Difference between revisions of "2021-5-27-LeadershipReports"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
'''Todd Satogata''' | '''Todd Satogata''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | - | + | - |
− | + | '''Next two weeks (May 24 - June 4)''' | |
− | + | - | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | '''Next two weeks ( | ||
− | - | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 35: | Line 17: | ||
'''Alex Bogacz''' | '''Alex Bogacz''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | - Present talk on | + | - Present talk on ‘ RF issues of Low Energy Muon Acceleration’ at 1-st Muon Collider Community mtg. |
− | - | + | - ERL Roadmap Panel - writeup on ‘The Art of Arcs’ |
− | - White Paper on future CEBAF - writeup on | + | - White Paper on future CEBAF - writeup on ‘FFA Energy Doubling’ |
− | - | + | - Bisected linac optics (one-on-one with Ryan) |
− | - | + | - Presenting a talk on ‘CEBAF FFA energy doubling’ at Hall C collaboration mtg. |
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
− | - | + | - Attending IPAC’21 |
− | - | + | - Summer Students lecture on ‘Introduction to Accelerators ’ |
− | - ERL Roadmap Panel - writeup on | + | - ERL Roadmap Panel - writeup on ‘the LHeC ERL’ |
− | - FFA@CEBAF multi-pass linac | + | - Mentoring a SULI student |
− | + | - FFA@CEBAF multi-pass linac optics | |
+ | |||
Line 69: | Line 52: | ||
- Gave input into Andrew’s LDRD proposal as well. | - Gave input into Andrew’s LDRD proposal as well. | ||
- ILC meeting with Andrei and Todd | - ILC meeting with Andrei and Todd | ||
− | '''Next two weeks (May 24 June 4)''' | + | '''Next two weeks (May 24 - June 4)''' |
- IPAC21 attendance | - IPAC21 attendance | ||
- LDRD Proposal work – will submit on May 28th | - LDRD Proposal work – will submit on May 28th | ||
Line 82: | Line 65: | ||
'''Rui Li''' | '''Rui Li''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 21 - June 4)''' |
- | - | ||
Line 95: | Line 78: | ||
'''Edy Nissen''' | '''Edy Nissen''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | - | + | - Created posters for IPAC |
− | - | + | - Created slides for IPAC talk |
− | - | + | - Recorded IPAC talk and poster videos |
− | - | + | - Completed IPAC proceedings papers |
− | '''Next two weeks ( | + | - Wrote SAD update talk for GlueX meeting |
− | - | + | '''Next two weeks (May 24 - June 4)''' |
− | + | - Attended IPAC with 1 contributed talk and 2 posters | |
− | - | + | - Gave SAD update talk at GlueX meeting |
− | - | + | - I will be taking some time off next week |
Line 116: | Line 99: | ||
'''Chris Tennant''' | '''Chris Tennant''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
- | - | ||
Line 133: | Line 116: | ||
'''Yuhong Zhang''' | '''Yuhong Zhang''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
- | - | ||
Line 157: | Line 140: | ||
'''Bhawin Dhital''' | '''Bhawin Dhital''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | - | + | - Completed papers preparations for IPAC'21. Two papers submitted for publications. |
− | - I was working with | + | - Completed videos uploads for a contributed talk and for a poster presentations at IPAC'21. |
− | + | - I was working on new lattice with isochronous arc. | |
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
− | - I will | + | - I will participate at IPAC'21 virtual conference starting 05/24/2021 and ends at 05/28/2021. |
− | - I will be working | + | - I will be working with new dual energy ring and parameters calculation. |
− | |||
− | |||
Line 202: | Line 183: | ||
'''Computational Physics - Yves Roblin'''<br> | '''Computational Physics - Yves Roblin'''<br> | ||
'''Yves Roblin''' | '''Yves Roblin''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | - | + | - |
− | + | Next two weeks (May 24 - June 4) | |
− | + | - | |
− | |||
− | |||
− | |||
− | Next two weeks ( | ||
− | - | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 228: | Line 198: | ||
'''Randi Gamage''' | '''Randi Gamage''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
- | - | ||
Line 237: | Line 207: | ||
'''River Huang''' | '''River Huang''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | - | + | - |
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
− | - | + | - |
Line 269: | Line 239: | ||
'''Dennis Turner''' | '''Dennis Turner''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- '''UITF''' | - '''UITF''' | ||
− | - | + | - |
- '''AIPINJ''' | - '''AIPINJ''' | ||
− | - | + | - |
− | |||
- '''HLA'' | - '''HLA'' | ||
− | - | + | - |
− | + | - | |
