H- linac. | |
− | - | + | - Generated charge state distributions for lead ions passing through carbon foils at incident energies 8-15 MeV/u. |
− | Next two weeks (June | + | Next two weeks (June 24 - July 5) |
− | - | + | - Continued work with PyORBIT including: troubleshooting the DTL linac implementation and lack of beam stability, |
− | + | and optimization of the superconducting portion of the linac for better matching with TRACK. | |
− | + | - Working with Madeline to extract transverse and longitudinal rms velocities along the linac for H- intrabeam stripping estimates. | |
− | + | - Estimates of angular distributions of lead ions after passing through carbon stripping foils, putting together a stripping chicane in TRACK. | |
− | - Working with Madeline to | + | |
− | |||
Line 149: | Line 180: | ||
Previous two weeks (May 27 - June 7) | Previous two weeks (May 27 - June 7) | ||
− | - | + | - Updates and Python wrapper for tpsa lib - This week I was writing examples and tutorials for the tpsa lib |
+ | and its python wrapper. During this process, several bugs were found and fixed. The first bug is in the sin() | ||
+ | and cos() functions. It happens when the number of variables in the function is less than the dimension of the | ||
+ | DA environment. For example, calculate sin(fx) in 3D environment while fx is a function of only two da variables. | ||
+ | The result is correct, but the length of the result is wrong. This is fixed by adding a check of vector length in | ||
+ | the sin() and cos() functions. The second bug happens in the bunch processing of substituting the variables in a DA | ||
+ | vector by other DA vectors. There was an error when calculating the index of a given element for multipole DA vectors. | ||
+ | This is fixed too. Some other problems are due to the data transaction between python and C++. By default, Pybind | ||
+ | transfers the variables by value. If the C++ function expects a reference, the result by C++ cannot be transferred | ||
+ | to Python, although the C++ function works. This is solved by defining the variable to transfer as a specific opaque | ||
+ | variable so that it can be transferred by reference. One has to define the fundamental operations for the variable so | ||
+ | that it can be handled on Python side. These bugs are fixed too. The manual of the python tpsa lib has been updated | ||
+ | but not finished. | ||
Next two weeks (June 10 - June 21) | Next two weeks (June 10 - June 21) | ||
− | - | + | - Finish the ibs formula by Kubo and Oide. |
+ | - Write documents for the tpsa python wrapper | ||
+ | - Dispersive cooling (New friction force formulas and benchmark with theory). | ||
+ | |||
− | River | + | River Huang |
Previous two weeks (May 27 - June 7) | Previous two weeks (May 27 - June 7) | ||
Line 177: | Line 223: | ||
Previous two weeks (May 27 - June 7) | Previous two weeks (May 27 - June 7) | ||
− | - | + | - Working on getting the Magnetron installed in LERF Lab 1 |
+ | - Sorting through the abstracts for IBIC 2019, also contacting the recipient for the Faraday Cup Award | ||
+ | - Built a new hBN crucible for the isotope experiment | ||
+ | - Installed surrogate high speed rad-hard camera in front of North Linac, there were some issues getting | ||
+ | it up & running but all is good now | ||
+ | - Working to get the Hot Wire Anemometer (HWA) running in LSLC-II helium transfer line | ||
Next two weeks (June 10 - June 21) | Next two weeks (June 10 - June 21) | ||
− | - | + | - Get meaningful results from the HWA |
+ | - Solve cooling water challenges with Magnetrton | ||
+ | - Build test load for isotope experiment & help Joe get the movable shielding installed | ||
+ | - Complete my assignments for IBIC 2019 | ||
+ | |||
Joe Gubeli | Joe Gubeli | ||
− | Previous two weeks ( | + | Previous two weeks (June 10 - June 24) |
− | - | + | - Isotope Experiment – Competed the mechanical assembly of the Isotope experiment shielding. |
− | Next two weeks (June | + | The top plate of both the radiator and target assembly will need some anchor holes added to clamp down the HW. |
− | - | + | - High Power Wire Scanner (HPWS) – Work continues with the HPWS. One of the two linear motor forcers |
+ | was replaced. The forcer overheated when the current ramped to its limit for a few minutes. The assembly | ||
+ | was pumped down when it was sitting horizontal on an optical table. Once the assembly was under vacuum | ||
+ | there was some bellows scraping. After talk to our Radiabeam partners about this issue it was decided to | ||
+ | move the assemble to its stand which supports the assembly at 45 degrees and test it then. In this orientation | ||
+ | bellows scraping could be heard when under vacuum or vented. Marcos from Radiabeam came for two days to help | ||
+ | diagnose this issues and others. A S&A group was able to realign the assemble in very short notice. Once they | ||
+ | were done the assemble translate smoothly and without noise when vented. Under vacuum the translation is still | ||
