Difference between revisions of "2018-07-20"

From Administrative
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
'''Accelerator Physics - T. Satogata (Interim CASA Department Head)'''<br>
 
'''Accelerator Physics - T. Satogata (Interim CASA Department Head)'''<br>
 
Todd Satogata
 
Todd Satogata
  Previous two weeks (July 9-July 20)
+
*Previous two weeks (July 9-July 20)
    - ADMIN: Leadership/group meetings, staffing input and planning
+
**ADMIN: Leadership/group meetings, staffing input and planning
    - ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
+
**ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
    - JLEIC: pCDR writing, template, impedance/HE/R&D meetings
+
**JLEIC: pCDR writing, template, impedance/HE/R&D meetings
    - JLEIC: Summer student work on Booster simulations, training
+
**JLEIC: Summer student work on Booster simulations, training
    - ODU: Randy PhD defense (Jul 12, passed!)
+
**ODU: Randy PhD defense (Jul 12, passed!)
  Next two weeks (July 23-Aug 3)
+
*Next two weeks (July 23-Aug 3)
    - ADMIN: Leadership/group meetings, staffing input and planning
+
**ADMIN: Leadership/group meetings, staffing input and planning
    - ADMIN: DOE Operations Review (Jul 25-26)
+
**ADMIN: DOE Operations Review (Jul 25-26)
    - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
+
**JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
    - JLEIC: Complete Booster vacuum tech note calculations
+
**JLEIC: Complete Booster vacuum tech note calculations
    - JLEIC: NAS report release presentation (Jul 24)
+
**JLEIC: NAS report release presentation (Jul 24)
    - JLEIC: Summer student work on Booster simulations, training
+
**JLEIC: Summer student work on Booster simulations, training
    - JLEIC: EIC User's Group Meeting (Catholic University, Jul 30-Aug 2)
+
**JLEIC: EIC User's Group Meeting (Catholic University, Jul 30-Aug 2)
    - JLEIC: Summer student poster session (Aug 3)
+
**JLEIC: Summer student poster session (Aug 3)
    - IPAC18: Finalize proceedings, IPAC'18 delegate survey report
+
**IPAC18: Finalize proceedings, IPAC'18 delegate survey report
  
 
Alex Bogacz
 
Alex Bogacz
  Previous two weeks (July 9-July 20)
+
*Previous two weeks (July 9-July 20)
    - VACATION: Jul 9-Jul 13
+
**VACATION: Jul 9-Jul 13
    - ADMIN: Phys Rev Accel Beams paper review
+
**ADMIN: Phys Rev Accel Beams paper review
  Next two weeks (July 23-Aug 3)
+
*Next two weeks (July 23-Aug 3)
    - MUONS: Summary on muon acceleration for European Strategy Group
+
**MUONS: Summary on muon acceleration for European Strategy Group
    - PERLE: Refinement on PERLE lattice
+
**PERLE: Refinement on PERLE lattice
    - PERLE: Refinement on the LHeC ERL lattice
+
**PERLE: Refinement on the LHeC ERL lattice
  
 
Rui Li
 
Rui Li
  Previous two weeks (July 9-July 20)
+
*Previous two weeks (July 9-July 20)
    - JLEIC: Finished the transverse coupled bunch instability (TCBI)
+
**JLEIC: Finished the transverse coupled bunch instability (TCBI) calculations using ZAP and my mathematica. Get good agreement. And the mathematica gives more details of the particular HOM that cause the high growth rate that would help the SRF people to improve their HOM damper design for mitigating the instability
      calculations using ZAP and my mathematica. Get good
+
**JLEIC: Finished my writing for the ICFA newsletter. When checking more details of my preCDR writing and hoping to use it for the ICFA newsletter, I found many details in my preCDR writing can be improved -- the statement can be more precise,and estimations can be done with more consistent formulas. I will send you my ICFA newsletter writing as the new version of my preCDR writing, probably later today or early next week.
      agreement. And the mathematica gives more details of the
+
*Next two weeks (July 23-Aug 3)
      particular HOM that cause the high growth rate that would help
+
**JLEIC: Summarize the LCBI and TCBI results and be ready to present at JLEIC R&D meeting and for technote writeup
      the SRF people to improve their HOM damper design for
+
**JLEIC: Going over the whole list of collective effects forJLEIC, understand what has been done and what need to be done(especially the work need to be done before the next collaboration meeting), and make a list of plan for my studies in the next several month
      mitigating the instability
 
    - JLEIC: Finished my writing for the ICFA newsletter. When
 
      checking more details of my preCDR writing and hoping to use it
 
      for the ICFA newsletter, I found many details in my preCDR
 
      writing can be improved -- the statement can be more precise,
 
      and estimations can be done with more consistent formulas. I
 
      will send you my ICFA newsletter writing as the new version of
 
      my preCDR writing, probably later today or early next week.
 