− | + | '''Next two weeks (May 24 - June 4)''' | |
− | |||
− | |||
− | - | ||
− | |||
− | '''Next two weeks ( | ||
- '''UITF''' | - '''UITF''' | ||
− | - | + | - |
− | |||
- '''AIPINJ''' | - '''AIPINJ''' | ||
− | - | + | - |
− | |||
- '''HLA''' | - '''HLA''' | ||
− | - | + | - |
− | |||
− | |||
− | |||
- '''AI FOA''' | - '''AI FOA''' | ||
− | - | + | - |
− | |||
- '''Ops''' | - '''Ops''' | ||
− | - | + | - |
− | |||
− | |||
Line 330: | Line 286: | ||
'''Kevin Jordan''' | '''Kevin Jordan''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
- | - | ||
Line 341: | Line 297: | ||
'''Joe Gubeli''' | '''Joe Gubeli''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- '''Isotopes –''' | - '''Isotopes –''' | ||
- '''ARDDOT - ''' | - '''ARDDOT - ''' | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
- '''Isotopes –''' | - '''Isotopes –''' | ||
- '''ARDDOT –''' | - '''ARDDOT –''' | ||
Line 352: | Line 308: | ||
'''Michael Tiefenback''' | '''Michael Tiefenback''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (May 24 - June 4)''' |
- | - | ||
Line 387: | Line 343: | ||
'''Andrew Hutton''' | '''Andrew Hutton''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (May 10 - May 21)''' |
− | + | - '''Isotopes: ''' | |
− | - '''Isotopes: ''' | + | - '''ERL Roadmap: ''' |
− | - '''ERL Roadmap: ''' | + | - '''JJCLab: ''' |
− | - '''JJCLab: ''' | + | - '''FCC-ee: '''. |
− | - '''FCC-ee: ''' | + | - '''HIPERLAC:''' |
− | - '''HIPERLAC:''' | + | '''Next two weeks (May 24 - June 4) |
− | '''Next two weeks ( | + | - '''Isotopes: ''' |
− | - '''Isotopes: ''' | + | - '''ERL Roadmap: ''' |
− | - '''ERL Roadmap: ''' | + | - '''PERLE: ''' |
− | - '''PERLE: ''' | + | - '''HiPERLAC:''' |
− | - '''HiPERLAC:''' | + | - '''VNACA: ''' |
− | |||
− | - '''VNACA: ''' |
Latest revision as of 13:40, 8 June 2021
May 27, 2021 Report - May 10 - June 4
Director - Todd Satogata
Todd Satogata
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
Alex Bogacz
Previous two weeks (May 10 - May 21) - Present talk on ‘ RF issues of Low Energy Muon Acceleration’ at 1-st Muon Collider Community mtg. - ERL Roadmap Panel - writeup on ‘The Art of Arcs’ - White Paper on future CEBAF - writeup on ‘FFA Energy Doubling’ - Bisected linac optics (one-on-one with Ryan) - Presenting a talk on ‘CEBAF FFA energy doubling’ at Hall C collaboration mtg. Next two weeks (May 24 - June 4) - Attending IPAC’21 - Summer Students lecture on ‘Introduction to Accelerators ’ - ERL Roadmap Panel - writeup on ‘the LHeC ERL’ - Mentoring a SULI student - FFA@CEBAF multi-pass linac optics
Ryan Bodenstein
Previous two weeks (May 10 - May 21) - Attendance of 8 AM SAD meetings - Attendance of B-Team Meetings and Procedure Development Meetings - FFA WG meetings + IPAC paper - The paper is submitted – will check on “green light” - Poster and presentation online - Looking at some IPAC proceedings already - Guidance of Isurumali’s work – lots of editing of the paper and feedback on the poster - Writing and editing LDRD full proposal - Currently looking through finer details to make a strong case - Will need to re-examine budget a bit – will tie Spata into this - Will iterate with colleagues. - Gave input into Andrew’s LDRD proposal as well. - ILC meeting with Andrei and Todd Next two weeks (May 24 - June 4) - IPAC21 attendance - LDRD Proposal work – will submit on May 28th
Rui Li
Previous two weeks (May 10 - May 21) - Next two weeks (May 21 - June 4) -
Edy Nissen
Previous two weeks (May 10 - May 21) - Created posters for IPAC - Created slides for IPAC talk - Recorded IPAC talk and poster videos - Completed IPAC proceedings papers - Wrote SAD update talk for GlueX meeting Next two weeks (May 24 - June 4) - Attended IPAC with 1 contributed talk and 2 posters - Gave SAD update talk at GlueX meeting - I will be taking some time off next week
Chris Tennant
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
Max Bruker
Previous two weeks (May 10 - May 21) - IPAC poster + video + paper done - I repeated some simulations of the emittance growth in the IMP experiment with phase dithering to make sure they all use the same, most recent tracking code. Unfortunately, the result does not agree with reality anymore! This may be something to study at a later point. For now, I left the dithering results out of the IPAC material. - We wanted to start beam commissioning of the CEBAF injector upgrade this week, but it was delayed by a series of unfortunate circumstances. Next two weeks (May 24 - June 4) - Start the aforementioned beam commissioning phase.
