(Created page with "Jan 7-Jan 18 '''Director - Todd Satogata''' <br> Previous two weeks () - Next two weeks () - Alex Bogacz Previous two weeks () - Next t...")
 
 
(25 intermediate revisions by the same user not shown)
Line 1: Line 1:
Jan 7-Jan 18
+
April 12, 2019 Report - April 1 - April 26
 
 
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
   Previous two weeks ()
+
   Previous two weeks (Apr 1 - Apr 12)
 
       -  
 
       -  
   Next two weeks ()
+
   Next two weeks (Apr 15 - Apr 26)
 
       -  
 
       -  
  
 
Alex Bogacz
 
Alex Bogacz
 
    
 
    
   Previous two weeks ()
+
   Previous two weeks (Apr 1 - Apr 12)
       -  
+
       - Machine support
   Next two weeks ()
+
      - Paper on ‘Dogbone’ ERL for IPAC
       -   
+
      - Finalizing White Paper on Publications and Conferences
 +
      - JLEIC Collab. mgt.
 +
   Next two weeks (Apr 15 - Apr 26)
 +
       - Injector solenoids - importance of uniformity of focusing across the bunch and stray field
 +
      - Finalizing paper on ‘Dogbone’ ERL for IPAC
 +
      - Implementation of new Internal Publication system
 +
      - PRAB paper - review
 +
   
  
 
Rui Li
 
Rui Li
 
    
 
    
   Previous two weeks ()
+
   Previous two weeks (Apr 1 - Apr 12)
       -  
+
       - Participated in the EIC collaboration meeting, presented my talk, and interacted with colleagues
   Next two weeks ()
+
        from different labs
       -   
+
      - Extended discussions with the RF group and John Fox and Dmitry Teytelman on feedback requirements for JLEIC
 +
      - Scheduling the next impedance meeting and update impedance wiki
 +
      - Started collaboration with LBL on impedance and wakefield studies for ALS-U
 +
      - Literature studies on impedances
 +
   Next two weeks (Apr 15 - Apr 26)
 +
       - Continue with broadband impedance study for JLEIC
 +
      - Impedance meeting on 4/22 at 10:30am
 +
      - Review some of the studies on CSR effects
 +
   
  
 
Ed Nissen
 
Ed Nissen
 
    
 
    
   Previous two weeks ()
+
   Previous two weeks (Apr 1 - Apr 12)
       -  
+
       - Attended the JLEIC collaboration meeting
   Next two weeks ()
+
      - Working on ECA application
       -  
+
   Next two weeks (Apr 15 - Apr 26)
 +
       - Continue working on ECA application
 +
      - Finish paper to submit for light peer review at IPAC
  
 
Chris Tennant
 
Chris Tennant
 
    
 
    
   Previous two weeks ()
+
   Previous two weeks (Apr 1 - Apr 12)
       -  
+
      - JLEIC collaboration meeting
   Next two weeks ()
+
      - Finished collecting parameters for updated ERL landscape plot (with help of Peter Williams)
       -
+
      - Met with SLAC representatives about collaborating on their LDRD (ML relating to SRF)
 +
       - Went over SRF classification analysis with Anna and Adam
 +
      - Continue analysis and documentation in TN for SRF classification (text needed for Anna's LDRD,
 +
        IPAC paper and Adam's ICALEPCS paper)
 +
      - Vacation day to attend "Applied Machine Learning Conference" in Charlottesville
 +
   Next two weeks (Apr 15 - Apr 26)
 +
       - Finish(?) TN
  
  
Line 41: Line 63:
  
 
Fanglei Lin
 
Fanglei Lin
  Previous two weeks (Jan 7 - Jan 18)
+
 
    - Optimizing the electron collider ring design with PEP-II magnets
+
  Previous two weeks (Apr 1 - Apr 12)
    - Working on the storage ring cooler project
+
      - Maternity Leave
    - Miscellaneous: attended the spin transparency test teleconference, attended the Pre-CDR Update meeting, attended
+
      - Finished the electron collider ring design
      the JLEIC R&D meeting, attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler
+
      - Updating the pCDR-100 in the electron complex section
      meeting, attended JLEIC general meeting
+
      - Prepared electron ring information to the talk given in the collaboration meeting spring 2019
  Next two weeks (Jan 18 - Feb 1)
+
      - Provided the electron ring magnet information to Leigh and Tim for the cost estimation
    - Work on the electron collider ring design with PEP-II magnets
+
      - Had a discussion and made a plan on the study of electron polarization with colleagues from UNM
    - Work on the storage ring cooler project
+
        and Cornell University
    - Electron spin study using BMAD
+
  Next two weeks (Apr 15 - Apr 26)
 +
      - Maternity Leave
  
