Difference between revisions of "2019-11-8-LeadershipReports"

From Administrative
Jump to navigation Jump to search
(Created page with "Oct 2019 Report - Oct 28 - Nov 22 '''Director - Todd Satogata''' <br> Todd Satogata Previous two weeks (Oct 14 - Oct 25) - ADMIN 12 GeV PRAB paper planning -...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Oct 2019 Report - Oct 28 - Nov 22
+
Nov 7 2019 Report - Oct 28 - Nov 22
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
 
Todd Satogata
 
Todd Satogata
  
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)
       - ADMIN 12 GeV PRAB paper planning
+
       - ADMIN 12 GeV PRAB paper planning/writing, PRAB paper review
       - ADMIN JLAAC review (Oct 22-24)
+
       - ADMIN Calls with BNL colleagues re SSIII scientist applicant
       - ADMIN FY20 AWP planning
+
       - MGMT Start annual appraisals, evaluations; AWP updates
      - ADMIN Xelera SBIR support planning
+
       - JLEIC R&D planning, organizing activities post-collaboration meeting
      - JLEIC/ER@CEBAF JLAAC dry runs and planning
+
       - JACOW Team meeting preparations, IPAC'20 SPC/3 preparations
       - JLEIC FOA quarterly report planning
+
      - OPS hall liaison planning and meeting
      - ODU PHYS854 teaching (with Geoff Krafft)
 
      - OPS Walk Hall D line, run readiness evaluation
 
      - OPS Pre-brief half-day operator meeting (Oct 21)
 
      - VACATION Oct 14, half-day Oct 25
 
  Next two weeks (Oct 28 - Nov 8)
 
      - ADMIN 12 GeV PRAB paper planning
 
      - ADMIN FY20 AWP planning
 
      - ADMIN Review PRAB paper
 
      - ADMIN Recommendation letters (Deepsana Shahi, Mike Lafky)
 
      - ER@CEBAF post-JLAAC planning for summer 2020 chicane install
 
       - JACOW Team Meeting travel preparation
 
      - IPAC'20 SPC/3 Meeting travel preparation
 
 
       - ODU PHYS854 teaching (with Geoff Krafft)
 
       - ODU PHYS854 teaching (with Geoff Krafft)
 +
      - SICK (Oct 30, part Nov 4, part Nov 6)
 +
  Next two weeks (Nov 11 - Nov 22)
 +
      - MGMT Continue annual appraisals, evaluations; AWP updates
 +
      - ADMIN 12 GeV PRAB paper planning, writing
 +
      - JLEIC Further R&D planning, travel planning for coolign collaboration
 +
      - JACOW IPAC'20 abstract preparation
 +
      - OPS CEBAF restart, BTeam, run and optics support planning
 +
      - VACATION (Nov 11-15)
 +
 
   
 
   
  
Line 130: Line 127:
 
Fanglei Lin
 
Fanglei Lin
  
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)
         - Worked on the storage ring cooler project, and provided a quarterly report
+
         - Worked on the storage ring cooler project, and reported the progress in the storage ring cooler meeting
         - Revisiting electron top-off injection scheme for JLEIC
+
         - Revisited the electron top-off injection scheme for JLEIC
         - Miscellaneous: attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi
+
         - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting,
           with Radiasoft collages, attended JLEIC general meeting, finished employee appraisal.
+
          attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi with Radiasoft
   Next two weeks (Oct 28 - Nov 8)
+
           colleagues, attended JLEIC detector meeting,  
         - Work on updating the interaction region design
+
   Next two weeks (Nov 11 - Nov 22)
 +
         - Evaluate the IR design for various electron energies
 
         - Work on the storage ring cooler project
 
         - Work on the storage ring cooler project
 +
        - Work on teaching material for a USPAS class
 +
  
  
Line 147: Line 147:
 
     Previous two weeks (Oct 14 - Oct 25)
 
     Previous two weeks (Oct 14 - Oct 25)
 
       - Working on longitudinal dynamics and stability in two energy storage ring cooler.
 
