Difference between revisions of "2015-06-12 Accelerator Physics Report"

From Administrative
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
CASA Accelerator Physics<br>
 
CASA Accelerator Physics<br>
Bi-Weeklly Report - due 06-12-2015<br>
+
Bi-Weekly Report - 05/29/2015 - 06/12/2015<br>
 
Submitted by:  Todd Satogata<br>
 
Submitted by:  Todd Satogata<br>
 
<br>
 
<br>
Line 7: Line 7:
 
<br>
 
<br>
  
Previous two weeks (May 29-Jun 12) CEBAF / Operations<br>
+
CEBAF / Operations<br>
 
<ul>
 
<ul>
 
<li>LOC meetings/planning for mid-July StayTreat (TS)
 
<li>LOC meetings/planning for mid-July StayTreat (TS)
Line 14: Line 14:
 
<li>UITF reengagement (AB)
 
<li>UITF reengagement (AB)
 
</ul>
 
</ul>
<br>
 
<br>
 
  
  
Line 25: Line 23:
 
<li>Aperture studies for Project E lattice (CT)
 
<li>Aperture studies for Project E lattice (CT)
 
</ul>
 
</ul>
<br>
+
 
<br>
 
  
 
MEIC<br>
 
MEIC<br>
Line 37: Line 34:
 
</ul>
 
</ul>
  
LDRD
 
No progress (microbunching info from CT in hands of Rui/Yves)
 
Community service/training/other
 
Prepare LHeC talk for ERL workshop (AB)
 
Summer lecture series: intro to accelerators, 6/9 (TS)
 
IPAC15 proceedings finalization (TS)
 
JACoW annual team meeting planning (TS)
 
Thesis writing (AC)
 
Travel/vacation
 
DD: vacation 5/29-6/3
 
TS: partial FMLA 6/5-8
 
CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)
 
  
 +
LDRD<br>
 +
<ul>
 +
<li>No progress (microbunching info from CT in hands of Rui/Yves)
 +
</ul>
  
Next two weeks (Jun 12-Jun 26)
 
  
 +
Community service/training/other
 +
<ul>
 +
<li>Prepare LHeC talk for ERL workshop (AB)
 +
<li>Summer lecture series: intro to accelerators, 6/9 (TS)
 +
<li>IPAC15 proceedings finalization (TS)
 +
<li>JACoW annual team meeting planning (TS)
 +
<li>Thesis writing (AC)
 +
</ul>
  
CEBAF / Operations
 
Optics analysis, preparation for StayTreat (TS)
 
Evaluate Hall D optics feedback status (TS)
 
Evaluate quad centering with data from test archiver (TS)
 
Administrate RSR, BTeam (TS)
 
UITF reengagement (AB)
 
Project E/Darklight
 
Continued halo, aperture analysis (DD, CT)
 
Document flat beam/magnetized beam transforms (DD)
 
Use Cheng-Ying's code for microbunching gain calculation for Project E (CT)
 
  
  MEIC
+
Travel/vacation<br>
Develop bunch splitting simulations, IPAC15 followup (TS, RG)
+
<ul>
Continue nonlinear crabbing simulation planning, implementation (AC, TS)
+
<li>DD: vacation 5/29-6/3
Cooler re-engagement, lattice resurrection (DD, CT)
+
<li>TS: partial FMLA 6/5-8
Lattice s2e setup, including magnetization (CT with input from DD)
+
<li>CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)
Begin transverse parameter scans for cooler linac (CT)
+
</ul>
Community service/training/other
 
Work on overdue NIM/PR reviews (DD)
 
Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)
 
 
 
Travel/vacation
 
DD/CT: IEB Workshop 6/16-19 (Cornell)
 
AB: vacation 6/16-7/29 (note long vacation)
 
TS: vacation 6/16, 6/24-25
 
CT: vacation 6/29-7/3 (beyond two-week horizon but worth mentioning)
 

Latest revision as of 08:52, 21 July 2015

CASA Accelerator Physics
Bi-Weekly Report - 05/29/2015 - 06/12/2015
Submitted by: Todd Satogata


Here is the biweekly report from Physics. I use initials for group members as usual: AB=Alex Bogacz, DD=Dave Douglas, CT=Chris Tennant, AC=Alex Castilla, RG=Randy Gamage, TS=Todd Satogata. A lot of group time is involved in the ERL and IEB workshops in this period. I'll chat with Yves separately about whether more work is needed from Chris on the CSR experiment LDRD over the next month.

CEBAF / Operations

  • LOC meetings/planning for mid-July StayTreat (TS)
  • Administrate RSR, BTeam (TS)
  • Finished/circulated emittance contributed talk paper (TS)
  • UITF reengagement (AB)


Project E/Darklight

  • Darklight collaboration meeting 6/4-5 (DD,CT)
  • Lattice hypersensitivity to alpha evaluation (DD, CT)
  • Calculated flat beam/magnetized beam transforms (DD)
  • Aperture studies for Project E lattice (CT)


MEIC

  • Calculations of coasting beam stability needs (TS)
  • Develop bunch splitting simulations, IPAC15 followup (RG, TS)
  • Nonlinear crabbing simulation planning (AC, TS)
  • Synergia compilation for Booster injection sims (TS, AB)
  • Lattice s2e setup (CT)


LDRD

  • No progress (microbunching info from CT in hands of Rui/Yves)


Community service/training/other

  • Prepare LHeC talk for ERL workshop (AB)
  • Summer lecture series: intro to accelerators, 6/9 (TS)
  • IPAC15 proceedings finalization (TS)
  • JACoW annual team meeting planning (TS)
  • Thesis writing (AC)


Travel/vacation

  • DD: vacation 5/29-6/3
  • TS: partial FMLA 6/5-8
  • CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)