 
<br>
 
<br>
 
Vasiliy Morozov
 
Vasiliy Morozov
  Previous two weeks (Jan 7 - Jan 18)
 
    -
 
  Next two weeks (Jan 18 - Feb 1)
 
    -
 
  
 +
  Previous two weeks (Apr 1 - Apr 12)
 +
      - JLEIC collaboration meeting: preparation and presentation of four talks on JLEIC overview, IR design, collider
 +
        ring designs and working group summary, discussions with collaborators. Presentation of the latest JLEIC
 +
        design to NP.
 +
      - Costing and energy upgrade exercises.
 +
      - Ion polarization: spin transparency experiment analysis and simulations, preparation of a paper with Kondratenko.
 +
      - IR design: setting up collider ring simulations in Elegant with Randy.
 +
      - Work on simulations of the longitudinal dynamics in a storage ring cooler with Bhawin.
 +
      - Work on beam-beam simulations with River
 +
  Next two weeks (Apr 15 - Apr 26)
 +
      - Costing exercise.
 +
      - Preparation of the DoE quarterly reports.
 +
      - Work on the spin transparency experiment and polarization papers
 +
      - Completion of the pCDR.
 +
      - Collider ring design and simulations.
 +
 
 
<br>
 
<br>
 
Amy Sy
 
Amy Sy
Previous two weeks (Jan 7 - Jan 18)
 
    -
 
  Next two weeks (Jan 18 - Feb 1)
 
    -
 
  
 +
  Previous two weeks (Apr 1 - Apr 12)
 +
      - Attended JLEIC collaboration meeting.
 +
      - Continued work on early career proposal.
 +
      - Participated in commissioning of laser-driven polarized proton source at FZ Juelich. Testing Lamb-shift
 +
        polarimeter
 +
        with unpolarized pulsed proton beam.
 +
      - Summarized longitudinal Schottky signal analysis work on IMP experiment data for quarterly report.
 +
  Next two weeks (Apr 15 - Apr 26)
 +
      - Continued work on early career proposal.
 +
      - Continued participation in experiments with Lamb-shift polarimeters at FZ Juelich.
 +
 
<br>
 
<br>
 +
Yuhong Zhang
  
 +
  Previous two weeks (Apr 1 - Apr 12)
 +
      - Organized and attended JLEIC collaboration meeting.
 +
      - Met with various visitors during the week of the collaboration meeting
 +
      - Activites supporting the cost exercises (design and risk factors)
 +
      - Worked on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
 +
  Next two weeks (Apr 15 - Apr 26)
 +
      - Continue work on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
 +
 +
<br>
  
 
----
 
----
Line 91: Line 143:
 
<br>
 
<br>
 
He Zhang
 
He Zhang
     Previous two weeks (Jan 7 - Jan 18)
+
 
       - Development of JSPEC code
+
     Previous two weeks (Apr 1 - Apr 12)
       - DeCooling Rate Calculation for JLEIC with New Parameters
+
       - MAD-X 5D Map tracking code has been sent to Yun Luo and Ji Qiang
      - BeamBeam3D
+
       - Working on JSPEC development
       - River helped me to repeat Sergei’s deriving of the Bjorken and Mtingwa (BM) formula for the IBS rate calculation
+
    Next two weeks (Apr 15 - Apr 26)
        using the elliptical integral and to check whether we can extend Sergei’s method on a general case including
+
       - Enhance the luminosity module of JSPEC
        vertical dispersion and all the missing terms in the oringal BM formula. Our current conclusion is the total rate,
+
      - Simulation on dispersive cooling
        summation of the rates in all the three directions, can be calculated using Sergei’s formula, as long as we calculate
+
 
        the eigenvalue of the I matrix, which is related to the dispersion matrix, numerically. Since the I matrix is a
+
<br>
        symmetric real matrix, its eigenvalues can be calculated using some routine algorithm. We failed to find the explicit
+
River Huang
        formula for the rate in each individual direction. To find the formula, we need explicit expression of the
+
 
        eigenvalue, which does not exist for a general matrix I. I have an idea of decompose the I matrix into three parts,
+
     Previous two weeks (Apr 1 - Apr 12)
        treat them separately and take the summation. But I am not positive this method gives correct or approximate answer.
+
       - “CASA Beam-Beam” update: Updated the interface between ““CASA Beam-Beam” and “Elegant””: the interface-script
     Next two weeks (Jan 18 - Feb 1)
+
        file under Linux system was translated by python and the python code was added to “CASA Beam-Beam”. Now
       - The core-tail model for non-Gaussian IBS is in process
+
        “CASA Beam-Beam” can generate “mtr” and “lte” format-file automatically; “CASA Beam-Beam” can automatically
      - Finish space charge effect in friction force calculation
+
        generate “ele” files of Elegant command, again, the results of “CASA Beam-Beam” can be used for beam-beam  
      - Continue documenting JSPEC development
+
        interaction in Elegant as well. Optimized the demonstration windows of “CASA Beam-Beam” GUI so that the user
      - Electron beam Space charge effect on friction force calculation is in process.
+
        can review numerical results; added the script commands into “CASA Beam-Beam” to plot/save the figure of “Spin
      - Cooling Rate Calculation for JLEIC with New Parameters
+
        Response Function”.
      - In the new parameter set of JLEIC, the proton beam emittance and bunch length at the collision energy have been
+
      - Simulating and studying - We are simulating and studying the effect on bunch length due to synchrotron tune via
        increased to mitigate the severe IBS effect. For the 63.3 GeV CM energy case, the collision frequency has been
+
        both CASA beam-Beam and BeamBeam3D.
        changed back to 442 MHz, hence the charges per bunch has been significantly reduced, which helps to achieve a
+
      - Attended “JLEIC collaboration meeting,” reported on "Update on JLEIC Ion Polarization and Spin
        milder IBS effect. The cooling rate and the IBS rate are calculated for both the 44.7 GeV CM energy and the 63.3
+
        Transparent Experiment"
        CM energy. 3.2 nC/bunch electrons provide enough cooling for both case. The challenge is still the distribution of
+
      - Reported on “Update on JLEIC Ion Polarization and Spin Transparent Experiment”.
        the cooling. As usual, we have very strong IBS effect in the horizontal direction and very strong cooling effect in
+
     Next two weeks (Apr 15 - Apr 26)
        the vertical and longitudinal direction.
+
      - Continue to simulate of the zero-integer spin resonance strength and analyze the results;
      - BeamBeam3D
+
      - Study and simulate “Beam-Beam effect”;
      - Yu Luo send me the MAD-X lattice file for RHIC at 250 GeV. With Vascily’s help, I am able to generate the truncated
+
      - Prepare the poster for IPAC19.
        map using the PTC package in MAD-X. This lattice file does not include any RF cavity, so the 4D truncated maps are
 
        generated. When tracking up to 1 million turns with a 2nd order map, phase space increase happens. When we perform
 
        symplectic tracking using our codes, the phase space volume conserves in the 1 million turns. All four kinds of
 
        generating functions have been tested and they all work as expected. When using the 3rd order truncated map in
 
        tracking, no noticeable phase space distortion is observed in up to 1 billion turns. This may be because that this
 
        lattice does not include the high nonlinear sections, such as the interacting region.  
 
     Others
 
      - Write for three FOA quarterly reports
 
      - Work plan in the following two weeks
 
      - Finish the core-tail model.
 
      - Finish space charge effect in friction force calculation.
 
      - Continue documenting JSPEC development.
 
  
  
Line 136: Line 176:
 
----
 
----
 
'''Diagnostic Development - Kevin Jordan''' <br>
 
'''Diagnostic Development - Kevin Jordan''' <br>
  Previous two weeks (Jan 7 - Jan 18)
 
    - LCLS-II; Preparing for cooldown! There were issues with big bellows leaking at the cryocan connection
 
    - Working on isotope beamline installation & restoration
 
    - Invited to Program committee for IBIC 2019
 
    - Invited to Machine Advisory Committee for Canadian Light Source
 
  Next two weeks (Jan 18 - Feb 1)
 
    - Cooldown 2 LCLS-II cryomodules
 
    - Take vacation to install our kinetic art with George Neil in Toronto - [https://www.torontolightfest.com/]
 
  
 +
    Previous two weeks (Apr 1 - Apr 12)
 +
      - Attended an ARIES sponsored workshop on scintillating screens, cameras & optics.
 +
      - Working on getting power setup for Magnetron Project. This will be done in Lab 1 of the LERF. Within the next
 +
        few weeks the first of two transmitters will arrive and be installed in the LERF.
 +
      - Mounted a BNNT Halo monitor screen for the Isotope beam line run the LERF, also worked to get beam to 0G dump
 +
        and to the 1G dump. Initially the vacuum system was not ready then we were all ready & the drive laser would
 +
        not stay locked. There were a num bet of items on HCO that were signed off but not operational. We will try to
 +
        run to the 1G dump in ~6 weeks when we are back at 2K.
 +
      - Working with Joe & Mike to get the first SLM installed in Arc 7 during the SAD. I also mounted a BNNT flag as
 +
        a part of this installation.
 +
      - Attending a meeting at ODU about hope to better work together on common projects with the school of engineering.
 +
      - Finishing up some IBIC program details for this fall’s conference.
 +
      - Spent some time on the IPM gun pulser design for the 300 kV experiment.
 +
    Next two weeks (Apr 15 - Apr 26)
 +
      -
  
  
 
Joe Gubeli
 
Joe Gubeli
  Previous two weeks (Jan 7 - Jan 18)
 
    - Worked with several groups in preparing the two LCLS-II CMs for cool down. With a lot of help we were able to
 
      successfully cool them both down to 4K and collect liquid.
 
    - Completed the design of a new x-ray insertable viewer for the Bubble experiment in the 5D line. Most of the parts have
 
      arrived and I have submitted drawings to the MS for fabrication.
 
    - I have received the four new chambers for the Arc 7 SLMs, they look really nice. I submitted the chamber support
 
      drawings for one set to the MS and they are awaiting signatures. Hint-hint.
 
    - I work with Jianxun Yan on moving a linear motor with EPICS. After getting all of the parameters both in firmware and
 
      in EPICS correct we were able to move the motor smoothly. A similar motor on a linear slide will be used for
 
      Radiabeam's high power-high speed wire scanner (HSHPWS) to be installed in the BSY.
 
  Next two weeks (Jan 18 - Feb 1)
 
    - Some time on the HWHPWS in preparing a presentation for OPS and in helping Jianxun.
 
    - Most of the time will be spent in designing the shielding (with a movable wall and target) for the Isotope project. I
 
      will also need to work some on thermal simulations for this project as well.
 
    - I will also be helping with Hot Checkout of the LERF, mainly with the viewers. The video switch partially works and we
 
      have no trigger so no Beaminizer.
 
  
 +
    Previous two weeks (Apr 1 - Apr 12)
 +
      - Finished and implemented the new optical layout of ARC 7 SLM. We now have a filter wheel in front of the first
 +
        optic as Mike T. asked for the second filter wheel is 90mm upstream of the third filter wheel which is located at
 +
        the field stop. The first wheel will contain the slits. I am waiting on input from Mike T. on the width and
 +
        offset of the five different slits that will be installed here. The second wheel will contain bandpass filters
 +
        for short and long visible wavelengths along with a vertical and a horizontal polarizer. The last wheel contains
 +
        neutral density filters. Met with Steve S. and Keith C. at the installation location. Steve said he will approve
 +
        the installation but hasn’t yet updated the Atlis.
 +
      - Spent time working on the Beamenizer after we found the system not working when running to the 0G dump. I created
 +
        a test fixture and after a timing board repair I was able to verify the system now works.
 +
    Next two weeks (Apr 15 - Apr 26)
 +
      - VACATION - 1 week
 +
      - Prepare and install the ARC 7 SLM.
 +
 +
 +
Michael Tiefenback
 +
 +
    Previous two weeks (Apr 1 - Apr 12)
 +
      - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
 +
      - Specify depth of field limiting slit widths for Arc 7 SLM
 +
      - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
 +
      - Planning for overall diagnostic system integration, including periodic calibration requirements
 +
    Next two weeks (Apr 15 - Apr 26)
 +
      - model SyncLightMonitor matching process for arcs
 +
      - Review field map updates for Moller quads requested by Benesch
 +
      - Continue on 4) above (diagnostic system integration)
  
