(Created page with "April 15, 2019 Report - April 1 - April 26 '''Director - Todd Satogata''' <br> Previous two weeks (Apr 1 - Apr 12) - Next two weeks (Apr 15 - Apr 25) -...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
April 15, 2019 Report - April 1 - April 26
+
April 15, 2019 Report - April 15 - May 10
  
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
 
       -  
 
       -  
   Next two weeks (Apr 15 - Apr 25)
+
   Next two weeks (Apr 29 - May 10)
 
       -  
 
       -  
  
 
Alex Bogacz
 
Alex Bogacz
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Machine support
+
       -  
      - Paper on ‘Dogbone’ ERL for IPAC
+
   Next two weeks (Apr 29 - May 10)
      - Finalizing White Paper on Publications and Conferences
+
       -
      - JLEIC Collab. mgt.
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Injector solenoids - importance of uniformity of focusing across the bunch and stray field
 
      - Finalizing paper on ‘Dogbone’ ERL for IPAC
 
      - Implementation of new Internal Publication system
 
      - PRAB paper - review
 
 
   
 
   
  
 
Rui Li
 
Rui Li
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Participated in the EIC collaboration meeting, presented my talk, and interacted with colleagues from different labs
+
       - Going over diffraction model of impedance theory and prepare slides for the JLEIC impedance meeting
       - Extended discussions with the RF group and John Fox and Dmitry Teytelman on feedback requirements for JLEIC
+
      - Remotely participate ALS-U impedance meeting and held interesting discussions on CST simulations
       - Scheduling the next impedance meeting and update impedance wiki  
+
      - Held monthly JLEIC impedance meeting
       - Started collaboration with LBL on impedance and wakefield studies for ALS-U
+
      - Present overview of diffraction model of broadband impedance
 +
      - Introduce to the team about ALS-U collaboration
 +
       - Review some of the studies on CSR effects
 +
  Next two weeks (Apr 29 - May 10)
 +
       - Scheduling the next impedance meeting and update JLAB impedance wiki  
 +
       - Further assisting the JLAB impedance team participation of the ALS-U impedance collaboration meeting,
 +
        by asking ALS-U team to change meeting time so other JLAB members can participate
 
       - Literature studies on impedances
 
       - Literature studies on impedances
  Next two weeks (Apr 15 - Apr 25)
+
       - Calculate Resistive wall impedance in JLEIC rings
       - Continue with broadband impedance study for JLEIC
 
      - Impedance meeting on 4/22 at 10:30am
 
 
       - Review some of the studies on CSR effects  
 
       - Review some of the studies on CSR effects  
 +
 
   
 
   
  
 
Ed Nissen
 
Ed Nissen
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
      - Attended the JLEIC collaboration meeting
+
       - Working on my Early Career Award which I submitted on Monday April 29.
       - Working on ECA application
+
   Next two weeks (Apr 29 - May 10)
   Next two weeks (Apr 15 - Apr 25)
+
       - Working on my papers and posters for IPAC
       - Continue working on ECA application
 
      - Finish paper to submit for light peer review at IPAC
 
  
 
Chris Tennant
 
Chris Tennant
 
    
 
    
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
      - JLEIC collaboration meeting
+
       -  
      - Finished collecting parameters for updated ERL landscape plot (with help of Peter Williams)
+
   Next two weeks (Apr 29 - May 10)
       - Met with SLAC representatives about collaborating on their LDRD (ML relating to SRF)
+
       -
      - Went over SRF classification analysis with Anna and Adam
 
      - Continue analysis and documentation in TN for SRF classification (text needed for Anna's LDRD, IPAC paper and Adam's
 
        ICALEPCS paper)
 
      - Vacation day to attend "Applied Machine Learning Conference" in Charlottesville
 
   Next two weeks (Apr 15 - Apr 25)
 
       - Finish(?) TN
 
  
  
Line 64: Line 55:
 
