− | + | Nov 7 2019 Report - Oct 28 - Nov 22 | |
'''Director - Todd Satogata''' <br> | '''Director - Todd Satogata''' <br> | ||
Todd Satogata | Todd Satogata | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - ADMIN 12 GeV PRAB paper planning | + | - ADMIN 12 GeV PRAB paper planning/writing, PRAB paper review |
− | - ADMIN | + | - ADMIN Calls with BNL colleagues re SSIII scientist applicant |
− | - | + | - MGMT Start annual appraisals, evaluations; AWP updates |
− | + | - JLEIC R&D planning, organizing activities post-collaboration meeting | |
− | + | - JACOW Team meeting preparations, IPAC'20 SPC/3 preparations | |
− | - JLEIC | + | - OPS hall liaison planning and meeting |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | - JACOW Team | ||
− | |||
- ODU PHYS854 teaching (with Geoff Krafft) | - ODU PHYS854 teaching (with Geoff Krafft) | ||
+ | - SICK (Oct 30, part Nov 4, part Nov 6) | ||
+ | Next two weeks (Nov 11 - Nov 22) | ||
+ | - MGMT Continue annual appraisals, evaluations; AWP updates | ||
+ | - ADMIN 12 GeV PRAB paper planning, writing | ||
+ | - JLEIC Further R&D planning, travel planning for coolign collaboration | ||
+ | - JACOW IPAC'20 abstract preparation | ||
+ | - OPS CEBAF restart, BTeam, run and optics support planning | ||
+ | - VACATION (Nov 11-15) | ||
+ | |||
Line 130: | Line 127: | ||
Fanglei Lin | Fanglei Lin | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - Worked on the storage ring cooler project, and | + | - Worked on the storage ring cooler project, and reported the progress in the storage ring cooler meeting |
− | - | + | - Revisited the electron top-off injection scheme for JLEIC |
− | - Miscellaneous: attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi | + | - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, |
− | + | attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi with Radiasoft | |
− | Next two weeks ( | + | colleagues, attended JLEIC detector meeting, |
− | - | + | Next two weeks (Nov 11 - Nov 22) |
+ | - Evaluate the IR design for various electron energies | ||
- Work on the storage ring cooler project | - Work on the storage ring cooler project | ||
+ | - Work on teaching material for a USPAS class | ||
+ | |||
Line 147: | Line 147: | ||
Previous two weeks (Oct 14 - Oct 25) | Previous two weeks (Oct 14 - Oct 25) | ||
- Working on longitudinal dynamics and stability in two energy storage ring cooler. | - Working on longitudinal dynamics and stability in two energy storage ring cooler. | ||
− | - Working | + | - Working with new lattice. Dr Fanglei Lin has designed new optics for two energy storage ring cooler. |
− | - | + | - Single and many particles tracking. |
− | + | - Understanding of bunching cavity phase and the stability based on particle tracking. | |
− | - | + | Next two weeks (Nov 11 - Nov 22) |
− | Next two weeks ( | + | - Optimization of parameters in two energy storage ring design. |
− | - | + | - Single and many particles tracking using new lattice. |
− | - | + | - Energy spread and bucket height simulation based on bunching cavity voltage. |
− | + | - Preparing a talk for Nov 22 Friday "High innovative cooler meeting". | |
− | - | ||
− | - | ||
Line 176: | Line 174: | ||
Amy Sy | Amy Sy | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8): |
− | - DOE | + | - Participation in the DOE independent project review of LBNF/DUNE. Chaired the subcommittee reviewing the Beamline WBS. |
+ | - Completed final report for LBNF/DUNE review. | ||
+ | - Continued work on heavy ion stripping chicane design in TRACK, particularly looking at longitudinal dynamics of | ||
+ | stripped lead ions after traversing a four dipole chicane. | ||
+ | Next two weeks (Nov 11 - Nov 22) | ||
+ | - Continued work on linac optimization for reduced transverse emittance. | ||
- Continued work on heavy ion stripping chicane design in TRACK and PyORBIT. | - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT. | ||