Bhawin Dhital
Previous two weeks (May 10 - May 21) - Completed papers preparations for IPAC'21. Two papers submitted for publications. - Completed videos uploads for a contributed talk and for a poster presentations at IPAC'21. - I was working on new lattice with isochronous arc. Next two weeks (May 24 - June 4) - I will participate at IPAC'21 virtual conference starting 05/24/2021 and ends at 05/28/2021. - I will be working with new dual energy ring and parameters calculation.
Amy Sy
Previous two weeks (May 10 - May 21) - Review of student applications as part of the selection committee for MFURA awards. - Continued work with the Brown-Servranckx transform for round, uncoupled beam from a magnetized beam. Trying to characterize the effects of different forms of the Brown-Servranckx transform, both with and without the 2.5D space charge solver enabled. The 3D space charge solver seems to result in huge, unphysical beams, so still trying to understand this module and its implementation. - Laser particle counter: test apparatus has been reassembled in TL 1011. Minor modifications, including moving the vacuum pump off of the bench to the floor, may be necessary as testing resumes. The vendor has received and tested initial hardware components and plans to be on site 5/26 and 5/27, returning once per week on a continuing basis thereafter. - Usual biweekly meeting with Omnisensing Photonics to discuss general progress. - Prepared and gave a short presentation on parametric-resonance ionization cooling (PIC and Skew PIC) concepts, implementation, and challenges as part of the 1st Muon Community Meeting hosted by CERN. Presentation was part of an overall presentation on advanced muon cooling concepts. Next two weeks (May 24 - June 4) - Attending virtual IPAC2021. Following week: catching up on IPAC talks missed during on site work. - Laser particle counter: On site visit by vendor on 5/26 and 5/27. A 6-channel prototype was delivered instead of the 12-channel prototype expected due to hardware delays. Initial visit to familiarize ourselves with the hardware and GUI for data-taking. The current prototype can only record data from two channels simultaneously, so an obvious action item is to enable simultaneous recording of data from all six available channels. - Submitted an action item list to the vendor. Vendor will return with prototype detector either 6/3 or the following week.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
Randi Gamage
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
River Huang
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
Isurumali Neththikumara
Previous two weeks (May 10 - May 21) - Prepared the poster, poster video and paper for IAPC’21 - Read some materials received from USPAS Spin dynamics in Particle Accelerator class. - Checking outcome for 12-dimensional search problem with different constraints. Next two weeks (May 24 - June 4) - Participate in IPAC’21. - Continue 12-D search and figure out the better suited constraints and try to come up with a modified objective functions.
Dennis Turner
Previous two weeks (May 10 - May 21) - UITF - - AIPINJ - - 'HLA - - Next two weeks (May 24 - June 4) - UITF - - AIPINJ - - HLA - - AI FOA - - Ops -
He Zhang
Previous two weeks (May 10 - May 21) - Finished IPAC slides and presentation. Finished and uploaded the IPAC paper. - Participate in writing and editing an LDRD proposal. Next two weeks (May 24 - June 4) - IPAC’21 - Add to TPSA lib the feature: generate a symplectic map from a given truncated map. - Finish writing the tests for the TPSA lib. - Writing FMM paper.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
Joe Gubeli
Previous two weeks (May 10 - May 21) - Isotopes – - ARDDOT - Next two weeks (May 24 - June 4) - Isotopes – - ARDDOT –
Michael Tiefenback
Previous two weeks (May 10 - May 21) - Next two weeks (May 24 - June 4) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (May 10 - May 21) - Start setting up CRADA with HZDR - Started preparing presentation on loss control in high current ERLs - Reviewed several IPAC papers and presentations - Submitted ERL Roadmap entries - Went over FOA call for SBIRs with Michelle Shinn - Put together LDRD proposal Next two weeks (May 24 - June 4) - Attend IPAC - Complete and present talk on Loss control in high current ERLs for SHC group - Submit LDRD proposal - Set up training for Drive Laser Enclosure LPSS - Start developing longitudinal model for CeC ERL on LiTrack
Andrew Hutton
Previous two weeks (May 10 - May 21) - Isotopes: - ERL Roadmap: - JJCLab: - FCC-ee: . - HIPERLAC: Next two weeks (May 24 - June 4) - Isotopes: - ERL Roadmap: - PERLE: - HiPERLAC: - VNACA: