'''March 19 2020 Report - Mar 2 - Mar 27'''
+
'''April 2 2020 Report - Mar 16 - Apr 10'''
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
 
'''Todd Satogata'''
 
'''Todd Satogata'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
       - ADMIN 12 GeV PRAB writing/meets, group move planning, PRAB review
+
       -  
      - MGMT AI for NP workshop, prepare for possible Coronavirus MEDCON5
+
   '''Next two weeks (Mar 30 - Apr 10)'''
      - EIC Meetings, BNL work/resource planning, parameter review
+
       -  
      - OPS UITF tour, start CASA involvement; positron beams meet
 
      - OPS CEBAF high current, diagnostics support planning
 
      - OPS KLF discussions, proposal contribution
 
      - ODU/SBIR Prep Sunil Pokharel for Xelera SBIR, grad student review
 
      - IPAC Light peer review assistance (Peter McIntosh)
 
   '''Next two weeks (Mar 16 - Mar 27)'''
 
       - MGMT MEDCON5 information gathering and group communication
 
      - MGMT Strategy meetings (Coronavirus, EIC, ops support/BTeam)
 
      - ADMIN Weekly AI meeting, 12 GeV paper contribution writing
 
      - EIC Weekly JLab strategy meeting, labor resource/FOA planning
 
      - EIC Temple Meeting telecon (Mar 19), strategy telecons (Mar 18)
 
      - EIC BNL Impedance, Magnetized beam SBIR, RCS task force telecons
 
      - OPS BTeam/daily operations telecons, Hall D TAC procedure review
 
      - OPS High intensity run HOM/BBU calculation review/planning
 
      - OPS KLF collaboration proposal review/writing
 
      - VACATION 1/2 day Fri 03/20, 1/2 day Mon 03/23
 
  
  
Line 30: Line 14:
 
'''Alex Bogacz'''
 
'''Alex Bogacz'''
 
    
 
    
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''  
      - Machine support
 
      - Conducting Graduate Student Progress Review
 
      - 'First cut' chicane layout with Cornell’s magnets
 
      - PRAB paper review
 
      - TRC invention disclosure review.
 
  '''Next two weeks (Mar 16 - Mar 27)'''
 
 
       - Second iteration on chicane layout, per input from Chase
 
       - Second iteration on chicane layout, per input from Chase
 
       - SBIR proposal review
 
       - SBIR proposal review
 
       - Paper on neutrino decay ring design
 
       - Paper on neutrino decay ring design
       - Exploring Jupyter Notebook for USPAS course on Practical Lattice Design.
+
       - Jupyter Notebook examples for USPAS course on Practical Lattice Design.  
 +
  '''Next two weeks (Mar 30 - Apr 10)'''
 +
      - Attend Muon Collider Mtg. at CERN 3/31-4/2
 +
      - Multi-pass linac optics for the LHeC ERL
 +
      - Revisiting UITF beam-line optics
 +
      - Exploring Jupyter Notebook examples
 +
 
  
  
Line 48: Line 32:
 
'''Rui Li'''
 
'''Rui Li'''
 
    
 
    
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
       - On Leave
+
       -  
   '''Next two weeks (Mar 16 - Mar 27)'''  
+
   '''Next two weeks (Mar 30 - Apr 10)'''  
       - Work at home
+
       -  
  
  
Line 59: Line 43:
 
'''Edy Nissen'''
 
'''Edy Nissen'''
 
    
 
    
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - I started out working on my ECA application, but decided that I should not pursue that this year.
+
       - Reading through the eRHIC pCDR
       - I've mostly been working on DODGE since then
+
       - The Ghost Team pulled out fo the DODGE project at this point So I switched to working on putting together a simulation
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
       - I will be working both on DODGE, and I have been reading through the eRHIC pCDR.
+
       - I will be working on this simulation package
  
  
Line 70: Line 54:
 
'''Chris Tennant'''
 
'''Chris Tennant'''
 
    
 
    
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Meetings/prep for AI FOA
+
       - Meetings/editing/prep/presentations for AI FOA
       - Meetings/writing/prep for Accelerator Stewardship FOA with CN
+
       - Meetings/writing/editing/begging for letters for Accelerator Stewardship FOA with CNU
     '''Next two weeks (Mar 16 - Mar 27)'''
+
      - Meetings/prep/discussion AI Lunch Series
       - Meetings/writing/prep Accelerator Stewardship FOA (due early April)
+
      - "Attended" several sessions of NVIDIA's GPU Technology Conference
       - Investigating SRF fault data to see if there is sufficient information for AI to make predictions of faults
+
      - Analysis of ML model performance on CEBAF data (prior to MEDCON6)
 +
     '''Next two weeks (Mar 30 - Apr 10)'''
 +
      - Finalize and submit Accelerator Stewardship FOA
 +
       - Meetings/editing/prep/presentations for AI FOA
 +
       - Meetings/editing/prep for LDRD
 +
      - Outline/draft of peer-reviewed paper for SRF Fault Classifier
  