− | - Continued work on TRACK vs PyORBIT comparison for linac simulations. | + | - Continued work on TRACK vs PyORBIT comparison for linac simulations. |
− | + | - Preparation of abstracts for IPAC20. | |
− | + | ||
− | |||
− | |||
− | |||
− | - | ||
− | |||
Line 198: | Line 196: | ||
'''Computational Physics - Yves Roblin'''<br> | '''Computational Physics - Yves Roblin'''<br> | ||
Yves Roblin | Yves Roblin | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
- CEBAF: | - CEBAF: | ||
− | - | + | - BTEAM meetings |
− | + | - Preparing and investigating alternate schemes for reduced linac gradients | |
− | - | + | - Schedule and coordination for startup |
− | - | ||
− | |||
− | |||
− | |||
- JLEIC: | - JLEIC: | ||
− | - | + | - FOA PI meeting at DOE |
− | - | + | - Rescoping of FOA |
− | - | + | - Meeting with student every week |
+ | - Meeting with CNU prof and jlab operations for use of drones in tunnel (AI) | ||
+ | - Organizing committee for AI workshop | ||
- OTHER | - OTHER | ||
− | - | + | - Preparing lecture for SPIN2020 school. Initial gathering and writing of agenda |
− | + | Next two weeks (Nov 11 - Nov 22) | |
− | + | - SLLP training in Chicago | |
− | Next two weeks ( | + | - Machine startup |
− | - | + | |
− | - | ||
− | |||
Line 224: | Line 218: | ||
Randi Gamage | Randi Gamage | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - | + | - Correcting beta distortion (in progress) |
− | - | + | - Multipole correction |
− | + | Next two weeks (Nov 11 - Nov 22) | |
− | Next two weeks ( | ||
− | |||
- Continue to correct beta function distortion | - Continue to correct beta function distortion | ||
− | - Continue | + | - Continue different Multipole corrector schemes |
− | |||
− | |||
Line 260: | Line 250: | ||
Isurumali Neththikumara | Isurumali Neththikumara | ||
− | Previous two weeks () | + | Previous two weeks (Oct 28 - Nov 8) |
− | - | + | - Edited the script to output 6-D coordinates of a specific particle. |
− | Next two weeks () | + | Next two weeks (Nov 11 - Nov 22) |
− | - | + | - Calculation of Lyapunov exponent using the data obtained from BB3D simulations. |
Line 270: | Line 260: | ||
Dennis Turner | Dennis Turner | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - | + | - I was out quite a bit due to having a loved one in the hospital. |
− | - | + | - 130keV emittance measurements. |
− | + | - qsUtility tweaks. | |
− | + | - Discussion with Chris Tennant about using ML for pathlength prediction. | |
− | - | + | - Elegant deck for Injector upgrade |
− | - | + | - Modified the elegant 'view3dgeometry' tool to help with building the deck |
− | - | + | - Attended BTeam and AI lunch meetings. |
− | - | + | Next two weeks (Nov 11 - Nov 22) |
− | |||
− | - Attended BTeam | ||
− | Next two weeks ( | ||
- Analyze 130keV emittance measurement data. | - Analyze 130keV emittance measurement data. | ||
+ | - Develop a separate tool for performing ansd analyzing 130keV emittance measurements | ||
- Continue work on assigned sections for the 12GeV PRAB paper. | - Continue work on assigned sections for the 12GeV PRAB paper. | ||
- Configure optics for the Injector upgrade elegant deck. | - Configure optics for the Injector upgrade elegant deck. | ||
Line 289: | Line 277: | ||
- Finish QTSnyder upgrade and write ATLis for testing | - Finish QTSnyder upgrade and write ATLis for testing | ||
- Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings. | - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings. | ||
+ | - Assist with CEBAF startup as needed. | ||
+ | |||
Line 297: | Line 287: | ||
He Zhang | He Zhang | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - JSPEC - | + | - JSPEC - Our colleague, Dr. Bruker, refactored the Martini model for IBS rate calculation and send a pull request to the |
− | + | github repository. I doublechecked his work and revised slightly mostly for coding style. Inspired by his work, I | |
− | + | refactored the Bjorken-Mtingwa model. Since Bruker’s work is on the version before I added the IBS contribution by | |
− | + | element feature, I implemented this again after refactoring the IBS formulas. | |
− | + | - Other - Prepared a few slides on cooling code development FOA for the DOE PI meeting. | |
− | + | Next two weeks (Nov 11 - Nov 22) | |
− | - | + | - Refactor electron cooling rate calculation. Revisit the particle model and the turn-by-turn model. Make sure they work |
− | + | well. | |
− | |||
− | Next two weeks ( | ||
- Start working on JSPEC benchmarking with Lanzhou experimental data. | - Start working on JSPEC benchmarking with Lanzhou experimental data. | ||
− | - | + | - Vacation in the second week. |
− | |||
Line 362: | Line 349: | ||
LERF - Steve Benson | LERF - Steve Benson | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - | + | - Finished setting up seminars for November 14, 19, 21, and Dec. 12 ( with a lot of help from Tristan) |
− | - | + | - Reviewed paper on Compton gamma ray sources for DOE review. |
− | + | - Restarted Cooler ring meetings and wrote up summary | |
− | - | + | - Update Manouchehr Farkhondeh with budget details of SOW change for IMP experiment. |
− | + | - Worked on punch list items for the Isotope ERR | |
− | - | + | - Prepared slides for and attended the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD. |
− | - | + | Next two weeks (Nov 11 - Nov 22) |
− | + | - Submit Test plans for 1G run | |
− | - Prepared | + | - Review SBIR |
− | Next two weeks ( | + | - Review PRAB paper |
+ | - Get kicker coils for RF merge test completed | ||
- Certify User Lab 4 in the LERF | - Certify User Lab 4 in the LERF | ||
+ | - Complete punch list items for Isotope ERR | ||
- Submit papers for ERL workshop | - Submit papers for ERL workshop | ||
- Assist in run to the 1G dump with CW beam. | - Assist in run to the 1G dump with CW beam. | ||
− | + | ||
− | |||
− | |||
Line 387: | Line 374: | ||
Andrew Hutton | Andrew Hutton | ||
− | Previous two weeks (Oct | + | Previous two weeks (Oct 28 - Nov 8) |
− | - | + | - Preparing a talk on the history of JLab for the 86th Annual Meeting of the APS Southeastern Section 0n Friday, November |
+ | 8, 2019 in Wrightsville Beach, North Carolina. I had never done a talk like this and it took a lot of reading and | ||
+ | preparation. I would be happy to give the talk to the members of CASA to make the effort worth while - there were only | ||
+ | 20 people at the talk at SESAPS! | ||
Next two weeks (Oct 28 - Nov 8) | Next two weeks (Oct 28 - Nov 8) | ||
− | - | + | - Gearing up for a 1G run with CW beam in LERF as well as finalizing the preparations for our first isotope irradiation. |
+ | I have a meeting of VNECA in Richmond tomorrow. | ||
+ | - I will be having (very) minor outpatient surgery this week so I will be out a fair bit with pre-op and post op |
Latest revision as of 12:12, 10 December 2019
Nov 7 2019 Report - Oct 28 - Nov 22
Director - Todd Satogata
Todd Satogata
Previous two weeks (Oct 28 - Nov 8) - ADMIN 12 GeV PRAB paper planning/writing, PRAB paper review - ADMIN Calls with BNL colleagues re SSIII scientist applicant - MGMT Start annual appraisals, evaluations; AWP updates - JLEIC R&D planning, organizing activities post-collaboration meeting - JACOW Team meeting preparations, IPAC'20 SPC/3 preparations - OPS hall liaison planning and meeting - ODU PHYS854 teaching (with Geoff Krafft) - SICK (Oct 30, part Nov 4, part Nov 6) Next two weeks (Nov 11 - Nov 22) - MGMT Continue annual appraisals, evaluations; AWP updates - ADMIN 12 GeV PRAB paper planning, writing - JLEIC Further R&D planning, travel planning for coolign collaboration - JACOW IPAC'20 abstract preparation - OPS CEBAF restart, BTeam, run and optics support planning - VACATION (Nov 11-15)
Alex Bogacz
Previous two weeks (Oct 28 - Nov 8) - Alternative lattice for the LHeC ERL - Invention disclosures review - Appraisals - Vac Next two weeks (Nov 11 - Nov 22) - Vac - SBIR proposal review - Lattice work for nuSTORM - Chapter on the LHeC ERL Optics (The LHeC Technical Design Report )