     
 
  Next two weeks (July 23-Aug 3)
 
    - JLEIC: Summarize the LCBI and TCBI results and be ready to
 
      present at JLEIC R&D meeting and for technote writeup
 
    - JLEIC: Going over the whole list of collective effects for
 
      JLEIC, understand what has been done and what need to be done
 
      (especially the work need to be done before the next
 
      collaboration meeting), and make a list of plan for my studies
 
      in the next several month
 
  
 
Edy Nissen
 
Edy Nissen
  Previous two weeks (July 9-July 20)
+
*Previous two weeks (July 9-July 20)
    - JLEIC: Mainly working on the booster working point
+
**JLEIC: Mainly working on the booster working point issue. Have gone from <50% to 63% beam survival.
      issue. Have gone from <50% to 63% beam survival.
+
**JLEIC: The longitudinal anomaly appears to be some sort of artifact of using 2d space charge, so this has been discontinued, unfortunately this makes calculations very slow
    - JLEIC: The longitudinal anomaly appears to be some sort of
+
**JLEIC: Assisted in formatting word tables into latex for the pCDR
      artifact of using 2d space charge, so this has been
+
*Next two weeks (July 23-Aug 3)
      discontinued, unfortunately this makes calculations very slow
+
**JLEIC: Continue the working point simulations
    - JLEIC: Assisted in formatting word tables into latex for the
+
**JLEIC: Work on transfer lines as soon as the geometric data is available
      pCDR
+
**JLEIC: Provide any additional assistance to the pCDR
  Next two weeks (July 23-Aug 3)
 
    - JLEIC: Continue the working point simulations
 
    - JLEIC: Work on transfer lines as soon as the geometric data is
 
      available
 
    - JLEIC: Provide any additional assistance to the pCDR
 
  
 
Chris Tennant
 
Chris Tennant
  Previous two weeks (July 9-July 20)
+
*Previous two weeks (July 9-July 20)
    - VACATION:  July 16-19
+
**VACATION:  July 16-19
    - JLEIC: seek counsel for path forward with S2E
+
**JLEIC: seek counsel for path forward with S2E
    - JLEIC: pCDR writing
+
**JLEIC: pCDR writing
  Next two weeks (July 23-Aug 3)
+
*Next two weeks (July 23-Aug 3)
    - ADMIN: Catch up from time away
+
**ADMIN: Catch up from time away
    - LERF: isotope kick-off meeting
+
**LERF: isotope kick-off meeting
    - JLEIC: editing/writing pCDR (this will be a common theme in
+
**JLEIC: editing/writing pCDR (this will be a common theme in future biweeklies)
      future biweeklies)
 
  
 
----
 
----
 
'''Accelerator R &amp; D - Y. Zhang'''<br>
 
'''Accelerator R &amp; D - Y. Zhang'''<br>
 
Fanglei Lin
 
Fanglei Lin
*Provided JLEIC electron polarization contribution to the ICFA Beam Dynamics Newsletter.
+
*Finished the new electron collider ring design(s) and presented in the JLEIC R&D meeting.
*Provided the new electron ring parameters to Tim's group, Leigh, Rui and Shaoheng.
+
*Helping the student and working on the storage ring cooler project.
*Working with the student on the storage ring cooler.
+
* Updating the electron collider ring design for the pre-CDR.
*Miscellaneous: attended a meeting with Peter McIntyre, attended the JLEIC R&D meeting, attended JLEIC cooler project kickoff meeting, attended JLEIC general meeting.
+
* Miscellaneous: attended CASA group meeting, attended the JLEIC R&D meetings, attended JLEIC general meeting, attended storage ring bi-weekly meeting, attended innovative electron cooling project status meeting.  
<br>
+
 
 
Vasiliy Morozov
 
Vasiliy Morozov
*My main activities in the past two weeks were:
+
* Last two weeks
**Geometry tagging LDRD: simulations and data analysis.
+
**Compiling a DoE quarterly report
**Ion beam loss studies: work with Hannah on beam loss simulations
+
**Work on beam loss studies with Hannah
**Writing of ICFA news letter contribution
+
**Geometry tagging LDRD: running cross-section calculations on the farm
*Main activities planned for the next two weeks:
+
**Polarization: teleconference with Anatoliy's group
**Preparation of DoE R&D quarterly report
+
* Next two weeks
 
**Ion collider ring design
 
**Ion collider ring design
**Beam loss studies
+
**Attending EIC users' group meeting
**Writing of ICFA news letter and pCDR
+
 
<br>
 
 
Amy Sy
 
Amy Sy
**Prepared and gave presentation on LDRD proposal "Laser driven polarized D source for JLEIC" at LDRD review.
+
*Working on Skew PIC closeout report.
**Working on Skew PIC closeout report.
+
*Working with ion collider ring injection lattice in elegant to start some simulations of injection error effects and injection damping requirements. Ensuring proper beam distribution and cutoffs for injection mode. Checking phase and voltage of the RF cavity for longitudinal stability. Modified lattice to recirculate at crossing (injection) point rather than IP. Preliminary simulations of emittance growth due to transverse injection offset show reasonable agreement between calculation and simulation.
**Starting simulations of transverse feedback system in the ion collider ring. Using Elegant lattice with injection optics to study effects of injection errors on beam stability.
+
*Will run GEMC simulations for tracking of final states from incoherent diffractive scattering events using current detector model and updated (using new lattices) detector model
<br>
+
 