  
Line 86: Line 75:
 
'''Yuhong Zhang'''
 
'''Yuhong Zhang'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
       -  
+
       - Attended many meetings remotely
   '''Next two weeks (Mar 16 - Mar 27)'''
+
      - Worked on luminosity optimization in low CM energy
       -  
+
      - Worked on storage-based cooler and IMP experiment.
 +
   '''Next two weeks (Mar 30 - Apr 10)'''
 +
       - Attended many meetings remotely
 +
      - Worked on luminosity optimization in low CM energy
 +
      - Worked on storage-based cooler and IMP experiment.
 +
 
  
  
Line 95: Line 89:
 
'''Max Bruker'''
 
'''Max Bruker'''
  
   '''Previous (Mar 2 - Mar 13)'''
+
   '''Previous (Mar 16 - Mar 27)'''
       - Reasonable progress on IMP data analysis; discussions about the transverse stuff are still going on while IMP is
+
       - Started writing the PRAB article about the IMP experiment. Some questions are still unresolved, but the quality of the
         understaffed due to Covid
+
         results is starting to look convincing nonetheless.
       - Gave presentation on data analysis at CASA meeting
+
       - Remotely attended the first UITF training session
   '''Next (Mar 16 - Mar 27)'''
+
   '''Next (Mar 30 - Apr 10)'''
       - Start telecommuting on Mar 17
+
       - Continue and hopefully finish my part of the article. There is not much left to do as far as the longitudinal and transverse
       - Write PRAB article
+
        profile data are concerned, but I'd like to understand what happens to the synchrotron frequency. Also, I'm getting the
 +
        impression that nobody quite knows what our objective/conclusion is supposed to be. I hope we'll figure it out along the
 +
        way.
 +
       - Attend more UITF training and hopefully the communication seminar that keeps being postponed.
  
  
Line 109: Line 106:
 
'''Fanglei Lin'''
 
'''Fanglei Lin'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
         - Took one week off due to an illness
+
         - Edited EIC task force on novel techniques for eSR polarization improvement and preparing for the kick-off meeting
 +
        - Worked on the storage ring cooler project
 +
        - Studying the eRHIC design and participated in the discussion with colleagues
 +
        - Miscellaneous: attended the EIC electron polarization meeting, attended the EIC RCS electron polarization meeting,
 +
          attended EIC design team meetings, attended the Storage Ring Cooler meeting, attended the Innovative HE Cooling Project
 +
          Status meeting, attended the EIC JLab RD meeting, attended the EIC general meeting
 +
  '''Next two weeks (Mar 30 - Apr 10)'''
 +
        - Schedule the kick-off meeting and initiate the work on the novel techniques for eSR polarization improvement
 
         - Work on the storage ring cooler project
 
         - Work on the storage ring cooler project
         - Worked on teaching material for the Spin@USPAS class
+
         - Study the eRHIC design
        - Studying eRHIC design and participated in the discussion of EIC task forces
+
 
        - Miscellaneous: attended the Storage Ring Cooler meeting, attended meetings for the Spin@USPAS class, attended the EIC
 
          accelerator design team meeting
 
  '''Next two weeks (Mar 16 - Mar 27)'''
 
        - Work on the storage ring cooler project
 
        - Study eRHIC design and prepare for the contribution to the design of EIC
 
  
  
Line 124: Line 123:
 
'''Bhawin Dhital'''
 
'''Bhawin Dhital'''
 
    
 
    
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Hall C walk-through training and the First Target Operator (TO) shift on March 03 and March 04.
+
       -  
      - Participated in JLab Hack-Athon and AI workshop. March 03 - March 06. Please see attached images.
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - Understanding damping time and IBS time in a two-energy storage ring.
+
       -  
      - On March 08, 2020. I got sick and went to the hospital. I got the flu. Unable to work for a week.
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Calculating damping time and IBS time.
 
      - Go through some references and Slava’s paper on ‘ Electron Cooling for RHIC’.
 
      - Figure out the optimized parameters in a Two-Energy Storage Ring design.
 
      - Canceling all reservation which was made for AccApp20, Now AppAcc20 is officially canceled.
 
      - Regular group meeting on Two-Energy Storage Ring via BlueJeans (First was on March 20, 2020 at 2:30 PM)
 
  
 
<br>
 
<br>
 
'''Vasiliy Morozov'''
 
'''Vasiliy Morozov'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Work on detector solenoid compensation: teleconference with collaborators and study of closed orbit correction schemes
+
       -  
      - Preparation of a PRAB paper on the transparent spin response function
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - Participation in planning of collaboration with BNL
+
       -  
      - Spin tracking simulations
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Participation in the YR workshop
 
      - Work on detector solenoid compensation
 
      - Preparation of a PRAB paper on the transparent spin response function
 
      - Spin tracking simulations
 
      - Two-energy storage ring cooler
 
      - Crabbing calculations
 
      - Beam-beam calculations
 
  
  
Line 159: Line 142:
 
'''Amy Sy'''
 
'''Amy Sy'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
      - Participation in the AI for Nuclear Physics Workshop.
 
