Difference between revisions of "2015-Nov-09 Comp. Phys. Biweekly Report"
Jump to navigation
Jump to search
(Created page with "Yves Roblin <ul> <li>working on Optics for CEBAF restart **optics for 6 pass run **optics for gradient calibration **debugging CED scripts used to load optics (with AHLA) <li...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
Yves Roblin | Yves Roblin | ||
<ul> | <ul> | ||
− | + | *working on Optics for CEBAF restart | |
**optics for 6 pass run | **optics for 6 pass run | ||
**optics for gradient calibration | **optics for gradient calibration | ||
**debugging CED scripts used to load optics (with AHLA) | **debugging CED scripts used to load optics (with AHLA) | ||
− | + | *prepared and then gave a seminar at ODU on "computational beam physics challenges for MEIC" | |
− | + | *submitted a proposal to DOE for NET2025 with Amber Boehlen | |
− | + | *conducted interviews for position 11602. Offer has been made as of last Friday. | |
</ul> | </ul> | ||
+ | |||
He Zhang | He Zhang | ||
<ul> | <ul> | ||
− | + | *Working on cooling LDRD | |
</ul> | </ul> |
Latest revision as of 14:04, 20 July 2016
Yves Roblin
- working on Optics for CEBAF restart
- optics for 6 pass run
- optics for gradient calibration
- debugging CED scripts used to load optics (with AHLA)
- prepared and then gave a seminar at ODU on "computational beam physics challenges for MEIC"
- submitted a proposal to DOE for NET2025 with Amber Boehlen
- conducted interviews for position 11602. Offer has been made as of last Friday.
He Zhang
- Working on cooling LDRD