Difference between revisions of "2015-07-24 Diagnostic Development Biweekly Report"
Jump to navigation
Jump to search
(Created page with "CASA Diagnostic Development<br> Biweekly Report: 07/11/15 - 07/24/15<br> Submitted by: Pavel Evtushenko<br> M. Tiefenback • finished the paper review • participated in ...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
Submitted by: Pavel Evtushenko<br> | Submitted by: Pavel Evtushenko<br> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | M. Tiefenback<br> | ||
+ | <ul> | ||
+ | <li>finished the paper review | ||
+ | <li>participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task | ||
+ | <li>continuing engagement with turning the multi-pass steering procedure into an operational tool | ||
+ | <li>continuing engagement with hot-wire anemometer mass-flow meter | ||
+ | <li>has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered | ||
+ | <li>About 2.5 days of personal leave time the past week | ||
+ | </ul> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | K. Jordan | + | P. Evtushenko<br> |
− | + | <ul> | |
+ | <li>prepared talk for the S&T review and presented it at the dry run | ||
+ | <li>has completed plan of finishing the early career grant work; | ||
+ | <li>this includes al tasks, personal required for the work, procurement and labor plan | ||
+ | <li>works on various ongoing aspects of the early career grant | ||
+ | <li>large fraction of it - discussions with potential manufacturers of system components | ||
+ | <li>reviewed several revisions of the setup at 1C12 for transverse beam profile measurements | ||
+ | <li>with a combination of SR and OTR; the last revision is declared final | ||
+ | <li>reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design | ||
+ | </ul> | ||
+ | |||
+ | |||
+ | K. Jordan<br> | ||
+ | <ul> | ||
+ | <li>Travel | ||
+ | </ul> |
Latest revision as of 08:58, 31 July 2015
CASA Diagnostic Development
Biweekly Report: 07/11/15 - 07/24/15
Submitted by: Pavel Evtushenko
M. Tiefenback
- finished the paper review
- participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task
- continuing engagement with turning the multi-pass steering procedure into an operational tool
- continuing engagement with hot-wire anemometer mass-flow meter
- has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered
- About 2.5 days of personal leave time the past week
P. Evtushenko
- prepared talk for the S&T review and presented it at the dry run
- has completed plan of finishing the early career grant work;
- this includes al tasks, personal required for the work, procurement and labor plan
- works on various ongoing aspects of the early career grant
- large fraction of it - discussions with potential manufacturers of system components
- reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
- with a combination of SR and OTR; the last revision is declared final
- reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design
K. Jordan
- Travel