      - Literature search on electron and proton EDM experiment concepts.
 
      - H- intrabeam stripping estimate in JLEIC ion linac using PyORBIT. First pass at calculating the fractional beam loss as a
 
        function of linac length, as well as the estimated power loss along the linac.
 
    '''Next two weeks (Mar 16 - Mar 27)'''
 
 
       - Continued work on the H- intrabeam stripping estimates. Conversion of TRACK output for comparison with PyORBIT estimates.  
 
       - Continued work on the H- intrabeam stripping estimates. Conversion of TRACK output for comparison with PyORBIT estimates.  
         Writing up the results for a future conference paper.
+
         Both PyORBIT and TRACK outputs indicate that the loss rate due to H- intrabeam stripping in the JLEIC ion linac a couple of
       - Continued literature search on proton and electron EDM experiments.
+
        orders of magnitude higher than that in the SNS superconducting linac. This results in integrated power loss of about the
 +
        same order, even though the beam power in the JLEIC linac is much lower. Working on checking the calculations because this
 +
        seems high, but the power loss rate is still lower than the threshold for which intrabeam stripping losses is considered to
 +
        be dangerous.
 +
       - Calculation of RF voltages in IMP bunched beam cooling experiment based on synchrotron sideband data.
 
       - Literature search to better understand the polarized proton and 3He linacs at RHIC/BNL EIC.
 
       - Literature search to better understand the polarized proton and 3He linacs at RHIC/BNL EIC.
 +
      - Attended first session of UITF Operator Training. This was a ~2 hour presentation on facility layout, unique hazards
 +
        associated with UITF, some shutdown procedures, etc.
 +
    '''Next two weeks (Mar 30 - Apr 10)'''
 +
      - Continued work on the H- intrabeam stripping estimates.
 +
      - Continued literature search on proton/electron EDM concepts.
 +
      - Sorting through the latest updates on EIC working groups and figuring out a workflow to manage future updates for the
 +
        forthcoming EIC design update newsletter.
 +
  
  
Line 179: Line 169:
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Yves Roblin'''
 
'''Yves Roblin'''
     Previous two weeks (Mar 2 - Mar 13)
+
     Previous two weeks (Mar 16 - Mar 27)
       - CASA Beam-Beam package
+
       - Writing section for 12GeV paper
       - Using the conjugate gradient method and writing in Python, we added the two-dimension Poisson Equation solver to CASA
+
      - Gathering list of M56 measurements for analysis
        Beam-Beam package.
+
       - Working on beam loss in CEBAF
     Next two weeks (Mar 16 - Mar 27)
+
      - Reviewing longitudinal match strategies for CEBAF
       - Continue working on revising CASA Beam-Beam package.
+
      - Beam prep and meetings
 +
      - Beam-beam meetings with isurumali
 +
      - Online class on machine learning with python
 +
      - AI meetings for FOA prep.
 +
     Next two weeks (Mar 30 - Apr 10)
 +
       - Cebaf ER , reviewing lattice and scripts, documenting for Peter and Gus.
 +
      - Developing restart for strategy for CEBAF
 +
      - More online learning /python machine learning/data mining
 +
      - Beam-beam FOA, start studying effect of damping in eRHIC by comparing tracked result with bb3d result and results from
 +
        Y. Hao's code
 +
      - AI meetings.
 +
 
  
  
Line 191: Line 192:
 
'''Randi Gamage'''
 
'''Randi Gamage'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
 
  
  
Line 201: Line 201:
 
'''River Huang'''
 
'''River Huang'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       - CASA Beam-Beam package -  
 
       - CASA Beam-Beam package -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 210: Line 210:
 
'''Isurumali Neththikumara'''
 
'''Isurumali Neththikumara'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 221: Line 221:
 
'''Dennis Turner'''
 
'''Dennis Turner'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - '''AIPINJ'''
+
      - Optics on-call
         - New layout; close to finalized.  Updated elegant decks.
+
       - '''AIPINJ'''Yet another layout change
        - Rematched new layout for various Wien configurations and provided QW and solenoid setpoints.
+
         - New QW and solenoid setpoints for wien configurations wrt new layout
         - Simulated harp emittance measurements to verify it will work with the latest layout.
+
         - Harp and 0I07 solenoid moved; simulated emittance measurement to verify it still works
         - Prepared slides regarding optics to present to AIPINJ meeting.  
+
         - Searched drawings database to verify magnet lengths for the new deck for the upcoming 130keV run.  
 
       - '''HLA'''
 
       - '''HLA'''
         - Tweaks to qsUtility.
+
         - qsUtility tweaks
         - Reviewed rayTrace code and began code cleanup and streamlining.
+
         - rayTrace  
       - Attended AI for NP conference.
+
       - '''AI'''
       - Attended BTeam, CASA, AIPINJ, AI Lunch, and 12GeV PRAB meetings.
+
          - Wrote draft outline for RF instability detection proposal
     '''Next two weeks (Mar 16 - Mar 27)'''
+
          - Collected more archive data for RF instability detection
      - Optics On-Call
+
          - Searched for papers on the old RF Distributed DAQ project
 +
      - Read papers and technotes on longitudinal injector optics, wien filters, etc.
 +
       - Attended BTeam, Accelerator AI, AI Lunch, CASA, AIPINJ, 0800 meetings
 +
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       - '''AIPINJ'''
 
       - '''AIPINJ'''
         - Build a deck for the run after the summer shutdown.  We will be running 130keV with the new beamline up to the chopper, and
+
         - Expect the beamline layout up to the Chopper to be finalized; finalize optics with Alicia
          existing beamline downstream.
+
        - Get deck ready for 130keV run (new beamline up to Chopper, existing beamline from Chopper to Quarter)]
        - Present optics slides to AIPINJ meeting.
+
            - Optics match for various Wien configurations
 +
            - Get the deck into CED
 
       - '''HLA'''
 
       - '''HLA'''
         - Continue with rayTrace.
+
         - rayTrace
 
       - '''AI'''
 
       - '''AI'''
         - Provide detailed outline of RF cavity instability detection idea for upcoming funding proposal.
+
         - Continue collecting RF data
         - Experiment with using Keras/TensorFlow on archived RF cavity data to learn hands-on.
+
         - Continue learning Keras, etc
      - Attend BTeam, 12GeV PRAB, AI Lunch, Accelerator AI, AIPINJ, CASA, 0800 meetings.
+
      - '''UITF'''
      - Remain socially distant.
+
        - Study Alex's Optim deck, convert to elegant
 +
        - Attend BTeam, CASA, AIPINJ, AI Lunch, Accelerator AI meetings
  
  
Line 251: Line 256:
 
'''He Zhang'''
 
'''He Zhang'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''     
+
     '''Previous two weeks (Mar 16 - Mar 27)'''     
       - Finished the UI of the new JSPEC code. Finished testing features in most scenarios. The new codes have been released in a new
+
       - New model added to JSPEC, which allows to use multiple electron bunches to cool one ion bunch. The electron bunches are
         github repository. A few small new features added. Examples with results are added to the erpository. Documents has been updated.  
+
        assumed identical but placed at different positions. Kick due to the raising/falloing edge of a cylindrical electron bunch
     '''Next two weeks (Mar 16 - Mar 27)'''  
+
         is added into the turn-by-turn model.  
       - Add cooling mode of using multiple electron bunches to cool one long ion bunch.
+
      - Did some calculation/simulations on eRHIC low energy cooling.  
      - Add mode of the edging effect of the electron bunch.  
+
     '''Next two weeks (Mar 30 - Apr 10)'''  
       - Continue document the code.  
+
       - Non-magnetic friction force formula to JSPEC. Heating effect to JSPEC.  
       - Perform simulation on IMP experiment
+
       - Keep documenting JSPEC.  
 +
       - Perform simulation on IMP experiment if data is available.
 +
 
  
 
   
 
   
 
    
 
    
 
 
  
 
----
 
----
Line 270: Line 275:
 
'''Kevin Jordan'''
 
'''Kevin Jordan'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
   '''Next two weeks (Mar 16 - Mar 27)'''
+
   '''Next two weeks (Mar 30 - Apr 10)'''
 
       -   
 
       -   
  
Line 280: Line 285:
 
'''Joe Gubeli'''
 