Rui Li
Previous two weeks (Oct 28 - Nov 8) - Prepare and present JLEIC impedance studies at JLEIC R&D meeting - Participate multi-lab (LBL/SLAC/APS/NSLS-II) monthly seminar on collective effects in electron storage rings (I'm asked to present the next monthly seminar on collective effects in JLEIC) - Continue my collaboration with ALS-U and SLAC on impedance and instability - Literature study on feedback systems for coupled-bunch instability - Discuss with Frank Marhauser and Mark Wiseman on impedance progresses, and plan for the next JLEIC imepedance meeting Next two weeks (Nov 8 - Nov 11) - Organize JLEIC impedance meeting on 11/11 - Finish writing up the technote on spectra for uneven bunch fill - Continue my collaboration with ALS-U and SLAC on impedance and instability - Continue understanding of the feedback systems for coupled bunch instability - Prepare and give presentation on "Collective Effects in Electron-Ion Colliders" for the inter-lab (SLAC/LBL/APS/NSLS- II/JLAB) tele-seminar (focused on collective effects) on 11/22
Edy Nissen
Previous two weeks (Oct 28 - Nov 8) - Finished my proposal for the DESIREE experiment and submitted it, I have received confirmation that it is now with the review committee - Finished the decoupling system in the HEB now that a solenoid has been added - Wrote up a tech note about the current design of the HEB - Am currently working on a description of the DESIREE experiment and the details gained from it Next two weeks (Nov 11 - Nov 22) - Extended Medical Leave
Chris Tennant
Previous two weeks (Oct 28 - Nov 8) - Division seminar prep - CEBAF PRAB manuscript work (verifying data with DT Manager) - ML to model CEBAF pathlength (meet with Dennis T) - Autonomous robot meeting - Work with Gunn Tae on magnetized beam modeling - "Problem of the Quarter" for AI Lunch Series - BNL CeC meeting and slide prep for PI meeting in DC Next two weeks (Nov 11 - Nov 22) - BNL CeC (telecon starting up again) - JLEIC CCR (next approach) - Fine-tune ML models for SRF fault classifier in anticipation of fall run
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (Oct 14 - Oct 25) - Next two weeks (Oct 28 - Nov 8) - Attend the Accelerator R&D PI Exchange Meeting
Max Bruker
Previous (Oct 28 - Nov 8) - Electron cooling theory - Preparation for IMP experiment, travel paperwork - Cool'19 proceedings survey - Learned GPT basics to see if it could substitute CST for magnetized DC beam tracking - Precise modeling of equipotential surfaces seems difficult, so the space charge potential is probably inaccurate - Seems suitable for simple checks of magnetized optics Next (Nov 11 - Nov 22) - Look at data from previous IMP experiment - Become familiar with the deficiencies of the setup
Fanglei Lin
Previous two weeks (Oct 28 - Nov 8) - Worked on the storage ring cooler project, and reported the progress in the storage ring cooler meeting - Revisited the electron top-off injection scheme for JLEIC - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi with Radiasoft colleagues, attended JLEIC detector meeting, Next two weeks (Nov 11 - Nov 22) - Evaluate the IR design for various electron energies - Work on the storage ring cooler project - Work on teaching material for a USPAS class
Bhawin Dhital
Previous two weeks (Oct 14 - Oct 25) - Working on longitudinal dynamics and stability in two energy storage ring cooler. - Working with new lattice. Dr Fanglei Lin has designed new optics for two energy storage ring cooler. - Single and many particles tracking. - Understanding of bunching cavity phase and the stability based on particle tracking. Next two weeks (Nov 11 - Nov 22) - Optimization of parameters in two energy storage ring design. - Single and many particles tracking using new lattice. - Energy spread and bucket height simulation based on bunching cavity voltage. - Preparing a talk for Nov 22 Friday "High innovative cooler meeting".