       - Working on longitudinal dynamics and stability in two energy storage ring cooler.
       - Working on simulation to get the longer bunch length in the cooling section.
+
       - Working with new lattice. Dr Fanglei Lin has designed new optics for two energy storage ring cooler.
       - Introducing harmonic cavity and bunching cavity in two energy ring to get the longer bunch length in the cooling
+
       - Single and many particles tracking.
        section. Bunching cavity provides the focusing.
+
       - Understanding of bunching cavity phase and the stability based on particle tracking.
       - Results shows that we should go with shorter bunch length ≈ 1 cm.
+
     Next two weeks (Nov 11 - Nov 22)
     Next two weeks (Oct 28 - Nov 8)
+
       - Optimization of parameters in two energy storage ring design.
       - Will  be  working  on  longitudinal  dynamics  and  stability  in two energy storage ring.
+
       - Single and many particles tracking using new lattice.
       - Making clear presentation based on calculation and simulations for future plan.
+
       - Energy spread and bucket height simulation based on bunching cavity voltage.
      - Meeting with Dr Krafft for more discussion.
+
       - Preparing a talk for Nov 22 Friday "High innovative cooler meeting".
       - Should go with chirping and de-chirping along with other scheme in two energy ring.
 
       - Working with new lattice for two energy storage ring.(Dr Fanglei Lin has de-signed the new lattice).
 
  
  
Line 176: Line 174:
 
Amy Sy
 
Amy Sy
  
     Previous two weeks (Oct 14 - Oct 25):
+
     Previous two weeks (Oct 28 - Nov 8):
       - DOE pre-review teleconference for planning for LBNF/DUNE review.
+
       - Participation in the DOE independent project review of LBNF/DUNE. Chaired the subcommittee reviewing the Beamline WBS.
 +
      - Completed final report for LBNF/DUNE review.
 +
      - Continued work on heavy ion stripping chicane design in TRACK, particularly looking at longitudinal dynamics of
 +
        stripped lead ions after traversing a four dipole chicane.
 +
    Next two weeks (Nov 11 - Nov 22)
 +
      - Continued work on linac optimization for reduced transverse emittance.
 
       - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT.
 
       - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT.
       - Continued work on TRACK vs PyORBIT comparison for linac simulations. Compared longitudinal phase behavior at the
+
       - Continued work on TRACK vs PyORBIT comparison for linac simulations.
        transition between QWR and HWR sections in TRACK to the PyORBIT case, and will need to create a JLEIC-specific module
+
       - Preparation of abstracts for IPAC20.
        to properly evaluate this parameter, rather than relying on the SNS linac bunch module that is currently being used.
+
 
        Currently refining the RF cavity parameters in PyORBIT to better match the TRACK simulations, including working with
 
        multiple RF gaps per cavity for better approximation of field maps used in TRACK. 
 
    Next two weeks (Oct 28 - Nov 8)
 
       - Participating in the DOE independent project review of LBNF/DUNE.
 
      - Continued work on ion linac simulations.
 
  
  
Line 198: Line 196:
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Computational Physics - Yves Roblin'''<br>
 
Yves Roblin
 
Yves Roblin
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
 
       - CEBAF:
 
       - CEBAF:
           - RAR reports
+
           - BTEAM meetings  
          - Bteam preparation/meetings
+
           - Preparing and investigating alternate schemes for reduced linac gradients
           - AI meetings
+
           - Schedule and coordination for startup
           - Optics for upcoming run
 
          - RF Pit meeting
 
          - Walking the beam line BSY/HALLA to reconcile with CED
 
          - Group meeting
 
 
       - JLEIC:
 
       - JLEIC:
           - Beam-Beam meetings with Isurumali
+
           - FOA PI meeting at DOE
           - Preparing for PI meeting
+
          - Rescoping of FOA
           - 4th quarter report prep for FOA       
+
          - Meeting with student every week
 +
           - Meeting with CNU prof and jlab operations for use of drones in tunnel (AI)
 +
           - Organizing committee for AI workshop   
 
       - OTHER
 
       - OTHER
           - AWP preparations
+
           - Preparing lecture for SPIN2020 school. Initial gathering  and writing of agenda
          - Evaluations
+
     Next two weeks (Nov 11 - Nov 22)
          - SLLP meetings/prepare for presentation in november
+
       - SLLP training in Chicago
     Next two weeks (Oct 28 - Nov 8)
+
       - Machine startup
       - Complete evaluations
+
 
       - Prepare optics for startup CEBAF
 
      - AI workshop local organizing committee meetings
 
  
  
Line 224: Line 218:
 
Randi Gamage
 
Randi Gamage
  
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Next step of the orbit correction - correcting the beta function distortion  
+
       - Correcting beta distortion (in progress)
       - Investigating different multipole correction schemes.
+
       - Multipole correction  
      - Jlab contribution to the quarterly report
+
     Next two weeks (Nov 11 - Nov 22)
     Next two weeks (Oct 28 - Nov 8)
 
      - Add ion quad data in to DA studies (from last week)
 
 
       - Continue to correct beta function distortion
 
       - Continue to correct beta function distortion
       - Continue to investigate different Multipole corrector schemes  
+
       - Continue different Multipole corrector schemes  
 
 
 
  
  
Line 260: Line 250:
 
Isurumali Neththikumara
 
Isurumali Neththikumara
  
     Previous two weeks ()
+
     Previous two weeks (Oct 28 - Nov 8)
       -  
+
       - Edited the script to output 6-D coordinates of a specific particle.
     Next two weeks ()
+
     Next two weeks (Nov 11 - Nov 22)
       -  
+
       - Calculation of Lyapunov exponent using the data obtained from BB3D simulations.
  
  
Line 270: Line 260:
 
Dennis Turner
 
Dennis Turner
  
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Submitted ATLis for MultiWire testing.
+
       - I was out quite a bit due to having a loved one in the hospital.
       - qsUtility improvements.
+
       - 130keV emittance measurements.
      - Submitted ATLis for 6MeV matching.
+
       - qsUtility tweaks.
      - Completed 130keV emittance measurements.
+
       - Discussion with Chris Tennant about using ML for pathlength prediction.
       - Discussed handing some of my non-CASA software tools back to HLA with Michele.
+
       - Elegant deck for Injector upgrade
       - Discussed future plans for rfHealthCheck with Clyde.
+
       - Modified the elegant 'view3dgeometry' tool to help with building the deck
       - Generated elegant layout for Injector upgrade.
+
       - Attended BTeam and AI lunch meetings.
       - Had a CED workspace created for the Injector upgrade
+
     Next two weeks (Nov 11 - Nov 22)
      - Setup computer with Keras and TensorFlow to start exploring ML.
 
       - Attended BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings.  
 
     Next two weeks (Oct 28 - Nov 8)
 
 
       - Analyze 130keV emittance measurement data.
 
       - Analyze 130keV emittance measurement data.
 +
      - Develop a separate tool for performing ansd analyzing 130keV emittance measurements
 
       - Continue work on assigned sections for the 12GeV PRAB paper.
 
       - Continue work on assigned sections for the 12GeV PRAB paper.
 
       - Configure optics for the Injector upgrade elegant deck.
 
       - Configure optics for the Injector upgrade elegant deck.
Line 289: Line 277:
 
       - Finish QTSnyder upgrade and write ATLis for testing
 
       - Finish QTSnyder upgrade and write ATLis for testing
 
       - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings.  
 
       - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings.  
 +
      - Assist with CEBAF startup as needed.
 +
 
   
 
   
  
Line 297: Line 287:
 
He Zhang
 
He Zhang
  
     Previous two weeks (Oct 14 - Oct 25)     
+
     Previous two weeks (Oct 28 - Nov 8)     
       - JSPEC - Updated the TWISS parameter loading function to improve the flexibility. Now the data column MUX and MUY are
+
       - JSPEC - Our colleague, Dr. Bruker, refactored the Martini model for IBS rate calculation and send a pull request to the
        not required since they are not used in IBS calculation. TWISS parameter tables missing DY nad DPY are acceptable since
+
        github repository. I doublechecked his work and revised slightly mostly for coding style. Inspired by his work, I
         in many cases the ring does not have vertical dispersion. I’m also adding the function of calculation and output the
+
         refactored the Bjorken-Mtingwa model. Since Bruker’s work is on the version before I added the IBS contribution by
        IBS contribution elememt by element to the UI. The other relatively large change in progress is revising the cooling
+
         element feature, I implemented this again after refactoring the IBS formulas.
         rate calculation and the particle model, so that the average cooling rate for varying electron bunch can be used in the
+
       - Other - Prepared a few slides on cooling code development FOA for the DOE PI meeting.
        particle model.  
+
     Next two weeks (Nov 11 - Nov 22)  
       - Beam beam effect - Help Yun Luo to set up and test the simulations using BB3D with high order map tracking or
+
      - Refactor electron cooling rate calculation. Revisit the particle model and the turn-by-turn model. Make sure they work
        symplectic tracking. Find and fixed a bug in the TPSA lib which happens when all the elements are zero in a DA vector
+
        well.
        and caused an error in symplectic tracking using the 2nd kind of generating function.
 
