Difference between revisions of "2015-06-12 Accelerator Physics Report"

From Administrative
Jump to navigation Jump to search
(Created page with "CASA Accelerator Physics<br> Bi-Weeklly Report - due 06-12-2015<br> Submitted by: Todd Satogata<br> <br> <br> Here is the biweekly report from Physics. I use initials for gro...")
 
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
CASA Accelerator Physics<br>
 
CASA Accelerator Physics<br>
Bi-Weeklly Report - due 06-12-2015<br>
+
Bi-Weekly Report - 05/29/2015 - 06/12/2015<br>
 
Submitted by:  Todd Satogata<br>
 
Submitted by:  Todd Satogata<br>
 
<br>
 
<br>
Line 7: Line 7:
 
<br>
 
<br>
  
Previous two weeks (May 29-Jun 12) CEBAF / Operations<br>
+
CEBAF / Operations<br>
 
<ul>
 
<ul>
 
<li>LOC meetings/planning for mid-July StayTreat (TS)
 
<li>LOC meetings/planning for mid-July StayTreat (TS)
Line 13: Line 13:
 
<li>Finished/circulated emittance contributed talk paper (TS)
 
<li>Finished/circulated emittance contributed talk paper (TS)
 
<li>UITF reengagement (AB)
 
<li>UITF reengagement (AB)
 +
</ul>
  
  
Line 21: Line 22:
 
<li>Calculated flat beam/magnetized beam transforms (DD)
 
<li>Calculated flat beam/magnetized beam transforms (DD)
 
<li>Aperture studies for Project E lattice (CT)
 
<li>Aperture studies for Project E lattice (CT)
 +
</ul>
  
MEIC
 
• Calculations of coasting beam stability needs (TS)
 
• Develop bunch splitting simulations, IPAC15 followup (RG, TS)
 
• Nonlinear crabbing simulation planning (AC, TS)
 
• Synergia compilation for Booster injection sims (TS, AB)
 
• Lattice s2e setup (CT)
 
  
LDRD
+
MEIC<br>
No progress (microbunching info from CT in hands of Rui/Yves)
+
<ul>
Community service/training/other
+
<li>Calculations of coasting beam stability needs (TS)
Prepare LHeC talk for ERL workshop (AB)
+
<li>Develop bunch splitting simulations, IPAC15 followup (RG, TS)
Summer lecture series: intro to accelerators, 6/9 (TS)
+
<li>Nonlinear crabbing simulation planning (AC, TS)
IPAC15 proceedings finalization (TS)
+
<li>Synergia compilation for Booster injection sims (TS, AB)
JACoW annual team meeting planning (TS)
+
<li>Lattice s2e setup (CT)
Thesis writing (AC)
+
</ul>
Travel/vacation
 
DD: vacation 5/29-6/3
 
TS: partial FMLA 6/5-8
 
CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)
 
  
  
Next two weeks (Jun 12-Jun 26)
+
LDRD<br>
 +
<ul>
 +
<li>No progress (microbunching info from CT in hands of Rui/Yves)
 +
</ul>
  
  
CEBAF / Operations
+
Community service/training/other
Optics analysis, preparation for StayTreat (TS)
+
<ul>
Evaluate Hall D optics feedback status (TS)
+
<li>Prepare LHeC talk for ERL workshop (AB)
Evaluate quad centering with data from test archiver (TS)
+
<li>Summer lecture series: intro to accelerators, 6/9 (TS)
Administrate RSR, BTeam (TS)
+
<li>IPAC15 proceedings finalization (TS)
UITF reengagement (AB)
+
<li>JACoW annual team meeting planning (TS)
Project E/Darklight
+
<li>Thesis writing (AC)
Continued halo, aperture analysis (DD, CT)
+
</ul>
Document flat beam/magnetized beam transforms (DD)
 
Use Cheng-Ying's code for microbunching gain calculation for Project E (CT)
 
  
  MEIC
 
Develop bunch splitting simulations, IPAC15 followup (TS, RG)
 
Continue nonlinear crabbing simulation planning, implementation (AC, TS)
 
Cooler re-engagement, lattice resurrection (DD, CT)
 
Lattice s2e setup, including magnetization (CT with input from DD)
 
Begin transverse parameter scans for cooler linac (CT)
 
Community service/training/other
 
Work on overdue NIM/PR reviews (DD)
 
Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)
 
  
Travel/vacation
+
Travel/vacation<br>
DD/CT: IEB Workshop 6/16-19 (Cornell)
+
<ul>
AB: vacation 6/16-7/29 (note long vacation)
+
<li>DD: vacation 5/29-6/3
TS: vacation 6/16, 6/24-25
+
<li>TS: partial FMLA 6/5-8
CT: vacation 6/29-7/3 (beyond two-week horizon but worth mentioning)
+
<li>CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)
 +
</ul>

Latest revision as of 08:52, 21 July 2015

CASA Accelerator Physics
Bi-Weekly Report - 05/29/2015 - 06/12/2015
Submitted by: Todd Satogata


Here is the biweekly report from Physics. I use initials for group members as usual: AB=Alex Bogacz, DD=Dave Douglas, CT=Chris Tennant, AC=Alex Castilla, RG=Randy Gamage, TS=Todd Satogata. A lot of group time is involved in the ERL and IEB workshops in this period. I'll chat with Yves separately about whether more work is needed from Chris on the CSR experiment LDRD over the next month.

CEBAF / Operations

  • LOC meetings/planning for mid-July StayTreat (TS)
  • Administrate RSR, BTeam (TS)
  • Finished/circulated emittance contributed talk paper (TS)
  • UITF reengagement (AB)


Project E/Darklight

  • Darklight collaboration meeting 6/4-5 (DD,CT)
  • Lattice hypersensitivity to alpha evaluation (DD, CT)
  • Calculated flat beam/magnetized beam transforms (DD)
  • Aperture studies for Project E lattice (CT)


MEIC

  • Calculations of coasting beam stability needs (TS)
  • Develop bunch splitting simulations, IPAC15 followup (RG, TS)
  • Nonlinear crabbing simulation planning (AC, TS)
  • Synergia compilation for Booster injection sims (TS, AB)
  • Lattice s2e setup (CT)


LDRD

  • No progress (microbunching info from CT in hands of Rui/Yves)


Community service/training/other

  • Prepare LHeC talk for ERL workshop (AB)
  • Summer lecture series: intro to accelerators, 6/9 (TS)
  • IPAC15 proceedings finalization (TS)
  • JACoW annual team meeting planning (TS)
  • Thesis writing (AC)


Travel/vacation

  • DD: vacation 5/29-6/3
  • TS: partial FMLA 6/5-8
  • CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)