(Created page with "CASA Diagnostic Development<br> Biweekly Report: 07/11/15 - 07/24/15<br> Submitted by: Pavel Evtushenko<br> M. Tiefenback • finished the paper review • participated in ...")
 
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
Submitted by:  Pavel Evtushenko<br>
 
Submitted by:  Pavel Evtushenko<br>
  
M. Tiefenback
 
• finished the paper review
 
• participated in the second meeting on CEBAF 5-pass ERL,  received an assignment for diagnostic and measurement integration for this exploratory task
 
• continuing engagement with turning the multi-pass steering procedure into an operational tool
 
• continuing engagement with hot-wire anemometer mass-flow meter
 
• has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered
 
• About 2.5 days of personal leave time the past week
 
  
 +
M. Tiefenback<br>
 +
<ul>
 +
<li>finished the paper review
 +
<li>participated in the second meeting on CEBAF 5-pass ERL,  received an assignment for diagnostic and measurement integration for this exploratory task
 +
<li>continuing engagement with turning the multi-pass steering procedure into an operational tool
 +
<li>continuing engagement with hot-wire anemometer mass-flow meter
 +
<li>has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered
 +
<li>About 2.5 days of personal leave time the past week
 +
</ul>
  
P. Evtushenko
 
• prepared talk for the S&T review and presented it at the dry run
 
• has completed plan of finishing the early career grant work;
 
• this includes al tasks, personal required for the work, procurement and labor plan
 
• works on various ongoing aspects of the early career grant
 
• large fraction of it - discussions with potential manufacturers of system components
 
• reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
 
• with a combination of SR and OTR; the last revision is declared final
 
• reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design
 
  
K. Jordan
+
P. Evtushenko<br>
Travel
+
<ul>
 +
<li>prepared talk for the S&T review and presented it at the dry run
 +
<li>has completed plan of finishing the early career grant work;
 +
<li>this includes al tasks, personal required for the work, procurement and labor plan
 +
<li>works on various ongoing aspects of the early career grant
 +
<li>large fraction of it - discussions with potential manufacturers of system components
 +
<li>reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
 +
<li>with a combination of SR and OTR; the last revision is declared final
 +
<li>reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design
 +
</ul>
 +
 
 +
 
 +
K. Jordan<br>
 +
<ul>
 +
<li>Travel
 +
</ul>

Latest revision as of 08:58, 31 July 2015

CASA Diagnostic Development
Biweekly Report: 07/11/15 - 07/24/15
Submitted by: Pavel Evtushenko


M. Tiefenback

  • finished the paper review
  • participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task
  • continuing engagement with turning the multi-pass steering procedure into an operational tool
  • continuing engagement with hot-wire anemometer mass-flow meter
  • has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered
  • About 2.5 days of personal leave time the past week


P. Evtushenko

  • prepared talk for the S&T review and presented it at the dry run
  • has completed plan of finishing the early career grant work;
  • this includes al tasks, personal required for the work, procurement and labor plan
  • works on various ongoing aspects of the early career grant
  • large fraction of it - discussions with potential manufacturers of system components
  • reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
  • with a combination of SR and OTR; the last revision is declared final
  • reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design


K. Jordan

  • Travel