     Next two weeks (Oct 28 - Nov 8)  
 
 
       - Start working on JSPEC benchmarking with Lanzhou experimental data.
 
       - Start working on JSPEC benchmarking with Lanzhou experimental data.
       - Finish a few changes of JSPEC
+
       - Vacation in the second week.
 
 
  
  
Line 362: Line 349:
 
LERF - Steve Benson  
 
LERF - Steve Benson  
 
   
 
   
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Submitted proposal for change of SOW for the Cooling FOA for IMP work
+
       - Finished setting up seminars for November 14, 19, 21, and Dec. 12 ( with a lot of help from Tristan)
       - Prepared quarterly report for Strong Cooling FOA project
+
       - Reviewed paper on Compton gamma ray sources for DOE review.
      - Prepared budget for isotope project quarterly and assist PI in submitting the report.
+
       - Restarted Cooler ring meetings and wrote up summary
       - Prepared and gave talk on LERF Activities at the JLAAC meeting.
+
       - Update Manouchehr Farkhondeh with budget details of SOW change for IMP experiment.
      - Set up seminars by Chris Tennant, Pavel Chevtsov, and Michael Famiano
+
       - Worked on punch list items for the Isotope ERR
       - Discussed non-beam hazards and Lock,Tag&Try issues with Laser Safety personnel.  
+
       - Prepared slides for and attended the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD.  
       - Reviewed Class 3R laser status int he LERF and disabled several unused lasers.
+
     Next two weeks (Nov 11 - Nov 22)
      - Reviewed Isotope program and run plans with Operations Staff
+
      - Submit Test plans for 1G run
       - Prepared AWPs for Cooling FOA project and Isotope production program.
+
      - Review SBIR
     Next two weeks (Oct 28 - Nov 8)
+
      - Review PRAB paper
 +
      - Get kicker coils for RF merge test completed
 
       - Certify User Lab 4 in the LERF
 
       - Certify User Lab 4 in the LERF
 +
      - Complete punch list items for Isotope ERR
 
       - Submit papers for ERL workshop
 
       - Submit papers for ERL workshop
 
       - Assist in run to the 1G dump with CW beam.
 
       - Assist in run to the 1G dump with CW beam.
      - Work on punch list items for the Isotope ERR
+
      - Get kicker coils for RF merge test completed
 
      - Prepare slides for and the attend the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD.
 
  
  
Line 387: Line 374:
 
Andrew Hutton
 
Andrew Hutton
 
   
 
   
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       -     
+
       - Preparing a talk on the history of JLab for the 86th Annual Meeting of the APS Southeastern Section 0n Friday, November
 +
        8, 2019 in Wrightsville Beach, North Carolina.  I had never done a talk like this and it took a lot of reading and
 +
        preparation.  I would be happy to give the talk to the members of CASA to make the effort worth while - there were only
 +
        20 people at the talk at SESAPS!      
 
     Next two weeks (Oct 28 - Nov 8)
 
     Next two weeks (Oct 28 - Nov 8)
       -
+
       - Gearing up for a 1G run with CW beam in LERF as well as finalizing the preparations for our first isotope irradiation.   
 +
        I have a meeting of VNECA in Richmond tomorrow. 
 +
      - I will be having (very) minor outpatient surgery this week so I will be out a fair bit with pre-op and post op

Latest revision as of 12:12, 10 December 2019

Nov 7 2019 Report - Oct 28 - Nov 22 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Oct 28 - Nov 8)
     - ADMIN 12 GeV PRAB paper planning/writing, PRAB paper review
     - ADMIN Calls with BNL colleagues re SSIII scientist applicant
     - MGMT Start annual appraisals, evaluations; AWP updates
     - JLEIC R&D planning, organizing activities post-collaboration meeting
     - JACOW Team meeting preparations, IPAC'20 SPC/3 preparations
     - OPS hall liaison planning and meeting
     - ODU PHYS854 teaching (with Geoff Krafft)
     - SICK (Oct 30, part Nov 4, part Nov 6)
  Next two weeks (Nov 11 - Nov 22)
     - MGMT Continue annual appraisals, evaluations; AWP updates
     - ADMIN 12 GeV PRAB paper planning, writing
     - JLEIC Further R&D planning, travel planning for coolign collaboration
     - JACOW IPAC'20 abstract preparation
     - OPS CEBAF restart, BTeam, run and optics support planning
     - VACATION (Nov 11-15)