'''Joe Gubeli'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - '''Isotope Experiment –''' Spent a large portion of the last two weeks on this project. Started with support of the 1kW run which
+
       - '''Isotope Experiment –'''Ran several thermal analysis of both the solid hBN and graphite blocks using a FLUKA power distribution
        had to be terminated early to investigate the solid hBN target that developed a crack. We had discussions on the cause of the
+
         from Keith W. The analysis results showed that graphite is by far a much better material to use to from a thermal as well as
         crack as well as a path forward. Going forward we decided to investigate the use of graphite over hBN due to its better thermal  
+
         electrical standpoint. The thermal distribution additionally showed that the side cooling plates need to be extended. Ran
         and electrical conductivity. I performed some analytical energy loss and absorbed power calculations on the window, radiator and
+
         five additional analysis of a gallium filled graphite crucible at both 1kW and 5kW with various thermal contact resistances.  
         target. Three targets were analyzed, solid hBN, solid graphite and gallium filled graphite. Using these numbers I ran a number of
+
         These analysis used FLUKA power distributions as inputs. Unfortunately the geometry used in the FLUKA simulations were
         simulations of these three cases plus a few more using different material properties. I made a presentation of the results.
+
        incorrect and the both the FLUKA and my thermal analysis will need to be redone. I sent the correct geometry to Keith W.  
       - '''Halo monitor –''' – The missing $27k received by JLab. We are working on creating an account code for these funds
+
       - '''Halo monitor –''' A new CRADA was sent to Radiabeam for signatures.
       - '''ARDDOT –''' Started investigating a new design for SLM1A09 to place the camera over the dipole. The idea is to use the dipole
+
       - '''ARDDOT –'''Completed the initial mechanical design of a new SLM for 1A09. This design will be loaded into ZEMAX for  
         steel as additional radiation protection.  
+
         verification of the correct optical design.  
       - '''HPWS -''' I created an analytical as well as a sequential Zemax simulation of the optics use to image the wire as well as
+
       - '''HPWS -'''A NCE contract was sent to Radiabeam for signatures that will move the end date of the CRADA to September 30th due to
         collect photons into a photodiode.
+
         the CODVID-19 telework.  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
       - '''HPWS –''' Design a test setup to pulse a diode laser that simulates the electron beam. This will allow us
+
       - '''ARDDOT –'''Verify the optics of the new SLM1A09 mechanical design using a non-sequential Zemax model.  
        to test the scanner’s acquisition in pulsed mode.
+
       - '''Isotope Experiment -'''Use the corrected geometry FLUKA results of the absorbed power as well as a new raft side plate design
      - '''ARDDOT –''' Build first a sequential Zemax model of the new SLM1A09 optics then move to a non-sequential Zemax model. After
+
        to create several thermal analysis of the gallium filled graphite crucible. Work with Kevin J. on a the extended side plate
        completion of the Zemax models create a solid model and then prepare a presentation for review.
+
        design.  
       - '''Isotope Experiment -''' Support 1kW run.
 
  
  
Line 304: Line 308:
 
'''Michael Tiefenback'''
 
'''Michael Tiefenback'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 315: Line 319:
 
'''LERF - Steve Benson'''  
 
'''LERF - Steve Benson'''  
 
   
 
   
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Assisted in isotope commissioning run the week of March 9. Will have to redo due to target damage.
+
       - Got RF merger coils shipped to Argonne
      - Hosted seminar by Ying Wu.
+
       - Set up home office and hoped shut down the LERF safely
      - Sent Straight merger coils to ANL
+
       - Tracked down replacement for failed Ortec high voltage power supply
       - Certified User Lab 4 for laser operation
+
       - Started Low Energy Cooling meeting series with Brookhaven
       - Signed off on TOSP for laser testing in User Lab 4
+
       - Helped set up simulations of EIC cooling
       - Worked with Operations liaison to revise turn-on procedures for the LERF
+
       - Reviewed Optics Communications paper
       - Continued to review the new LERF Operations Directive
+
       - Reviewed latest version  the new LERF Operations Directive
      - Completed report for CBETA close-out revie
+
      - Documented changes in the Roles and Responsibilities for the LOD for comparison between versions
    '''Next two weeks (Mar 16 - Mar 27)'''
 
      - Set up simulations of EIC cooling
 
       - Review Optics Communications paper
 
       - Finalize the new LERF Operations Directive
 
 
       - Organize studies for low energy cooling on eRHIC
 
       - Organize studies for low energy cooling on eRHIC
 +
      - Set up home monitoring of LERF vacuums and coordinated with Frank Humphrey to keep them under control.
 +
    '''Next two weeks (Mar 30 - Apr 10)'''
 +
      - Help to organize tutorial seminars for Accelerator Division
 +
      - Derive new schedule and budget for Isotope exposure runs
 +
      - Review LERF start-up procedures
 +
      - Continue to develop Low Energy Cooling plan for EIC
 +
      - Work on finding replacement for me on Seminar Committee.
 +
  
 
   
 
   
Line 336: Line 344:
 
'''Andrew Hutton'''
 
'''Andrew Hutton'''
 
   
 
   
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - I visited Jamal at VCU to find out more information on the hot cell we need for Isotope separationJamal has been
+
       - The last two weeks have been spent trying to get used to working from homeI think I am getting there! 
        shut down by their Radiation Officer until the hot-cell has been relocated. The future location has been secured. However,
+
      - For the EIC, I attended two meetings of the RF team, I wasn’t much useI did spend a fair amount of time to look into the
        with the coronavirus, I do not expect any rapid resolution of the problem.   
+
        idea of reducing the vertical emittance in the EIC proton ring, either by emittance exchange or coupling.  For the emittance
      - We carried out our first irradiation in the hutch, unfortunately fracturing a solid block of boron nitride used for setting
+
         exchange,I am now certain that the “traditional” method of transverse-longitudinal coupling will not work for 25 GeV
         up CW beam (I have described this in detail in other correspondence, I will not belabor it here).  The Isotope team is
+
         protons. I do believe that a transverse emittance re-distribution might be possible, either in the transfer line or in the  
         preparing for a supplemental ERR as we are considering changing the crucible to graphite.  A suitable graphite grade has
+
         Yellow Ring. Of these, the transfer line would be best.  I also think we could look into slow extraction from the AGS
         been identified and a dozen blocks ordered (Kevin). We all received measurements of the residual metallic impurities, which
+
         followed by horizontal stacking in the Yellow Ring.   
        are being looked at by RadCon for completeness (Keith)The NMT students are on Spring Break and have ramped up thermal
+
       - For the Isotope Program, I have been involved in suggesting directions for calculations which are proceeding well (Joe
        simulations, which are being compared to our simulations (Joe).
+
         Gubeli and Keith Welch, aided and abetted by the NMT students). I have prepared a new set of milestones and sent it round
      - I participated in a VNECA meeting, which was unusually interesting as we are trying to address the major changes in
+
         for comment - so far it is an anechoic chamber out there! I also sent around information on the upcoming FOAs and got a
         energy policy enacted by the Virginia legislature (again, I reported on this in a separate report).   
+
         positive response from Jamal at VCU, but Doug Wells has been offline for weeks. I suspect he has been dragged into
       - I completed my HPI training.  Overall, I was not impressed, the trainer spent too much time pointing out mistakes made at
+
        organizing teaching online, a massive task!  
         Jefferson lab in the past (totally against the principles of HPI).
+
       - I attended a videoconference on PERLE which is starting up again.  I wrote up a brief report fro upper management, with
      - I attended a meeting of the EIC RF group discussing HOM losses in the electron ring SRF cavities, but did not contribute
+
         positive response from Andrei.   
         much. Bob and Frank know way more than I ever will. I have also interacted with Vasiliy and Yuhong on increasing the  
+
       - The ALCC is now considering writing a short White Paper to submit to the Snowmass meeting November 4-6, 2020 in Fermilab. I
         luminosity in the medium energy region.   
+
        will probably get involved editing that.   
       - I provided advice to Alex and Deborah about the Awards and Prizes Committee which I initiated, was not maintained, and which
+
     '''Next two weeks (Mar 30 - Apr 10)
         Alex is now willing to take on.  I stressed that this initiative will only work if Stuart mandates the team.   
+
       - Continue with EIC work, hopefully collaborating more closely with Dave Douglas.   
       - My week ended with a request to self-isolate until further notice.   
+
       - I will need to finalize the Isotope Milestones and send them to Ethan Balkin. I also need to write the Isotope Quarterly
     '''Next two weeks (Mar 16 - Mar 27)
+
        Report, due around April 24.
       - I am now working from home, for which I am well equipped.   
 
       - I will be following up on the isotope preparations.
 
      - I will work through the luminosity parameters in the eRHIC pCDR and have already found some errors.
 

Latest revision as of 09:43, 6 April 2020

April 2 2020 Report - Mar 16 - Apr 10 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10)
     - 



Alex Bogacz

  Previous two weeks (Mar 16 - Mar 27) 
     - Second iteration on chicane layout, per input from Chase
     -	SBIR proposal review
     -	Paper on neutrino decay ring design
     -	Jupyter Notebook examples for USPAS course on Practical Lattice Design. 
  Next two weeks (Mar 30 - Apr 10)
     - Attend Muon Collider Mtg. at CERN 3/31-4/2
     -	Multi-pass linac optics for the LHeC ERL
     -	Revisiting UITF beam-line optics 
     -	Exploring Jupyter Notebook examples




Rui Li

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10) 
     - 



Edy Nissen

   Previous two weeks (Mar 16 - Mar 27)
     - Reading through the eRHIC pCDR
     - The Ghost Team pulled out fo the DODGE project at this point So I switched to working on putting together a simulation
   Next two weeks (Mar 30 - Apr 10)
     - I will be working on this simulation package



Chris Tennant

   Previous two weeks (Mar 16 - Mar 27)
     - Meetings/editing/prep/presentations for AI FOA
     - Meetings/writing/editing/begging for letters for Accelerator Stewardship FOA with CNU
     - Meetings/prep/discussion AI Lunch Series
     - "Attended" several sessions of NVIDIA's GPU Technology Conference
     - Analysis of ML model performance on CEBAF data (prior to MEDCON6)
   Next two weeks (Mar 30 - Apr 10)
     - Finalize and submit Accelerator Stewardship FOA
     - Meetings/editing/prep/presentations for AI FOA
     - Meetings/editing/prep for LDRD
     - Outline/draft of peer-reviewed paper for SRF Fault Classifier




Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Mar 16 - Mar 27)
     - Attended many meetings remotely
     -	Worked on luminosity optimization in low CM energy
     -	Worked on storage-based cooler and IMP experiment. 
  Next two weeks (Mar 30 - Apr 10)
     - Attended many meetings remotely
     -	Worked on luminosity optimization in low CM energy
     -	Worked on storage-based cooler and IMP experiment.



Max Bruker

  Previous (Mar 16 - Mar 27)
     - Started writing the PRAB article about the IMP experiment. Some questions are still unresolved, but the quality of the 
       results is starting to look convincing nonetheless.
     -	Remotely attended the first UITF training session
  Next (Mar 30 - Apr 10)
     - Continue and hopefully finish my part of the article. There is not much left to do as far as the longitudinal and transverse 
       profile data are concerned, but I'd like to understand what happens to the synchrotron frequency. Also, I'm getting the 
       impression that nobody quite knows what our objective/conclusion is supposed to be. I hope we'll figure it out along the 
       way.
     -	Attend more UITF training and hopefully the communication seminar that keeps being postponed.