Vasiliy Morozov
Previous two weeks (Oct 14 - Nov 8) - Optimization of the IBS rate in the ion collider ring -IR design: modeling of the detector region in GEMC and GEANT4 -Preparation for and attendance of the EIC collaboration meeting Next two weeks (Oct 14 - Oct 25) - Attending APS DNP meeting - Preparation for JLAAC meeting - Preparation for EINN meeting
Amy Sy
Previous two weeks (Oct 28 - Nov 8): - Participation in the DOE independent project review of LBNF/DUNE. Chaired the subcommittee reviewing the Beamline WBS. - Completed final report for LBNF/DUNE review. - Continued work on heavy ion stripping chicane design in TRACK, particularly looking at longitudinal dynamics of stripped lead ions after traversing a four dipole chicane. Next two weeks (Nov 11 - Nov 22) - Continued work on linac optimization for reduced transverse emittance. - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT. - Continued work on TRACK vs PyORBIT comparison for linac simulations. - Preparation of abstracts for IPAC20.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (Oct 28 - Nov 8) - CEBAF: - BTEAM meetings - Preparing and investigating alternate schemes for reduced linac gradients - Schedule and coordination for startup - JLEIC: - FOA PI meeting at DOE - Rescoping of FOA - Meeting with student every week - Meeting with CNU prof and jlab operations for use of drones in tunnel (AI) - Organizing committee for AI workshop - OTHER - Preparing lecture for SPIN2020 school. Initial gathering and writing of agenda Next two weeks (Nov 11 - Nov 22) - SLLP training in Chicago - Machine startup
Randi Gamage
Previous two weeks (Oct 28 - Nov 8) - Correcting beta distortion (in progress) - Multipole correction Next two weeks (Nov 11 - Nov 22) - Continue to correct beta function distortion - Continue different Multipole corrector schemes
River Huang
Previous two weeks (Oct 28 - Nov 8) - Transparent Spin Project - We completed the CASA Curve-Fitting python codes based on the least square method. Using our CASA Curve-Fitting we can obtain the numerical results of the spin resonance-strength, the spin field directions, the phases in spin resonance process, the average spin value and the amplitude Again, OPERA field maps with snakes’ parallel (the snake currents were varied using a fitting procedure to adjust the snake axis to 0°) has been put into RHIC’s lattice. After precisely adjusting the total bending angle of all of the dipole magnets to sum up to 2π, we tried to realize the spin transparent in a simulation for the RHIC’s configuration: all of the spin components are constant from turn to turn with a good numerical precision. The four different cases of misalignments was introduced into same RHIC lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was obtained. - CASA Beam-Beam package - For the case β_1x^*≫σ_1x^*,β_2x^*≫σ_2x^*, the analytical solution of the luminosity was derived by us. This new solution has been involved in CASA Beam-Beam package. For JLEIC Parameters and Luminosity Performance, we did the benchmarks. The results of our analytical solution and the numerical results are consistent. Next two weeks (Nov 11 - Nov 22) - Continue working on EIC project
Isurumali Neththikumara
Previous two weeks (Oct 28 - Nov 8) - Edited the script to output 6-D coordinates of a specific particle. Next two weeks (Nov 11 - Nov 22) - Calculation of Lyapunov exponent using the data obtained from BB3D simulations.