 
Guohui Wei
 
Guohui Wei
 
*On Leave
 
*On Leave
<br>
+
 
 
Yuhong Zhang
 
Yuhong Zhang
*Continued development of HE-JLEIC design concept
+
*Completed HE-JLEIC, provided luminosity to physicists (Rolf Ent), gave presentation at JLEIC general meeting
*Gave a presentation at LDRD proposal review
+
*Completed FOA quarterly report on IMP cooling exp.
*Started R&D activities on two FOA grants (bunched beam electron experiment and micro-bunching based coherent electron cooling)
+
*Completed editing of ICFA Beam Dynamics Newsletter    articles, wrote three sections (introduction, overview    and cooling scheme)
*Continued writing pre-CDR
+
*Completed two sections on cooling for JLEIC preCDR writing DC cooler section
*Started editing of ICFA beam dynamics newsletter
+
*Worked on EIC accelerator collaboration meeting organization (email announcement, poster, etc)
<br>
+
* Participated FOA R&D (MB CeC and Storage-ring cooler), attended telephones
 +
* Other misc activities on JLEIC
  
 
----
 
----
 
'''Computational Physics - Y. Roblin'''<br>
 
'''Computational Physics - Y. Roblin'''<br>
Kirsten Deitrick:
+
 
*Last two weeks:
+
Yves Roblin:
**Magnetized beam (LEFR PoP):
+
*Past two weeks
*:-correct magnetization damage after FEL booster with off-axis travel through skew quad (prepping to run/optimize on cluster)
+
**JLEIC:
*:-start looking at magnetization preservation through merger designs
+
***pCDR writing
 +
***looking at running with two IPs, effect on beam-beam
 +
***presentation to meeting on status of bbeam
 +
**CEBAF:
 +
***BTEAM meetings
 +
***preparing slides for ops talk July 26
 +
***slides for PREX collaboration talk
 +
***attended part of the PAC
 +
***assisted nuc. Phys .for preparing for PAC
 +
***revising the ORFP, writing test plans for low DE/E running
 +
*Next two weeks:
 +
**OPS pre-startup talk
 +
**BTEAM, more work on preparing for startup
 +
**PCDR writing, beambeam
 +
 
 +
Dennis Turner
 +
*Last two weeks
 +
**rayTrace:
 +
***Modified the rayTrace data collection tool to retrieve the design lattice with ced2elegant rather than eDecks.
 +
***Modified rayTrace to output data in SDDS format with the columns/parameters as requested by Tief.
 +
***Code cleanup and numerous other modifications
 +
**Audit rules:
 +
***Started implementing a tool to audit the design decks as per the audit rules in your technote.
 +
**Attended BTeam meeting 7/10.
 +
**Doctor appointment 7/16.
 +
*Next two weeks
 +
**Continue work on rayTrace.  Finish data collection tool and begin work on analysis tools.
 +
**Continue work on deck audit tool.
 +
**Vacation 7/25 to 7/29
 +
**Control room shifts start 8/2 (swing).
 +
 
 +
He Zhang
 +
*Last two weeks
 +
**DA-Based Generating Functions
 +
***A few weeks ago, the C++ codes that reads a truncated transfer map from COSY Infinity and constructs the 2nd kind of generating function of the truncated map were developed. These codes were revised and extended. Now given the truncated map, the codes can construct anyone of the four popular kinds of generating functions per user’s require. The results are verified with COSY Infinity 9.0. The coefficients of all the dominating terms agree. There are some terms with much smaller coefficients and the value of those small coefficients may be different. I suspect this is the result of double floating point operations and it is tolerable. It should not affect the symplectic tracking, which should be verified later when the tracking codes are ready.
 +
***To maintain the symplecticity in tracking, what we really need is not the generating function, but the relations between the mixed phase space coordinates. These relations can be derived from the generating functions. However, I noticed that the relations between the mixed coordinates are mid-step product when we construct the generating function, which means we can derive the mixed coordinate relations without the generating functions. I will test this theory in the tracking code.
 +
***The truncated map parser is also revised. Previously, one needs to edit the COSY Infinity output by removing some text before the codes can load the map. Now the code can read the original COSY Infinity output. The new parser also solved one previous problem when the da orders are higher than 10.
 +
***The tpsa code, used for da operations in the construction of the generating functions, was also updated.
 +
***Started documenting the algorithm.
 +
**Investigate and write about the low-energy cooler for pCDR
 +
**Write a brief report for 2017 Accelerator R&D fund
 +
**Write a brief plan for future cooling code development
 +
**Discussed with Rongli about dust particle transfer. This is much more complicated than expected.
 +
**NERSC account reactivated.
 +
**ICAP trip settled.
 +
*Next two weeks
 +
**Finish the symplectic tracking code, benchmark with COSY, and document the process.
 +
**Finish and test JSPEC package of cooling with arbitrary electron beam
 +
**Write one section for pCDR on cooling efficiency enhancement
 +
 
 +
Kirsten Deitrick
 +
*Last two weeks
 +
**Magnetized beam (LERF PoP):
 +
***look at 3D FEL booster optimization results (rerunning, had to fix orientation)
 
**Straight Merger at CBETA:
 
**Straight Merger at CBETA:
*:-finish data analysis
+
***continue simulations
*:-begin simulations
+
***explain discrepancies (qualitative behavior matches relatively well)
*:-present preliminary results in JLEIC R&D meeting
+
***calculating coil field from numerically integrated formula to check calibration (ongoing)
 
**eCloud:
 
**eCloud:
*:-finish text for preCDR
+
***double check PyECLOUD results match for dipole when using different method (so other quads,sexts are accurate)
*:-get other cold section magnet properties from Vasiliy/Fanglei
 