Fanglei Lin

  Previous two weeks (Mar 16 - Mar 27)
       - Edited EIC task force on novel techniques for eSR polarization improvement and preparing for the kick-off meeting
       - Worked on the storage ring cooler project
       - Studying the eRHIC design and participated in the discussion with colleagues 
       - Miscellaneous: attended the EIC electron polarization meeting, attended the EIC RCS electron polarization meeting, 
         attended EIC design team meetings, attended the Storage Ring Cooler meeting, attended the Innovative HE Cooling Project 
         Status meeting, attended the EIC JLab RD meeting, attended the EIC general meeting
  Next two weeks (Mar 30 - Apr 10)
       - Schedule the kick-off meeting and initiate the work on the novel techniques for eSR polarization improvement
       - Work on the storage ring cooler project
       - Study the eRHIC design



Bhawin Dhital

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 


Vasiliy Morozov

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 




Amy Sy

   Previous two weeks (Mar 16 - Mar 27)
     - Continued work on the H- intrabeam stripping estimates. Conversion of TRACK output for comparison with PyORBIT estimates. 
       Both PyORBIT and TRACK outputs indicate that the loss rate due to H- intrabeam stripping in the JLEIC ion linac a couple of 
       orders of magnitude higher than that in the SNS superconducting linac. This results in integrated power loss of about the 
       same order, even though the beam power in the JLEIC linac is much lower. Working on checking the calculations because this 
       seems high, but the power loss rate is still lower than the threshold for which intrabeam stripping losses is considered to 
       be dangerous.
     - Calculation of RF voltages in IMP bunched beam cooling experiment based on synchrotron sideband data.
     - Literature search to better understand the polarized proton and 3He linacs at RHIC/BNL EIC.
     - Attended first session of UITF Operator Training. This was a ~2 hour presentation on facility layout, unique hazards 
       associated with UITF, some shutdown procedures, etc. 
   Next two weeks (Mar 30 - Apr 10)
     - Continued work on the H- intrabeam stripping estimates. 
     - Continued literature search on proton/electron EDM concepts.
     - Sorting through the latest updates on EIC working groups and figuring out a workflow to manage future updates for the 
       forthcoming EIC design update newsletter.






Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Mar 16 - Mar 27)
     - Writing section for 12GeV paper
     - Gathering list of M56 measurements for analysis 
     - Working on beam loss in CEBAF
     - Reviewing longitudinal match strategies for CEBAF
     - Beam prep and meetings
     - Beam-beam meetings with isurumali
     - Online class on machine learning with python
     - AI meetings for FOA prep.
   Next two weeks (Mar 30 - Apr 10)
     - Cebaf ER , reviewing lattice and scripts, documenting for Peter and Gus.
     - Developing restart for strategy for CEBAF
     - More online learning /python machine learning/data mining
     - Beam-beam FOA, start studying effect of damping in eRHIC by comparing tracked result with bb3d result and results from 
       Y. Hao's code
     - AI meetings.




Randi Gamage

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 


River Huang

   Previous two weeks (Mar 16 - Mar 27)
     - CASA Beam-Beam package - 
   Next two weeks (Mar 30 - Apr 10)
     - 


Isurumali Neththikumara

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



Dennis Turner

   Previous two weeks (Mar 16 - Mar 27)
     - Optics on-call
     - AIPINJYet another layout change
        - New QW and solenoid setpoints for wien configurations wrt new layout
        - Harp and 0I07 solenoid moved; simulated emittance measurement to verify it still works
        - Searched drawings database to verify magnet lengths for the new deck for the upcoming 130keV run. 
     - HLA
        - qsUtility tweaks
        - rayTrace 
     - AI
         - Wrote draft outline for RF instability detection proposal
         - Collected more archive data for RF instability detection
         - Searched for papers on the old RF Distributed DAQ project
     - Read papers and technotes on longitudinal injector optics, wien filters, etc.
     - Attended BTeam, Accelerator AI, AI Lunch, CASA, AIPINJ, 0800 meetings
   Next two weeks (Mar 30 - Apr 10)
     - AIPINJ
        - Expect the beamline layout up to the Chopper to be finalized; finalize optics with Alicia
        - Get deck ready for 130keV run (new beamline up to Chopper, existing beamline from Chopper to Quarter)]
           - Optics match for various Wien configurations
           - Get the deck into CED
     - HLA
        - rayTrace
     - AI
        - Continue collecting RF data
        - Continue learning Keras, etc
     - UITF
        - Study Alex's Optim deck, convert to elegant
        - Attend BTeam, CASA, AIPINJ, AI Lunch, Accelerator AI meetings



He Zhang

   Previous two weeks (Mar 16 - Mar 27)     
     - New model added to JSPEC, which allows to use multiple electron bunches to cool one ion bunch. The electron bunches are 
       assumed identical but placed at different positions. Kick due to the raising/falloing edge of a cylindrical electron bunch 
       is added into the turn-by-turn model. 
     - Did some calculation/simulations on eRHIC low energy cooling. 
   Next two weeks (Mar 30 - Apr 10) 
     - Non-magnetic friction force formula to JSPEC. Heating effect to JSPEC. 
     - Keep documenting JSPEC. 
     - Perform simulation on IMP experiment if data is available. 