+ | smooth but some bellows noise can be heard. The bellows manufacture clams that this is normal and not an issue. | ||
+ | - LDRDS – The assembly was taken to the vacuum lab to be checked for cleanliness. We have a couple of options | ||
+ | depending on the test results. | ||
+ | Next two weeks (June 24 - July 5) | ||
+ | - Isotope experiment | ||
+ | - HPWS | ||
+ | - LDRDS (for FAST) | ||
+ | |||
+ | |||
Line 193: | Line 264: | ||
Previous two weeks (May 27 - June 7) | Previous two weeks (May 27 - June 7) | ||
− | - | + | - Preparation for HPS run in Hall B, including Hall B model updates |
+ | - Studying options for Hall B skew compensator for Lambertson magnet | ||
+ | - Considering causes of recent magnet system damage events | ||
+ | - Consultation with Hall A about PREX2 BPM anomalies | ||
Next two weeks (June 10 - June 21) | Next two weeks (June 10 - June 21) | ||
− | - | + | - Serving as optics on-call and generally tracking beam setup progress/performance |
+ | - Hands-on service with Hall B setup | ||
+ | - Diagnostic design for speculative MXR2T06 SLM | ||
+ | - Modeling 7A SLM matching process | ||
+ | - Sketching a proposal for Lambertson skew quadrupole corrector | ||
+ | |||
Latest revision as of 09:00, 25 June 2019
June 20, 2019 Report - June 10 - July 5
Director - Todd Satogata
Todd Satogata
Previous two weeks (June 10 - June 21) - HOLIDAY: May 27 (Memorial Day) - VACATION: May 28-31 - IPAC19: Light peer review coordination (with Alex Bogacz) - JLEIC: R&D planning, pCDR-100 restart, final IPAC papers, meetings - ADMIN: Student meetings/planning (Madeline, Sarah) - ADMIN: SSIII job posting review, committee planning - OPS: Run planning, optics on call planning for restart - ADMIN: HEP Gard telecon (Jun 7) Next two weeks (Jun 10-Jun 21) - ADMIN: SBIR FOA edit meet (Jun 10) - ADMIN: Student meetings/planning (Madeline, Sarah) - ADMIN: SSIII job posting selection, start phone interviews - ADMIN: Review M/FURA committee prize applications - JLEIC: pCDR-100 restart, R&D planning, meetings - PERS SICK: Jun 13-14 (Arm surgery)
Alex Bogacz
Previous two weeks (June 10 - June 21) - Machine support , OOC - Summer student lecture on 'Introduction to Accelerators' - Finalizing Technical Reviewer list for the new Internal Publication system - Review of IOP submissions for the IPAC'19 Light Peer Review Next two weeks (June 24 - July 5) - Machine support , OOC - 'Dogbone' ERL lattice design - ERL'19 invited talk - Implementation of the new Internal Publication system - Revisions to Operations Training, MOODLE - PRAB paper review
Rui Li
Previous two weeks (June 10 - June 21) - Impedance studies - Held JLEIC impedance meetings, with interesting discussion on uneven-bunch spectrum - Participated in ALS-U impedance meeting, with interesting discussions on microwave instability - Participate in the multilab monthly meeting on collective effects and group discussions I was invited to participate this meeting by its host Marco Ventuini of LBL. It is mostly attended by the light source people from ALS-U, APS, NSLSII and SLAC. This week's topic is the measurement of microwave instability at NSLSII and its comparison with simulation. It turns out the IBS effect unexpectedly showing up in the microwave instability measurement. - Analysis of spectrum for uneven bunch distribution - Finished my analysis and presented results at the JLEIC impedance meeting on 6/17 - It explained the modeling results from Frank Marhauser and Gunn Tae Park as presented in the last meeting - Beam dynamics in JLEIC collective effects - I had an extended phone conversation with Bob Warnock of SLAC (he is around 90 year old and is still very active in beam dynamics studies), discussing various beam dynamics issues in JLEIC and about our common interest - He will send me his code on microwave instability, and currently he is developing a new code for coupled-bunch instabilities, and he may run the JLEIC case after the code is done - Interaction with Vladimir Litvinenko of BNL about CeC - I'm invited by Vladimir to participate their weekly CeC meetings and upcoming experiment on the plasma-cascade amplifier at CeC. I will start participate their weekly meeting - I got their references about recent activities in CeC, and will try to catch up on their studies. Next two weeks (June 24 - July 5) - Write up technote on bunch spectra for uneven bunch fill, and compare results with that from Frank Marhauser - Study the effect of uneven bunch fill on the growth rate of coupled bunch instabilities - Continue to participate in the ALS-U impedance studies and discuss related beam physics - Start to participate in the CeC beam studies, pay special attention to microbunching development in their beam - Organize the next JLEIC impedance meeting
Edy Nissen
Previous two weeks (June 10 - June 21) - I was Program deputy from June 12 through June 19, with some preparation beforehand. - I am finishing up the formatting of my light peer review paper and will return to pCDR preparation when that is done. Next two weeks (June 24 - July 5) - I will continue working on pCDR preparations - I will be taking July 5 off.