Alex Bogacz

  Previous two weeks (Oct 28 - Nov 8) 
     - Alternative lattice for the LHeC ERL
     -	Invention disclosures review
     -	Appraisals
     -	Vac
  Next two weeks (Nov 11 - Nov 22)
     - Vac
     -	SBIR proposal review 
     -	Lattice work for nuSTORM 
     -	Chapter on the LHeC ERL Optics (The LHeC Technical Design Report )




Rui Li

  Previous two weeks (Oct 28 - Nov 8)
     - Prepare and present JLEIC impedance studies at JLEIC R&D meeting
     - Participate multi-lab (LBL/SLAC/APS/NSLS-II) monthly seminar on collective effects in electron storage rings (I'm asked
       to present the next monthly seminar on collective effects in JLEIC)
     - Continue my collaboration with ALS-U and SLAC on impedance and instability
     - Literature study on feedback systems for coupled-bunch instability
     - Discuss with Frank Marhauser and Mark Wiseman on impedance progresses, and plan for the next JLEIC imepedance meeting
  Next two weeks (Nov 8 - Nov 11) 
     - Organize JLEIC impedance meeting on 11/11
     - Finish writing up the technote on spectra for uneven bunch fill
     - Continue my collaboration with ALS-U and SLAC on impedance and instability
     - Continue understanding of the feedback systems for coupled bunch instability
     - Prepare and give presentation on "Collective Effects in Electron-Ion Colliders" for the inter-lab (SLAC/LBL/APS/NSLS-
       II/JLAB) tele-seminar (focused on collective effects) on 11/22




Edy Nissen

   Previous two weeks (Oct 28 - Nov 8)
     - Finished my proposal for the DESIREE experiment and submitted it, I have received confirmation that it is now with the
       review committee
     - Finished the decoupling system in the HEB now that a solenoid has been added
     - Wrote up a tech note about the current design of the HEB
     - Am currently working on a description of the DESIREE experiment and the details gained from it
   Next two weeks (Nov 11 - Nov 22)
     - Extended Medical Leave



Chris Tennant

   Previous two weeks (Oct 28 - Nov 8)
     - Division seminar prep
     -	CEBAF PRAB manuscript work (verifying data with DT Manager)
     -	ML to model CEBAF pathlength (meet with Dennis T)
     -	Autonomous robot meeting
     -	Work with Gunn Tae on magnetized beam modeling
     -	"Problem of the Quarter" for AI Lunch Series
     -	BNL CeC meeting and slide prep for PI meeting in DC
   Next two weeks (Nov 11 - Nov 22)
     - BNL CeC (telecon starting up again)
     - JLEIC CCR (next approach)
     - Fine-tune ML models for SRF fault classifier in anticipation of fall run




Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Oct 14 - Oct 25)
     -  
  Next two weeks (Oct 28 - Nov 8)
     - Attend the Accelerator R&D PI Exchange Meeting


Max Bruker

  Previous (Oct 28 - Nov 8)
     -	Electron cooling theory
     -	Preparation for IMP experiment, travel paperwork
     -	Cool'19 proceedings survey
     -	Learned GPT basics to see if it could substitute CST for magnetized DC beam tracking
           - Precise modeling of equipotential surfaces seems difficult, so the space charge potential is probably inaccurate
           - Seems suitable for simple checks of magnetized optics
  Next (Nov 11 - Nov 22)
     -	Look at data from previous IMP experiment
     -	Become familiar with the deficiencies of the setup



Fanglei Lin

  Previous two weeks (Oct 28 - Nov 8)
       - Worked on the storage ring cooler project, and reported the progress in the storage ring cooler meeting
       - Revisited the electron top-off injection scheme for JLEIC
       - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting,
         attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi with Radiasoft
         colleagues, attended JLEIC detector meeting, 
  Next two weeks (Nov 11 - Nov 22)
       - Evaluate the IR design for various electron energies
       - Work on the storage ring cooler project
       - Work on teaching material for a USPAS class




Bhawin Dhital

   Previous two weeks (Oct 14 - Oct 25)
     - Working on longitudinal dynamics and stability in two energy storage ring cooler.
     - Working with new lattice. Dr Fanglei Lin has designed new optics for two energy storage ring cooler.
     - Single and many particles tracking.
     - Understanding of bunching cavity phase and the stability based on particle tracking.
   Next two weeks (Nov 11 - Nov 22)
     - Optimization of parameters in two energy storage ring design.
     - Single and many particles tracking using new lattice.
     - Energy spread and bucket height simulation based on bunching cavity voltage.
     - Preparing a talk for Nov 22 Friday "High innovative cooler meeting".



Vasiliy Morozov

   Previous two weeks (Oct 14 - Nov 8)
     - Optimization of the IBS rate in the ion collider ring -IR design: modeling of the detector region in GEMC and GEANT4 -Preparation for and attendance of the EIC
       collaboration meeting     
   Next two weeks (Oct 14 - Oct 25)
     - Attending APS DNP meeting
     - Preparation for JLAAC meeting
     - Preparation for EINN meeting




Amy Sy

   Previous two weeks (Oct 28 - Nov 8):
     - Participation in the DOE independent project review of LBNF/DUNE. Chaired the subcommittee reviewing the Beamline WBS. 
     - Completed final report for LBNF/DUNE review.
     - Continued work on heavy ion stripping chicane design in TRACK, particularly looking at longitudinal dynamics of 
       stripped lead ions after traversing a four dipole chicane.
   Next two weeks (Nov 11 - Nov 22)
     - Continued work on linac optimization for reduced transverse emittance.
     - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT.
     - Continued work on TRACK vs PyORBIT comparison for linac simulations.
     - Preparation of abstracts for IPAC20.







Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Oct 28 - Nov 8)
     - CEBAF:
          - BTEAM meetings 
          - Preparing and investigating alternate schemes for reduced linac gradients
          - Schedule and coordination for startup
     - JLEIC:
          - FOA PI meeting at DOE
          - Rescoping of FOA
          - Meeting with student every week
          - Meeting with CNU prof and jlab operations for use of drones in tunnel (AI)
          - Organizing committee for AI workshop     
     - OTHER
          - Preparing lecture for SPIN2020 school. Initial gathering  and writing of agenda
   Next two weeks (Nov 11 - Nov 22)
     - SLLP training in Chicago
     - Machine startup



Randi Gamage

   Previous two weeks (Oct 28 - Nov 8)
     - Correcting beta distortion (in progress) 
     - Multipole correction 
   Next two weeks (Nov 11 - Nov 22)
     - Continue to correct beta function distortion
     - Continue different Multipole corrector schemes 



River Huang

   Previous two weeks (Oct 28 - Nov 8)
     - Transparent Spin Project - We completed the CASA Curve-Fitting python codes based on the least square method. Using our
       CASA Curve-Fitting we can obtain the numerical results of the spin resonance-strength, the spin field directions, the
       phases in spin resonance process, the average spin value and the amplitude Again, OPERA field maps with snakes’
       parallel (the snake currents were varied using a fitting procedure to adjust the snake axis to 0°) has been put into
       RHIC’s lattice. After precisely adjusting the total bending angle of all of the dipole magnets to sum up to 2π, we
       tried to realize the spin transparent in a simulation for the RHIC’s configuration: all of the spin components are 
       constant from turn to turn with a good numerical precision. The four different cases of misalignments was introduced
       into same RHIC lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was
       obtained.
     - CASA Beam-Beam package - For the case β_1x^*≫σ_1x^*,β_2x^*≫σ_2x^*,  the analytical solution of the luminosity was
       derived by us. This new solution has been involved in CASA Beam-Beam package. For JLEIC Parameters and Luminosity
       Performance, we did the benchmarks. The results of our analytical solution and the numerical results are consistent.  
   Next two weeks (Nov 11 - Nov 22)
      - Continue working on EIC project


Isurumali Neththikumara

   Previous two weeks (Oct 28 - Nov 8)
     - Edited the script to output 6-D coordinates of a specific particle.
   Next two weeks (Nov 11 - Nov 22)
     - Calculation of Lyapunov exponent using the data obtained from BB3D simulations.



Dennis Turner

   Previous two weeks (Oct 28 - Nov 8)
     - I was out quite a bit due to having a loved one in the hospital.
     - 130keV emittance measurements.
     - qsUtility tweaks.
     - Discussion with Chris Tennant about using ML for pathlength prediction.
     - Elegant deck for Injector upgrade
     - Modified the elegant 'view3dgeometry' tool to help with building the deck
     - Attended BTeam and AI lunch meetings.
   Next two weeks (Nov 11 - Nov 22)
     - Analyze 130keV emittance measurement data.
     - Develop a separate tool for performing ansd analyzing 130keV emittance measurements
     - Continue work on assigned sections for the 12GeV PRAB paper.
     - Configure optics for the Injector upgrade elegant deck.
     - Start populating the Injector upgrade CED workspace.
     - Continue exploring ML with Keras and TensorFlow.
     - Finish QTSnyder upgrade and write ATLis for testing
     - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings. 
     - Assist with CEBAF startup as needed.




He Zhang

   Previous two weeks (Oct 28 - Nov 8)     
     - JSPEC - Our colleague, Dr. Bruker, refactored the Martini model for IBS rate calculation and send a pull request to the
       github repository. I doublechecked his work and revised slightly mostly for coding style. Inspired by his work, I 
       refactored the Bjorken-Mtingwa model. Since Bruker’s work is on the version before I added the IBS contribution by
       element feature, I implemented this again after refactoring the IBS formulas.  
     - Other - Prepared a few slides on cooling code development FOA for the DOE PI meeting.
   Next two weeks (Nov 11 - Nov 22) 
     - Refactor electron cooling rate calculation. Revisit the particle model and the turn-by-turn model. Make sure they work
       well. 
     - Start working on JSPEC benchmarking with Lanzhou experimental data.
     - Vacation in the second week. 



Diagnostic Development - Kevin Jordan

Kevin Jordan

   Previous two weeks (Oct 28 - Nov 8)
     - 
   Next two weeks (Nov 11 - Nov 22)
     - 



Joe Gubeli

   Previous two weeks (Oct 28 - Nov 8)
     - Isotope Experiment –  Helped with adding diagnostic and connecting them to an EPICS controlled systems. Checked viewers
       needed to run to both the 1G and 1X destinations. Found issues with five of the thirteen viewers and emailed I&C the
       list.
     - Halo monitor – Had several discussions with collaborators and created an ATLis beam test plan.
     - HPWS – Repositioned the HPWS to its nominal operational angle of 45 degrees. Found that in this configuration the full
       travel cannot be reached due to a current limit setting. Increasing this setting can damage the linear motors. Added a
       pneumatic cylinder and an air regulator to the HPWS. Set the regulator to move the stage to the center of travel. With
       this addition the full range of the stage can now be reached. 
       AWP – Completed the AWP for two projects.
   Next two weeks (Nov 11 - Nov 22)
     - Isotope Experiment – Prepare for a two day run to the 1G dump.
     - Halo monitor – Conduct the Halo Monitor experiment in the LERF




Michael Tiefenback

   Previous two weeks ()
     - 
   Next two weeks ()
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Oct 28 - Nov 8)
     - Finished setting up seminars for November 14, 19, 21, and Dec. 12 ( with a lot of help from Tristan)
     - Reviewed paper on Compton gamma ray sources for DOE review.
     - Restarted Cooler ring meetings and wrote up summary
     - Update Manouchehr Farkhondeh with budget details of SOW change for IMP experiment.
     - Worked on punch list items for the Isotope ERR
     - Prepared slides for and attended the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD. 
   Next two weeks (Nov 11 - Nov 22)
     - Submit Test plans for 1G run
     - Review SBIR
     - Review PRAB paper
     - Get kicker coils for RF merge test completed
     - Certify User Lab 4 in the LERF
     - Complete punch list items for Isotope ERR
     - Submit papers for ERL workshop
     - Assist in run to the 1G dump with CW beam.




Andrew Hutton

   Previous two weeks (Oct 28 - Nov 8)
     - Preparing a talk on the history of JLab for the 86th Annual Meeting of the APS Southeastern Section 0n Friday, November
       8, 2019 in Wrightsville Beach, North Carolina.  I had never done a talk like this and it took a lot of reading and
       preparation.  I would be happy to give the talk to the members of CASA to make the effort worth while - there were only
       20 people at the talk at SESAPS!     
   Next two weeks (Oct 28 - Nov 8)
     - Gearing up for a 1G run with CW beam in LERF as well as finalizing the preparations for our first isotope irradiation.     
       I have a meeting of VNECA in Richmond tomorrow.  
     - I will be having (very) minor outpatient surgery this week so I will be out a fair bit with pre-op and post op