 
**Impedance:
 
**Impedance:
*:-best/worst case for electron ring impedance scenario
+
***update all rings for RF/SRF gate valves/bellows
*:-meeting (present above + feedback kickers in various machines)
+
***add estimates to ion ring using short bunch (electron) machines
 +
***schedule next impedance meeting (Aug. 2)
 +
***start making presentation of collision ion ring broadband impedance
 
**Meetings:
 
**Meetings:
*:-Impedance
+
***CASA
*:-Cooler (x2)
+
***Cooler (x2)
*:-JLEIC (x1)
+
***JLEIC (x2)
 
**Misc:
 
**Misc:
*:-DOE Travel to China brief reading
+
***setup/introduction for student seminar (x2)
*:-Introduction for Summer Lecture Series (x2), subbing for Geoff Krafft
+
***practice presentation with Geoff's students
*:-Raemaad GPT help (Geoff's student)
+
***did soon-to-expire training
 +
***helped Bhawin (ODU) with software setup
 
*Next two weeks:
 
*Next two weeks:
 
**Magnetized beam (LERF PoP):
 
**Magnetized beam (LERF PoP):
*:-look at 3D FEL booster optimization results
+
***check 3D FEL booster optimization results
*:-magnetization preservation through merger designs
+
***magnetization preservation through mergers
 
**Straight Merger at CBETA:
 
**Straight Merger at CBETA:
*:-continue simulations
+
***finish coil field calculation for calibration check
*:-explain discrepancies (qualitative behavior matches relatively well)
+
***continue simulations
 +
***explain discrepancies
 
**eCloud:
 
**eCloud:
*:-simulate eCloud in quad/sextupole/drift of ion ring using provided parameters (mostly to show density highest in dipoles)
+
***run for quadrupoles/sextupoles/drifts, just to demonstrate eCloud density in dipoles is greatest
 +
**Impedance:
 +
***finish collision ion ring broadband impedance presentation
 +
***meeting (Aug. 2)
 
**Meetings:
 
**Meetings:
*:-Cooler (x2)
+
***CASA
*:-JLEIC (x2)
+
***Cooler (x1) (next week skipped due to Ops Review)
<br>
+
***JLEIC (x1) (next week skipped due to Ops Review)
Yves Roblin:
+
***Impedance
*Vacation 7/2 -7/6
+
**Misc:
*JLEIC:
+
***LINAC18 presentation practice
*:-pCDR writing
+
***start writing up Linac papers
*:-ICFA paper writing
 
*:-gear changing simulations
 
*CEBAF:
 
*:-Bteam
 
*:-prepare ATLIS for August half pass run
 
*:-meeting with Hall A to discuss schedule for the half pass into hall A
 
*:-APEX procedural development and planning
 
*:-model improvement, redoing all the arcs with proper K1 and constraints
 
*Next two weeks: 
 
*JLEIC:
 
*:-pCDR
 
*:-report for FOA 17 supplemental
 
*CEBAF:
 
*:-model work, coordinating activity for restart
 
*:-preparing for July 26th OPS prestart talk
 
<Br>
 
Dennis Turner:
 
*Last two weeks:
 
**Presented ced2elegant and ArcSteer to BTeam 6/26
 
**ArcSteer: 
 
*:-Odds and ends from BTeam discussions.
 
*:-Completed templates for all 10 arcs and 0R.
 
**rayTrace:
 
*:-Discussed requirements with Tief and Yves.
 
*:-Began work on data collection.  Studied existing rayTrace code.
 
**Minor bugfixes and documentation updates for ced2elegant, etc.
 
*Out of town 6/29 to 7/1.
 
*Sick 7/2 to 7/3.
 
*Holiday 7/4.
 
*Next two weeks:
 
**Continue work on rayTrace.
 
**Continue to get dispersionTool ready for further testing and release.
 
**Test ArcSteer in 0R if the opportunity arises.
 
<br>
 
He Zhang:
 
*JSPEC Development
 
Tested the codes that calculates the electron charge density inside an arbitrary electron bunch. The electron bunch is represented by two million particles, which are generated randomly with Gaussian distribution. The electron are loaded into memory and then distributed into a tree structure of boxes. The maximum number of electrons in each childless box is adjustable. This process only needs to be performed once as long as the electron charge distribution is assumed unchanged during the cooling process. The ions are put into a regular grid and the grid density is adjustable. (A regular grid is used only for testing purpose. In real simulation, ions can have any distribution.) Ions are distributed into the boxes and the charge density around the ion is calculated by the electron number inside the box divided by the box volume. Electron density is plotted for a few different grid sizes and the results show the algorithm works as expected. Numerical noises are noticed in the electron density calculation, which is as expected, and the noises reduce as the grid size becomes smaller. Now it is still not clear how much it will affect the cooling rate calculation. It will be tested later.
 
 
 
I am working on fitting the above electron density calculation code into JSPEC for cooling simulations. It needs more changes in the code than I originally expected. A new model of the electron beam has been added. But several interfaces between several modules have to be revised, because in this model the relative electron speed and temperature can change. The UI needs to be updated, too. This work is still in process.
 
 
 
*Others
 
*:-pCDR writing: Converted the previous writing into Latex and edited it again.
 
*:-ICFA writing: Wrote about mulita-stage cooling strategy and cooling simulation results for both the proton beam and lead ion beam, based on my IPAC’18 paper and pCDR writing.
 
*:-Tech report: I am writing a tech report about the TPSA/DA package that I developed based on Dr. Lingyun Yang’s code.
 
*:-ICAP trip is approved. I was told by Prof. Berz that my talk should be arranged in the first two days. I plan to stay two nights there. 
 
*:-NERSC account: submitted the NERSC AUP, trying to re-activate my account.
 
*:-Reviewed a paper for SIVP.
 
*Work plan in the following two weeks
 
*:-Continue writing and polishing the pCDR report
 
*:-Test, finish, and document the JSPEC package of cooling with arbitrary electron beam
 
*:-Test the turn-by-turn tracking packge for JSPEC.
 
 
 
  
 
----
 
----
 
'''Diagnostic Development - K. Jordan'''<br>
 
'''Diagnostic Development - K. Jordan'''<br>
 
Kevin Jordan
 
Kevin Jordan
*Continued efforts on the testing of LCLS-II cryomodules in the LERF. The cable termination should begin this week - effort has suffered due to lack of man power & priority during the SAD.I continue to inventory parts for mechanical assembly of bridging components & end cans.
+
* Major effort is still LCLS-II conversion of the LERF for cryomodule testing; last week I witnessed the final leak testing and leak checking of the new Helium transfer line at Eden Cryogenics in Columbus Ohio. This was successful, shipped, received, and delivered to theLERF vault on 7/18/20018. There were meetings held to orchestrate the installation and field fit welding. This project is competing with resources as the CEBAF machine relies for the fall Physics run. (near) Daily updates can be followed at https://wiki.jlab.org/lerf/index.php/Daily_Activities
*I have been working with Steve Shuring & Jonathan Creel to ensure the LERF transfer line, 1/4 & full cryomodule get cleaned up & cooled down in the next couple weeks when the CHL is reconfigured for operations. The heaters & waveguide needed to be reconfigured from F100 to C20 style cryomodule.
+
* Continued supporting the program choices for the upcoming IBIC conference. There are a number of folks that did not get approval
*Joined Joe on trip to RadiaBeam, this was a preliminary design review of the SBIR-II high speed, high power wire scanner
+
* Working both the Radiabeam and Alphacore SBIRs
<br>
+
* Preparing for the Isotope kickoff
 +
 
 
Joe Gubeli
 
Joe Gubeli
*Worked on a new SLM diagnostic for ARC 7. The layout is nearly complete and am waiting on a few specifications from Mike T to finish the design.
+
* Time was spent primarily on the new ARC 7 SLM proposal. I had severalchamber design iterations with the end result something that is both easy to manufacture and uses off the shelf parts like a 6"L - 4" OD hydro form bellows. I sent the model out to three vendors and received quotes from two. The first quote is for $5,995 and the second for $3,675 per chamber. I expect the third quote soon. The design for the entire project is nearly complete and I met with the CASA Diagnostics Group and Brian F. from operations to discuss the design. One small change was requested and then made. I will put together a presentation on the optical and mechanical design as well as the cost and interface requirements. Mike T. will add a few slides on the justification for why is this is needed to setup and monitor CEBAF. The final presentation will be made to the DPIT group.
*Had a progress meeting with Radiabeam on the high power, high speed wire scanner. The meeting was very productive. The design is fairly mature with some modifications requested. A timeline and installation location for the various tests were discussed as well.
+
* Worked with Brian F. to move five CEBAF viewer flags into locations to better overlap with the electron beam. We moved the four viewers on the E0 stack as well as the Lambertson viewer.
<br>
+
* Met with Wes M. on the EPICS interface to the hardware for the Radiabeam CRADA on the high power - high speed wire scanner. Had some conversations with Radiabeam's lead engineer on this project.
 +
* Had a few meetings on the LCLSII LERF project.
 +
 
 
Michael Tiefenback
 
Michael Tiefenback
*More followup on magnet integrator tasks, particularly concerning mis-wired quadrupoles.  (Two more were found.) We have to be able to _know_ that we're done on this.
+
* Diagnostic optimization for SLMs in Arc7A (and elsewhere), especially regarding practically achievable resolution, is now a front-burner issue.
*continuing assessment (with operator Brandi Cade) of cryogenic heat load calibration vs. JT setting to characterize the linac heat load. The benefit will be to guide a better match of RF heat (Q0 dissipation) against resistive heat so that RF state transitions are more transparent to CHL operation.  Still looks promising.
+
* Magnet integrator tasks, as before, concerning in particular magnet mis-wiringI _believe_ we are done with this now, but some revalidation sof measurements remains undone pending technician scheduling.
*Continuing on requirements for diagnostic optimization for SLMs in Arc7A and elsewhereStill investigating resolution issues with Gubeli and hardware.
+
* Procedure development and data analysis for intercalibration of cryogenic heat load vs. JT setting is going well. The heater logic will still need estimates of Q0 for the cavities for initial configuration, but a significant improvement in CHL load stabilization appears possible.
*Preparation for CLAS12 accelerator update talk 10 July.
+
* Preparation for beam and system tests in August, particularly time-of-flight related measurements in the NL: potentially huge speedup of cold-start cavity phasing and an alternate, more precise, and non-magnetic cavity gradient calibrationItem #3 above is operationally linked to the RF manipulations involved here.
<br>
+
 
 
----
 
----
'''LERF - S. Benson''' (Done)<br>
+
'''LERF - S. Benson'''
 
*July 9-20
 
*July 9-20
 
**Worked on pCDR editing
 
**Worked on pCDR editing
Line 252: Line 239:
 
**Write up cooling section of HE-JLEIC appendix
 
**Write up cooling section of HE-JLEIC appendix
 
----
 
----
'''A. Hutton''' (Done)<br>
+
'''A. Hutton'''
 
* July 9-20
 
* July 9-20
 
** Wrote up trip report from “Electrons for the LHC - LHeC/FCCeh and Perle Workshop in Orsay.”  Distributed to JLab Directorate and the ALCC (America’s Linear Collider Committee).   
 