Chris Tennant
Previous two weeks (June 10 - June 21) - Work on implementing pipeline for (near) real-time RF fault classification (goal is to implement and take data during current run) - Served on job panel for SSI hire in IT (4 candidate interviews) - Helped Bhawin with longitudinal manipulations in elegant - General editing for others (paper for SRF workshop, proposal for JSA Initiative, software requirements document for SRF fault classification) - Work to understand BNL CeC requirements Next two weeks (June 24 - July 8) - Vacation (June 24-28, July 5) - Prepare slides for LDRD presentation
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (June 10 - June 21) - Next two weeks (June 24 - July 5) -
Fanglei Lin
Previous two weeks (June 10 - June 21) - Working on the transparent spin project - Working on the storage ring cooler project - Updating the pCDR-100 - Preparing tutorial material for ZGOUBI workshorp - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, attended JLEIC R&D meeting, attended ZGOUBI workshop committee meetings, attended IR magnet design meeting Next two weeks (June 24 - July 5) - Update the pCDR-100 - Work on the transparent spin project - Work on the storage ring cooler project - Prepare tutorial material for ZGOUBI workshop
Vasiliy Morozov
Previous two weeks (May 27 - June 7) - IR design: chromaticity compensation, detector simulations, iterating with engineers - Spin experiment: spin tracking RHIC - Storage ring cooler: analysis of the longitudinal dynamics - Preparing for trip to CERN Next two weeks (June 10 - June 21) - Continue spin tracking for the spin experiment - Tracking the dynamic aperture of the ion collider ring - Updating pre-CDR
Amy Sy
Previous two weeks (May 27 - June 7) - Implemented newer linac accelerator node modules in PyORBIT for the superconducting section of the proton/H- linac lattice. Still some mismatch in the optics compared to TRACK simulation, likely due to the use of cavity field maps in TRACK that are not currently available to be read in PyORBIT. - Implemented DTL section of the proton/H- linac lattice using newer linac accelerator node modules. Having issues with cavity phasing and beam stability. - Worked with summer student Madeline Clyburn to run TRACK simulations of the H- linac, calculate average power of the H- linac and beam current needed to reach 1 MW average power, and start running PyORBIT simulations of the H- linac. - Generated charge state distributions for lead ions passing through carbon foils at incident energies 8-15 MeV/u. Next two weeks (June 24 - July 5) - Continued work with PyORBIT including: troubleshooting the DTL linac implementation and lack of beam stability, and optimization of the superconducting portion of the linac for better matching with TRACK. - Working with Madeline to extract transverse and longitudinal rms velocities along the linac for H- intrabeam stripping estimates. - Estimates of angular distributions of lead ions after passing through carbon stripping foils, putting together a stripping chicane in TRACK.
Computational Physics - Yves Roblin
Yves Roblin
CEBAF - JLEIC: - OTHER -
He Zhang
Previous two weeks (May 27 - June 7) - Updates and Python wrapper for tpsa lib - This week I was writing examples and tutorials for the tpsa lib and its python wrapper. During this process, several bugs were found and fixed. The first bug is in the sin() and cos() functions. It happens when the number of variables in the function is less than the dimension of the DA environment. For example, calculate sin(fx) in 3D environment while fx is a function of only two da variables. The result is correct, but the length of the result is wrong. This is fixed by adding a check of vector length in the sin() and cos() functions. The second bug happens in the bunch processing of substituting the variables in a DA vector by other DA vectors. There was an error when calculating the index of a given element for multipole DA vectors. This is fixed too. Some other problems are due to the data transaction between python and C++. By default, Pybind transfers the variables by value. If the C++ function expects a reference, the result by C++ cannot be transferred to Python, although the C++ function works. This is solved by defining the variable to transfer as a specific opaque variable so that it can be transferred by reference. One has to define the fundamental operations for the variable so that it can be handled on Python side. These bugs are fixed too. The manual of the python tpsa lib has been updated but not finished. Next two weeks (June 10 - June 21) - Finish the ibs formula by Kubo and Oide. - Write documents for the tpsa python wrapper - Dispersive cooling (New friction force formulas and benchmark with theory).