Diagnostic Development - Kevin Jordan

Kevin Jordan

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10)
     -  



Joe Gubeli

   Previous two weeks (Mar 16 - Mar 27)
     - Isotope Experiment –Ran several thermal analysis of both the solid hBN and graphite blocks using a FLUKA power distribution
       from Keith W. The analysis results showed that graphite is by far a much better material to use to from a thermal as well as 
       electrical standpoint. The thermal distribution additionally showed that the side cooling plates need to be extended. Ran 
       five additional analysis of a gallium filled graphite crucible at both 1kW and 5kW with various thermal contact resistances. 
       These analysis used FLUKA power distributions as inputs. Unfortunately the geometry used in the FLUKA simulations were 
       incorrect and the both the FLUKA and my thermal analysis will need to be redone. I sent the correct geometry to Keith W. 
     - Halo monitor – A new CRADA was sent to Radiabeam for signatures.
     - ARDDOT –Completed the initial mechanical design of a new SLM for 1A09. This design will be loaded into ZEMAX for 
       verification of the correct optical design.   
     - HPWS -A NCE contract was sent to Radiabeam for signatures that will move the end date of the CRADA to September 30th due to
       the CODVID-19 telework. 
   Next two weeks (Mar 30 - Apr 10)
     - ARDDOT –Verify the optics of the new SLM1A09 mechanical design using a non-sequential Zemax model. 
     - Isotope Experiment -Use the corrected geometry FLUKA results of the absorbed power as well as a new raft side plate design 
       to create several thermal analysis of the gallium filled graphite crucible. Work with Kevin J. on a the extended side plate
       design. 



Michael Tiefenback

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Mar 16 - Mar 27)
     - Got RF merger coils shipped to Argonne
     - Set up home office and hoped shut down the LERF safely
     - Tracked down replacement for failed Ortec high voltage power supply
     - Started Low Energy Cooling meeting series with Brookhaven
     - Helped set up simulations of EIC cooling
     - Reviewed Optics Communications paper
     - Reviewed latest version  the new LERF Operations Directive
     - Documented changes in the Roles and Responsibilities for the LOD for comparison between versions
     - Organize studies for low energy cooling on eRHIC
     - Set up home monitoring of LERF vacuums and coordinated with Frank Humphrey to keep them under control.
   Next two weeks (Mar 30 - Apr 10)
     - Help to organize tutorial seminars for Accelerator Division
     - Derive new schedule and budget for Isotope exposure runs
     - Review LERF start-up procedures
     - Continue to develop Low Energy Cooling plan for EIC
     - Work on finding replacement for me on Seminar Committee.



Andrew Hutton

   Previous two weeks (Mar 16 - Mar 27)
     - The last two weeks have been spent trying to get used to working from home.  I think I am getting there!  
     - For the EIC, I attended two meetings of the RF team, I wasn’t much use.  I did spend a fair amount of time to look into the 
       idea of reducing the vertical emittance in the EIC proton ring, either by emittance exchange or coupling.  For the emittance
       exchange,I am now certain that the “traditional” method of transverse-longitudinal coupling will not work for 25 GeV 
       protons. I do believe that a transverse emittance re-distribution might be possible, either in the transfer line or in the 
       Yellow Ring. Of these, the transfer line would be best.  I also think we could look into slow extraction from the AGS 
       followed by horizontal stacking in the Yellow Ring.  
     - For the Isotope Program, I have been involved in suggesting directions for calculations which are proceeding well (Joe 
       Gubeli and Keith Welch, aided and abetted by the NMT students). I have prepared a new set of milestones and sent it round 
       for comment - so far it is an anechoic chamber out there!  I also sent around information on the upcoming FOAs and got a 
       positive response from Jamal at VCU, but Doug Wells has been offline for weeks.  I suspect he has been dragged into 
       organizing teaching online, a massive task!  
     - I attended a videoconference on PERLE which is starting up again.  I wrote up a brief report fro upper management, with 
       positive response from Andrei.  
     - The ALCC is now considering writing a short White Paper to submit to the Snowmass meeting November 4-6, 2020 in Fermilab. I 
       will probably get involved editing that.  
   Next two weeks (Mar 30 - Apr 10)
     - Continue with EIC work, hopefully collaborating more closely with Dave Douglas.  
     - I will need to finalize the Isotope Milestones and send them to Ethan Balkin. I also need to write the Isotope Quarterly 
       Report, due around April 24.