Dennis Turner
Previous two weeks (Oct 28 - Nov 8) - I was out quite a bit due to having a loved one in the hospital. - 130keV emittance measurements. - qsUtility tweaks. - Discussion with Chris Tennant about using ML for pathlength prediction. - Elegant deck for Injector upgrade - Modified the elegant 'view3dgeometry' tool to help with building the deck - Attended BTeam and AI lunch meetings. Next two weeks (Nov 11 - Nov 22) - Analyze 130keV emittance measurement data. - Develop a separate tool for performing ansd analyzing 130keV emittance measurements - Continue work on assigned sections for the 12GeV PRAB paper. - Configure optics for the Injector upgrade elegant deck. - Start populating the Injector upgrade CED workspace. - Continue exploring ML with Keras and TensorFlow. - Finish QTSnyder upgrade and write ATLis for testing - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings. - Assist with CEBAF startup as needed.
He Zhang
Previous two weeks (Oct 28 - Nov 8) - JSPEC - Our colleague, Dr. Bruker, refactored the Martini model for IBS rate calculation and send a pull request to the github repository. I doublechecked his work and revised slightly mostly for coding style. Inspired by his work, I refactored the Bjorken-Mtingwa model. Since Bruker’s work is on the version before I added the IBS contribution by element feature, I implemented this again after refactoring the IBS formulas. - Other - Prepared a few slides on cooling code development FOA for the DOE PI meeting. Next two weeks (Nov 11 - Nov 22) - Refactor electron cooling rate calculation. Revisit the particle model and the turn-by-turn model. Make sure they work well. - Start working on JSPEC benchmarking with Lanzhou experimental data. - Vacation in the second week.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (Oct 28 - Nov 8) - Next two weeks (Nov 11 - Nov 22) -
Joe Gubeli
Previous two weeks (Oct 28 - Nov 8) - Isotope Experiment – Helped with adding diagnostic and connecting them to an EPICS controlled systems. Checked viewers needed to run to both the 1G and 1X destinations. Found issues with five of the thirteen viewers and emailed I&C the list. - Halo monitor – Had several discussions with collaborators and created an ATLis beam test plan. - HPWS – Repositioned the HPWS to its nominal operational angle of 45 degrees. Found that in this configuration the full travel cannot be reached due to a current limit setting. Increasing this setting can damage the linear motors. Added a pneumatic cylinder and an air regulator to the HPWS. Set the regulator to move the stage to the center of travel. With this addition the full range of the stage can now be reached. AWP – Completed the AWP for two projects. Next two weeks (Nov 11 - Nov 22) - Isotope Experiment – Prepare for a two day run to the 1G dump. - Halo monitor – Conduct the Halo Monitor experiment in the LERF
Michael Tiefenback
Previous two weeks () - Next two weeks () -
CASA Fellows
LERF - Steve Benson
Previous two weeks (Oct 28 - Nov 8) - Finished setting up seminars for November 14, 19, 21, and Dec. 12 ( with a lot of help from Tristan) - Reviewed paper on Compton gamma ray sources for DOE review. - Restarted Cooler ring meetings and wrote up summary - Update Manouchehr Farkhondeh with budget details of SOW change for IMP experiment. - Worked on punch list items for the Isotope ERR - Prepared slides for and attended the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD. Next two weeks (Nov 11 - Nov 22) - Submit Test plans for 1G run - Review SBIR - Review PRAB paper - Get kicker coils for RF merge test completed - Certify User Lab 4 in the LERF - Complete punch list items for Isotope ERR - Submit papers for ERL workshop - Assist in run to the 1G dump with CW beam.
Andrew Hutton
Previous two weeks (Oct 28 - Nov 8) - Preparing a talk on the history of JLab for the 86th Annual Meeting of the APS Southeastern Section 0n Friday, November 8, 2019 in Wrightsville Beach, North Carolina. I had never done a talk like this and it took a lot of reading and preparation. I would be happy to give the talk to the members of CASA to make the effort worth while - there were only 20 people at the talk at SESAPS! Next two weeks (Oct 28 - Nov 8) - Gearing up for a 1G run with CW beam in LERF as well as finalizing the preparations for our first isotope irradiation. I have a meeting of VNECA in Richmond tomorrow. - I will be having (very) minor outpatient surgery this week so I will be out a fair bit with pre-op and post op