River Huang
Previous two weeks (May 27 - June 7) - NAPAC2019 - Finished and submitted the abstract of the paper “Simulation of Transparent Spin Experiment in RHIC” and JLab JaCow for 2019 North American Particle Accelerator Conference. - "CASA BeamBeam" - Optimized and accelerated the transformation parts of “Crab Kick” of “CASA BeamBeam” codes by Using “Thread” of Python3 and Numba JIT method. - pyFMM - pyFMM is in testing process. In future, if possible, we wish to develop pyFMM to deal the irregularly shaped bunches in the interactions when crabbing. - Particles Spin - Form RHIC original snake setting, we are starting to check Twiss w/o error and to track spin in one turn by using Zgoubi. Next two weeks (June 10 - June 21) -
Diagnostic Development - Kevin Jordan
Previous two weeks (May 27 - June 7) - Working on getting the Magnetron installed in LERF Lab 1 - Sorting through the abstracts for IBIC 2019, also contacting the recipient for the Faraday Cup Award - Built a new hBN crucible for the isotope experiment - Installed surrogate high speed rad-hard camera in front of North Linac, there were some issues getting it up & running but all is good now - Working to get the Hot Wire Anemometer (HWA) running in LSLC-II helium transfer line Next two weeks (June 10 - June 21) - Get meaningful results from the HWA - Solve cooling water challenges with Magnetrton - Build test load for isotope experiment & help Joe get the movable shielding installed - Complete my assignments for IBIC 2019
Joe Gubeli
Previous two weeks (June 10 - June 24) - Isotope Experiment – Competed the mechanical assembly of the Isotope experiment shielding. The top plate of both the radiator and target assembly will need some anchor holes added to clamp down the HW. - High Power Wire Scanner (HPWS) – Work continues with the HPWS. One of the two linear motor forcers was replaced. The forcer overheated when the current ramped to its limit for a few minutes. The assembly was pumped down when it was sitting horizontal on an optical table. Once the assembly was under vacuum there was some bellows scraping. After talk to our Radiabeam partners about this issue it was decided to move the assemble to its stand which supports the assembly at 45 degrees and test it then. In this orientation bellows scraping could be heard when under vacuum or vented. Marcos from Radiabeam came for two days to help diagnose this issues and others. A S&A group was able to realign the assemble in very short notice. Once they were done the assemble translate smoothly and without noise when vented. Under vacuum the translation is still smooth but some bellows noise can be heard. The bellows manufacture clams that this is normal and not an issue. - LDRDS – The assembly was taken to the vacuum lab to be checked for cleanliness. We have a couple of options depending on the test results. Next two weeks (June 24 - July 5) - Isotope experiment - HPWS - LDRDS (for FAST)
Michael Tiefenback
Previous two weeks (May 27 - June 7) - Preparation for HPS run in Hall B, including Hall B model updates - Studying options for Hall B skew compensator for Lambertson magnet - Considering causes of recent magnet system damage events - Consultation with Hall A about PREX2 BPM anomalies Next two weeks (June 10 - June 21) - Serving as optics on-call and generally tracking beam setup progress/performance - Hands-on service with Hall B setup - Diagnostic design for speculative MXR2T06 SLM - Modeling 7A SLM matching process - Sketching a proposal for Lambertson skew quadrupole corrector
CASA Fellows
LERF - Steve Benson
Previous two weeks (May 27 - June 7) - Reviewed Early career proposal - Worked with Tom Oren to get LOD modification out. - Developed safety documents for Isotope ERR. - Scheduled seminar for Riad Suleiman for GTS gun results - Worked to set up clean assembly of LDRD viewer - Developed run plan for June 18-19 run to 1G - Gave tour of LERF to Operations Group Candidate - Worked with CIS group to come up with laser solution for Chameleon experiment in User Lab 1 Next two weeks (June 10 - June 21) - Attend FAST/IOTA workshop at Fermilab and consult with personnel on LDRD installation and future run plans. - Help out with setup run for LERF running to 1G dump. - Go over PreCDR and update sections that need it. - Summarize the ERLs for EIC workshop.
Andrew Hutton
Previous two weeks (May 27 - June 7) - Attend JLEIC meetings. - For the Isotope Program I held a successful brainstorming session on the target holder (the raft) design. On Monday, I was asked to give a talk to HUGS on the program but I had not given a talk for a long time. Spent 2 1/2 days preparing a talk (attached) and delivered it. - Sarah arrived last week for the summer. I spent time getting her settled and answering questions. Her topic for the summer is to take the existing WiFEL gun, which was optimized for low-charge, ultra-low emittance, short bunches) and examine whether it can be tuned to produce high-charge, long bunches. She is learning GPT for this. - ALCC meeting (6/7) - apparently the ILC is not yet totally dead Next two weeks (June 10 - June 21) - Focus on readying the LERF for beam and launching with Sarah - Vacation