** Wrote up trip report from “Electrons for the LHC - LHeC/FCCeh and Perle Workshop in Orsay.”  Distributed to JLab Directorate and the ALCC (America’s Linear Collider Committee).   

Latest revision as of 15:48, 23 July 2018

In Progress

Director - M. Spata
No report. Accelerator Division Office.



Accelerator Physics - T. Satogata (Interim CASA Department Head)
Todd Satogata

  • Previous two weeks (July 9-July 20)
    • ADMIN: Leadership/group meetings, staffing input and planning
    • ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
    • JLEIC: pCDR writing, template, impedance/HE/R&D meetings
    • JLEIC: Summer student work on Booster simulations, training
    • ODU: Randy PhD defense (Jul 12, passed!)
  • Next two weeks (July 23-Aug 3)
    • ADMIN: Leadership/group meetings, staffing input and planning
    • ADMIN: DOE Operations Review (Jul 25-26)
    • JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
    • JLEIC: Complete Booster vacuum tech note calculations
    • JLEIC: NAS report release presentation (Jul 24)
    • JLEIC: Summer student work on Booster simulations, training
    • JLEIC: EIC User's Group Meeting (Catholic University, Jul 30-Aug 2)
    • JLEIC: Summer student poster session (Aug 3)
    • IPAC18: Finalize proceedings, IPAC'18 delegate survey report

Alex Bogacz

  • Previous two weeks (July 9-July 20)
    • VACATION: Jul 9-Jul 13
    • ADMIN: Phys Rev Accel Beams paper review
  • Next two weeks (July 23-Aug 3)
    • MUONS: Summary on muon acceleration for European Strategy Group
    • PERLE: Refinement on PERLE lattice
    • PERLE: Refinement on the LHeC ERL lattice

Rui Li

  • Previous two weeks (July 9-July 20)
    • JLEIC: Finished the transverse coupled bunch instability (TCBI) calculations using ZAP and my mathematica. Get good agreement. And the mathematica gives more details of the particular HOM that cause the high growth rate that would help the SRF people to improve their HOM damper design for mitigating the instability
    • JLEIC: Finished my writing for the ICFA newsletter. When checking more details of my preCDR writing and hoping to use it for the ICFA newsletter, I found many details in my preCDR writing can be improved -- the statement can be more precise,and estimations can be done with more consistent formulas. I will send you my ICFA newsletter writing as the new version of my preCDR writing, probably later today or early next week.
  • Next two weeks (July 23-Aug 3)
    • JLEIC: Summarize the LCBI and TCBI results and be ready to present at JLEIC R&D meeting and for technote writeup
    • JLEIC: Going over the whole list of collective effects forJLEIC, understand what has been done and what need to be done(especially the work need to be done before the next collaboration meeting), and make a list of plan for my studies in the next several month

Edy Nissen

  • Previous two weeks (July 9-July 20)
    • JLEIC: Mainly working on the booster working point issue. Have gone from <50% to 63% beam survival.
    • JLEIC: The longitudinal anomaly appears to be some sort of artifact of using 2d space charge, so this has been discontinued, unfortunately this makes calculations very slow
    • JLEIC: Assisted in formatting word tables into latex for the pCDR
  • Next two weeks (July 23-Aug 3)
    • JLEIC: Continue the working point simulations
    • JLEIC: Work on transfer lines as soon as the geometric data is available
    • JLEIC: Provide any additional assistance to the pCDR

Chris Tennant

  • Previous two weeks (July 9-July 20)
    • VACATION: July 16-19
    • JLEIC: seek counsel for path forward with S2E
    • JLEIC: pCDR writing
  • Next two weeks (July 23-Aug 3)
    • ADMIN: Catch up from time away
    • LERF: isotope kick-off meeting
    • JLEIC: editing/writing pCDR (this will be a common theme in future biweeklies)

Accelerator R & D - Y. Zhang
Fanglei Lin

  • Finished the new electron collider ring design(s) and presented in the JLEIC R&D meeting.
  • Helping the student and working on the storage ring cooler project.
  • Updating the electron collider ring design for the pre-CDR.
  • Miscellaneous: attended CASA group meeting, attended the JLEIC R&D meetings, attended JLEIC general meeting, attended storage ring bi-weekly meeting, attended innovative electron cooling project status meeting.