  
Line 170: Line 227:
 
'''LERF - Steve Benson''' <br>
 
'''LERF - Steve Benson''' <br>
 
   
 
   
  Previous two weeks (Jan 7 - Jan 18)
+
    Previous two weeks (Apr 1 - Apr 12)
       - Interviewed one candidate for postdoctoral position
+
       - Attended the Spring JLEIC Collaboration meeting and hosted the cooling working group.
       - Wrote up draft of quarterly report for FOA project
+
       - Presented Cooler ring status presentation at the collaboration meeting.
       - Met with SRF to develop harmonic kicker purchasing strategy.
+
       - Completed run plan for running beam to the 1G dump.
       - Met with seminar committee to get new member and schedule new talks
+
       - Tried to run beam to the 1G dump but the drive laser failed so no beam was run.
      - Recruited invited talks for the High Brightness Beams 2019 workshop and the FEL 2019 conference
+
       - Hosted Cooling ring  and FOA status meeting and wrote up minutes.
       - Derived new linac layout for the cooling ERL for Pre-CDR-100.
+
       - Rewrote and submitted the LOSP for the drive laser alignment in the LERF vault.
       - Met with CSI personnel to derive specifications for LERF commissioning specifications
+
    Next two weeks (Apr 15 - Apr 26)
  Next two weeks (Jan 18 - Feb 1)
+
      - Complete the quarterly report for the FOA Cooling project.
 +
      - Complete the budget for the Isotope project quarterly.
 
       - Submit new text for LOD and safety envelope for LERF.
 
       - Submit new text for LOD and safety envelope for LERF.
       - Summarize the ERLs for EIC workshop.  
+
       - Summarize the ERLs for EIC workshop.
      - Write up budget for Isotope quarterly report.
 
      - Submit quarterly reports for FOA and Isotope project.
 
      - Review coherent cooling literature and establish specification baseline
 

Latest revision as of 10:08, 29 May 2019

April 12, 2019 Report - April 1 - April 26 Director - Todd Satogata

  Previous two weeks (Apr 1 - Apr 12)
     - 
  Next two weeks (Apr 15 - Apr 26)
     - 

Alex Bogacz

  Previous two weeks (Apr 1 - Apr 12)
     - Machine support 
     - Paper on ‘Dogbone’ ERL for IPAC
     - Finalizing White Paper on Publications and Conferences
     - JLEIC Collab. mgt.
  Next two weeks (Apr 15 - Apr 26)
     - Injector solenoids - importance of uniformity of focusing across the bunch and stray field 
     - Finalizing paper on ‘Dogbone’ ERL for IPAC
     - Implementation of new Internal Publication system
     - PRAB paper - review

Rui Li

  Previous two weeks (Apr 1 - Apr 12)
     - Participated in the EIC collaboration meeting, presented my talk, and interacted with colleagues 
       from different labs
     - Extended discussions with the RF group and John Fox and Dmitry Teytelman on feedback requirements for JLEIC
     - Scheduling the next impedance meeting and update impedance wiki 
     - Started collaboration with LBL on impedance and wakefield studies for ALS-U
     - Literature studies on impedances
  Next two weeks (Apr 15 - Apr 26)
     - Continue with broadband impedance study for JLEIC
     - Impedance meeting on 4/22 at 10:30am
     - Review some of the studies on CSR effects 

Ed Nissen

  Previous two weeks (Apr 1 - Apr 12)
     - Attended the JLEIC collaboration meeting 
     - Working on ECA application
  Next two weeks (Apr 15 - Apr 26)
     - Continue working on ECA application
     - Finish paper to submit for light peer review at IPAC

Chris Tennant

  Previous two weeks (Apr 1 - Apr 12)
     - JLEIC collaboration meeting
     - Finished collecting parameters for updated ERL landscape plot (with help of Peter Williams)
     - Met with SLAC representatives about collaborating on their LDRD (ML relating to SRF)
     - Went over SRF classification analysis with Anna and Adam
     - Continue analysis and documentation in TN for SRF classification (text needed for Anna's LDRD, 
       IPAC paper and Adam's ICALEPCS paper)
     - Vacation day to attend "Applied Machine Learning Conference" in Charlottesville
  Next two weeks (Apr 15 - Apr 26)
     - Finish(?) TN



Accelerator R & D - Yuhong Zhang

Fanglei Lin

  Previous two weeks (Apr 1 - Apr 12)
     - Maternity Leave
     - Finished the electron collider ring design
     - Updating the pCDR-100 in the electron complex section
     - Prepared electron ring information to the talk given in the collaboration meeting spring 2019 
     - Provided the electron ring magnet information to Leigh and Tim for the cost estimation
     - Had a discussion and made a plan on the study of electron polarization with colleagues from UNM 
       and Cornell University 
  Next two weeks (Apr 15 - Apr 26)
     - Maternity Leave


Vasiliy Morozov

  Previous two weeks (Apr 1 - Apr 12)
     - JLEIC collaboration meeting: preparation and presentation of four talks on JLEIC overview, IR design, collider
       ring designs and working group summary, discussions with collaborators. Presentation of the latest JLEIC 
       design to NP.
     - Costing and energy upgrade exercises.
     - Ion polarization: spin transparency experiment analysis and simulations, preparation of a paper with Kondratenko.
     - IR design: setting up collider ring simulations in Elegant with Randy.
     - Work on simulations of the longitudinal dynamics in a storage ring cooler with Bhawin.
     - Work on beam-beam simulations with River
  Next two weeks (Apr 15 - Apr 26)
     - Costing exercise.
     - Preparation of the DoE quarterly reports.
     - Work on the spin transparency experiment and polarization papers
     - Completion of the pCDR.
     - Collider ring design and simulations.
 


Amy Sy

  Previous two weeks (Apr 1 - Apr 12)
     - Attended JLEIC collaboration meeting.
     - Continued work on early career proposal.
     - Participated in commissioning of laser-driven polarized proton source at FZ Juelich. Testing Lamb-shift
       polarimeter
       with unpolarized pulsed proton beam.
     - Summarized longitudinal Schottky signal analysis work on IMP experiment data for quarterly report.
  Next two weeks (Apr 15 - Apr 26)
     - Continued work on early career proposal.
     - Continued participation in experiments with Lamb-shift polarimeters at FZ Juelich.


Yuhong Zhang

  Previous two weeks (Apr 1 - Apr 12)
     - Organized and attended JLEIC collaboration meeting.
     - Met with various visitors during the week of the collaboration meeting
     - Activites supporting the cost exercises (design and risk factors)
     - Worked on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
  Next two weeks (Apr 15 - Apr 26)
     - Continue work on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC



Computational Physics - Yves Roblin
Yves Roblin

   CEBAF
     - Prepare for machine startup.
     - Preparing talk to Hall A collaboration.
     - Completed TOSP for Hall A Apex Experiment
     - Developing method to center solenoids (in particular 
        Hall A moeller solenoid)
     - BTEAM
    JLEIC:   
     - Reviewing Implications of the 100 GeV CM setup for BeamBeam   
   OTHER
     - Attended workshop on ML
     - Conducted interviews for postdoc position
     - TRC meetings
     - FOA reports.
     - Evaluating various Python frameworks for ML and GA (DEAP,        pyEVOLVE)


He Zhang

   Previous two weeks (Apr 1 - Apr 12)
     - MAD-X 5D Map tracking code has been sent to Yun Luo and Ji Qiang
     - Working on JSPEC development
   Next two weeks (Apr 15 - Apr 26)
     - Enhance the luminosity module of JSPEC
     - Simulation on dispersive cooling


River Huang

   Previous two weeks (Apr 1 - Apr 12)
     - “CASA Beam-Beam” update: Updated the interface between ““CASA Beam-Beam” and “Elegant””: the interface-script 
        file under Linux system was translated by python and the python code was added to “CASA Beam-Beam”. Now 
        “CASA Beam-Beam” can generate “mtr” and “lte” format-file automatically; “CASA Beam-Beam” can automatically
        generate “ele” files of Elegant command, again, the results of “CASA Beam-Beam” can be used for beam-beam 
        interaction in Elegant as well. Optimized the demonstration windows of “CASA Beam-Beam” GUI so that the user
        can review numerical results; added the script commands into “CASA Beam-Beam” to plot/save the figure of “Spin
        Response Function”.
      - Simulating and studying - We are simulating and studying the effect on bunch length due to synchrotron tune via 
        both CASA beam-Beam and BeamBeam3D.
      - Attended “JLEIC collaboration meeting,” reported on "Update on JLEIC Ion Polarization and Spin 
        Transparent Experiment"
      - Reported on “Update on JLEIC Ion Polarization and Spin Transparent Experiment”.
   Next two weeks (Apr 15 - Apr 26)
      - Continue to simulate of the zero-integer spin resonance strength and analyze the results;
      - Study and simulate “Beam-Beam effect”;
      - Prepare the poster for IPAC19.



Diagnostic Development - Kevin Jordan

   Previous two weeks (Apr 1 - Apr 12)
     - Attended an ARIES sponsored workshop on scintillating screens, cameras & optics.
     - Working on getting power setup for Magnetron Project. This will be done in Lab 1 of the LERF. Within the next
       few weeks the first of two transmitters will arrive and be installed in the LERF.
     - Mounted a BNNT Halo monitor screen for the Isotope beam line run the LERF, also worked to get beam to 0G dump 
       and to the 1G dump. Initially the vacuum system was not ready then we were all ready & the drive laser would 
       not stay locked. There were a num bet of items on HCO that were signed off but not operational. We will try to 
       run to the 1G dump in ~6 weeks when we are back at 2K.
     - Working with Joe & Mike to get the first SLM installed in Arc 7 during the SAD. I also mounted a BNNT flag as 
       a part of this installation. 
     - Attending a meeting at ODU about hope to better work together on common projects with the school of engineering.
     - Finishing up some IBIC program details for this fall’s conference.
     - Spent some time on the IPM gun pulser design for the 300 kV experiment.
   Next two weeks (Apr 15 - Apr 26)
     - 


Joe Gubeli

   Previous two weeks (Apr 1 - Apr 12)
     - Finished and implemented the new optical layout of ARC 7 SLM. We now have a filter wheel in front of the first
       optic as Mike T. asked for the second filter wheel is 90mm upstream of the third filter wheel which is located at
       the field stop. The first wheel will contain the slits. I am waiting on input from Mike T. on the width and 
       offset of the five different slits that will be installed here. The second wheel will contain bandpass filters 
       for short and long visible wavelengths along with a vertical and a horizontal polarizer. The last wheel contains
       neutral density filters. Met with Steve S. and Keith C. at the installation location. Steve said he will approve
       the installation but hasn’t yet updated the Atlis.
     - Spent time working on the Beamenizer after we found the system not working when running to the 0G dump. I created
       a test fixture and after a timing board repair I was able to verify the system now works.
   Next two weeks (Apr 15 - Apr 26)
     - VACATION - 1 week
     - Prepare and install the ARC 7 SLM.


Michael Tiefenback

   Previous two weeks (Apr 1 - Apr 12)
     - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
     - Specify depth of field limiting slit widths for Arc 7 SLM
     - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
     - Planning for overall diagnostic system integration, including periodic calibration requirements
   Next two weeks (Apr 15 - Apr 26)
     - model SyncLightMonitor matching process for arcs
     - Review field map updates for Moller quads requested by Benesch
     - Continue on 4) above (diagnostic system integration)



LERF - Steve Benson

   Previous two weeks (Apr 1 - Apr 12)
     - Attended the Spring JLEIC Collaboration meeting and hosted the cooling working group. 
     - Presented Cooler ring status presentation at the collaboration meeting. 
     - Completed run plan for running beam to the 1G dump.
     - Tried to run beam to the 1G dump but the drive laser failed so no beam was run. 
     - Hosted Cooling ring  and FOA status meeting and wrote up minutes.
     - Rewrote and submitted the LOSP for the drive laser alignment in the LERF vault.
   Next two weeks (Apr 15 - Apr 26)
     - Complete the quarterly report for the FOA Cooling project.
     - Complete the budget for the Isotope project quarterly.
     - Submit new text for LOD and safety envelope for LERF.
     - Summarize the ERLs for EIC workshop.