Vasiliy Morozov

  • Last two weeks
    • Compiling a DoE quarterly report
    • Work on beam loss studies with Hannah
    • Geometry tagging LDRD: running cross-section calculations on the farm
    • Polarization: teleconference with Anatoliy's group
  • Next two weeks
    • Ion collider ring design
    • Attending EIC users' group meeting

Amy Sy

  • Working on Skew PIC closeout report.
  • Working with ion collider ring injection lattice in elegant to start some simulations of injection error effects and injection damping requirements. Ensuring proper beam distribution and cutoffs for injection mode. Checking phase and voltage of the RF cavity for longitudinal stability. Modified lattice to recirculate at crossing (injection) point rather than IP. Preliminary simulations of emittance growth due to transverse injection offset show reasonable agreement between calculation and simulation.
  • Will run GEMC simulations for tracking of final states from incoherent diffractive scattering events using current detector model and updated (using new lattices) detector model

Guohui Wei

  • On Leave

Yuhong Zhang

  • Completed HE-JLEIC, provided luminosity to physicists (Rolf Ent), gave presentation at JLEIC general meeting
  • Completed FOA quarterly report on IMP cooling exp.
  • Completed editing of ICFA Beam Dynamics Newsletter articles, wrote three sections (introduction, overview and cooling scheme)
  • Completed two sections on cooling for JLEIC preCDR writing DC cooler section
  • Worked on EIC accelerator collaboration meeting organization (email announcement, poster, etc)
  • Participated FOA R&D (MB CeC and Storage-ring cooler), attended telephones
  • Other misc activities on JLEIC

Computational Physics - Y. Roblin

Yves Roblin:

  • Past two weeks
    • JLEIC:
      • pCDR writing
      • looking at running with two IPs, effect on beam-beam
      • presentation to meeting on status of bbeam
    • CEBAF:
      • BTEAM meetings
      • preparing slides for ops talk July 26
      • slides for PREX collaboration talk
      • attended part of the PAC
      • assisted nuc. Phys .for preparing for PAC
      • revising the ORFP, writing test plans for low DE/E running
  • Next two weeks:
    • OPS pre-startup talk
    • BTEAM, more work on preparing for startup
    • PCDR writing, beambeam

Dennis Turner

  • Last two weeks
    • rayTrace:
      • Modified the rayTrace data collection tool to retrieve the design lattice with ced2elegant rather than eDecks.
      • Modified rayTrace to output data in SDDS format with the columns/parameters as requested by Tief.
      • Code cleanup and numerous other modifications
    • Audit rules:
      • Started implementing a tool to audit the design decks as per the audit rules in your technote.
    • Attended BTeam meeting 7/10.
    • Doctor appointment 7/16.
  • Next two weeks
    • Continue work on rayTrace. Finish data collection tool and begin work on analysis tools.
    • Continue work on deck audit tool.
    • Vacation 7/25 to 7/29
    • Control room shifts start 8/2 (swing).

He Zhang

  • Last two weeks
    • DA-Based Generating Functions
      • A few weeks ago, the C++ codes that reads a truncated transfer map from COSY Infinity and constructs the 2nd kind of generating function of the truncated map were developed. These codes were revised and extended. Now given the truncated map, the codes can construct anyone of the four popular kinds of generating functions per user’s require. The results are verified with COSY Infinity 9.0. The coefficients of all the dominating terms agree. There are some terms with much smaller coefficients and the value of those small coefficients may be different. I suspect this is the result of double floating point operations and it is tolerable. It should not affect the symplectic tracking, which should be verified later when the tracking codes are ready.
      • To maintain the symplecticity in tracking, what we really need is not the generating function, but the relations between the mixed phase space coordinates. These relations can be derived from the generating functions. However, I noticed that the relations between the mixed coordinates are mid-step product when we construct the generating function, which means we can derive the mixed coordinate relations without the generating functions. I will test this theory in the tracking code.
      • The truncated map parser is also revised. Previously, one needs to edit the COSY Infinity output by removing some text before the codes can load the map. Now the code can read the original COSY Infinity output. The new parser also solved one previous problem when the da orders are higher than 10.
      • The tpsa code, used for da operations in the construction of the generating functions, was also updated.
      • Started documenting the algorithm.
    • Investigate and write about the low-energy cooler for pCDR
    • Write a brief report for 2017 Accelerator R&D fund
    • Write a brief plan for future cooling code development
    • Discussed with Rongli about dust particle transfer. This is much more complicated than expected.
    • NERSC account reactivated.
    • ICAP trip settled.
  • Next two weeks
    • Finish the symplectic tracking code, benchmark with COSY, and document the process.
    • Finish and test JSPEC package of cooling with arbitrary electron beam
    • Write one section for pCDR on cooling efficiency enhancement

Kirsten Deitrick

  • Last two weeks
    • Magnetized beam (LERF PoP):
      • look at 3D FEL booster optimization results (rerunning, had to fix orientation)
    • Straight Merger at CBETA:
      • continue simulations
      • explain discrepancies (qualitative behavior matches relatively well)
      • calculating coil field from numerically integrated formula to check calibration (ongoing)
    • eCloud:
      • double check PyECLOUD results match for dipole when using different method (so other quads,sexts are accurate)
    • Impedance:
      • update all rings for RF/SRF gate valves/bellows
      • add estimates to ion ring using short bunch (electron) machines
      • schedule next impedance meeting (Aug. 2)
      • start making presentation of collision ion ring broadband impedance
    • Meetings:
      • CASA
      • Cooler (x2)
      • JLEIC (x2)
    • Misc:
      • setup/introduction for student seminar (x2)
      • practice presentation with Geoff's students
      • did soon-to-expire training
      • helped Bhawin (ODU) with software setup
  • Next two weeks:
    • Magnetized beam (LERF PoP):
      • check 3D FEL booster optimization results
      • magnetization preservation through mergers
    • Straight Merger at CBETA:
      • finish coil field calculation for calibration check
      • continue simulations
      • explain discrepancies
    • eCloud:
      • run for quadrupoles/sextupoles/drifts, just to demonstrate eCloud density in dipoles is greatest
    • Impedance:
      • finish collision ion ring broadband impedance presentation
      • meeting (Aug. 2)
    • Meetings:
      • CASA
      • Cooler (x1) (next week skipped due to Ops Review)
      • JLEIC (x1) (next week skipped due to Ops Review)
      • Impedance
    • Misc:
      • LINAC18 presentation practice
      • start writing up Linac papers

Diagnostic Development - K. Jordan
Kevin Jordan

  • Major effort is still LCLS-II conversion of the LERF for cryomodule testing; last week I witnessed the final leak testing and leak checking of the new Helium transfer line at Eden Cryogenics in Columbus Ohio. This was successful, shipped, received, and delivered to theLERF vault on 7/18/20018. There were meetings held to orchestrate the installation and field fit welding. This project is competing with resources as the CEBAF machine relies for the fall Physics run. (near) Daily updates can be followed at https://wiki.jlab.org/lerf/index.php/Daily_Activities
  • Continued supporting the program choices for the upcoming IBIC conference. There are a number of folks that did not get approval
  • Working both the Radiabeam and Alphacore SBIRs
  • Preparing for the Isotope kickoff

Joe Gubeli

  • Time was spent primarily on the new ARC 7 SLM proposal. I had severalchamber design iterations with the end result something that is both easy to manufacture and uses off the shelf parts like a 6"L - 4" OD hydro form bellows. I sent the model out to three vendors and received quotes from two. The first quote is for $5,995 and the second for $3,675 per chamber. I expect the third quote soon. The design for the entire project is nearly complete and I met with the CASA Diagnostics Group and Brian F. from operations to discuss the design. One small change was requested and then made. I will put together a presentation on the optical and mechanical design as well as the cost and interface requirements. Mike T. will add a few slides on the justification for why is this is needed to setup and monitor CEBAF. The final presentation will be made to the DPIT group.
  • Worked with Brian F. to move five CEBAF viewer flags into locations to better overlap with the electron beam. We moved the four viewers on the E0 stack as well as the Lambertson viewer.
  • Met with Wes M. on the EPICS interface to the hardware for the Radiabeam CRADA on the high power - high speed wire scanner. Had some conversations with Radiabeam's lead engineer on this project.
  • Had a few meetings on the LCLSII LERF project.

Michael Tiefenback

  • Diagnostic optimization for SLMs in Arc7A (and elsewhere), especially regarding practically achievable resolution, is now a front-burner issue.
  • Magnet integrator tasks, as before, concerning in particular magnet mis-wiring. I _believe_ we are done with this now, but some revalidation sof measurements remains undone pending technician scheduling.
  • Procedure development and data analysis for intercalibration of cryogenic heat load vs. JT setting is going well. The heater logic will still need estimates of Q0 for the cavities for initial configuration, but a significant improvement in CHL load stabilization appears possible.
  • Preparation for beam and system tests in August, particularly time-of-flight related measurements in the NL: potentially huge speedup of cold-start cavity phasing and an alternate, more precise, and non-magnetic cavity gradient calibration. Item #3 above is operationally linked to the RF manipulations involved here.

LERF - S. Benson

  • July 9-20
    • Worked on pCDR editing
    • Completed Quarterly report for 2018 FOA project
    • Held Cooler ring meetings and wrote up minutes.
    • Analyzed use of harmonic RF to enlarge longitudinal acceptance cooler.
    • Wrote up electron cooling section for ICFA BD newsletter
    • Held status meeting for Electron Cooling FOA project
    • Sent out invitation for mini-workshop for ERLs in an EIC
    • Researched application of CSU equipment so that we might keep the CSU laser at the LERF
    • Review GTS magnetized gun paper
  • July 23-Aug. 3
    • Revise LOD for isotope work
    • Attend kickoff meeting for isotope project
    • Analyze CEC study by Stupakov to derive ERL specifications
    • Attend Operations review
    • Try to define HZDR collaboration
    • Write up cooling section of HE-JLEIC appendix

A. Hutton

  • July 9-20
    • Wrote up trip report from “Electrons for the LHC - LHeC/FCCeh and Perle Workshop in Orsay.” Distributed to JLab Directorate and the ALCC (America’s Linear Collider Committee).
    • Provided beam-loss scenarios for PERLE to help them prepare for nuclear regulatory approval.
    • Read and made comments on the JLEIC PreCDR - this will be a weekly responsibility until October. This was detailed comments on the Chapters assigned to me as well as an overview of all the Chapters looking for inconsistencies.
    • Received an invitation for a plenary talk on transverse cavities at the next HL-LHC Collaboration meeting; started laying out the talk and requesting input from the different labs that have been involved.
    • Initiated preparations for a Kick-Off Meeting for the Isotope Project. Completed ~50% of introduction.