Fanglei Lin
 
Fanglei Lin
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Maternity Leave
+
       - Took one-week maternity leave
       - Finished the electron collider ring design
+
       - Updating the electron collider ring section in the pCDR-100
       - Updating the pCDR-100 in the electron complex section
+
       - Working on the storage ring cooler project
       - Prepared electron ring information to the talk given in the collaboration meeting spring 2019
+
  Next two weeks (Apr 29 - May 10)
       - Provided the electron ring magnet information to Leigh and Tim for the cost estimation
+
       - Update the pCDR-100
       - Had a discussion and made a plan on the study of electron polarization with colleagues from UNM and Cornell University
+
       - Work on the spin transparence simulation for ions and spin matching for electrons
  Next two weeks (Apr 15 - Apr 25)
+
       - Work on the storage ring cooler project
      - Maternity Leave
+
 
  
 
<br>
 
<br>
 
Vasiliy Morozov
 
Vasiliy Morozov
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - JLEIC collaboration meeting: preparation and presentation of four talks on JLEIC overview, IR design, collider ring
+
       - Preparation of the DoE quarterly reports: they were submitted on April 26
        designs and working group summary, discussions with collaborators. Presentation of the latest JLEIC design to NP.
+
       - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper
      - Costing and energy upgrade exercises.
+
       - Two-energy storage ring cooler: study of stability of the longitudinal dynamics
       - Ion polarization: spin transparency experiment analysis and simulations, preparation of a paper with Kondratenko.
+
   Next two weeks (Apr 29 - May 10)
       - IR design: setting up collider ring simulations in Elegant with Randy.
+
       - Preparation of IPAC'18 papers
      - Work on simulations of the longitudinal dynamics in a storage ring cooler with Bhawin.
+
       - Pre-CDR update
      - Work on beam-beam simulations with River
+
   Next two weeks (Apr 15 - Apr 25)
 
      - Costing exercise.
 
       - Preparation of the DoE quarterly reports.
 
      - Work on the spin transparency experiment and polarization papers
 
       - Completion of the pCDR.
 
      - Collider ring design and simulations.
 
 
 
 
<br>
 
<br>
 
Amy Sy
 
Amy Sy
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
      - Attended JLEIC collaboration meeting.
+
       - Participated in commissioning of laser-driven polarized proton source at FZ Juelich.  
      - Continued work on early career proposal.
+
        Testing Lamb-shift polarimeter with unpolarized pulsed proton beam.
       - Participated in commissioning of laser-driven polarized proton source at FZ Juelich. Testing Lamb-shift polarimeter
+
       - Finalized early career proposal - to be submitted today.
        with unpolarized pulsed proton beam.
+
      - Conversion of linac lattice from TRACK to PyORBIT. Added solenoid element in PyORBIT linac tools
       - Summarized longitudinal Schottky signal analysis work on IMP experiment data for quarterly report.
+
        (solenoid previously only existed in ring lattice tools).
   Next two weeks (Apr 15 - Apr 25)
+
      - Discussion on data from December 2018 IMP bunched beam cooling experiment.
       - Continued work on early career proposal.
+
   Next two weeks (Apr 29 - May 10)
       - Continued participation in experiments with Lamb-shift polarimeters at FZ Juelich.
+
       - Longitudinal Schottky signal analysis of remaining data from December 2018 IMP bunched beam cooling experiment.
 +
       - Continued work on conversion of light ion linac lattice from TRACK to PyORBIT.
 +
 
 
   
 
   
 
<br>
 
<br>
 
Yuhong Zhang
 
Yuhong Zhang
  
   Previous two weeks (Apr 1 - Apr 12)
+
   Previous two weeks (Apr 15 - Apr 26)
       - Organized and attended JLEIC collaboration meeting.
+
       - Estimated JLEIC luminosity up to 140 GeV CM
       - Met with various visitors during the week of the collaboration meeting
+
      - Prepared FOA quarterly report
       - Activites supporting the cost exercises (design and risk factors)
+
       - Read and commented JLEIC document
       - Worked on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
+
       - Hosted Lijun Mao's visit and worked on cooling experiment
   Next two weeks (Apr 15 - Apr 25)
+
       - Worked on IPAC posters         
       - Continue work on various parts of the JLEIC design, particularly 140 GeV high energy JLEIC
+
   Next two weeks (Apr 29 - May 10)
 +
       -
 
   
 
   
 
<br>
 
<br>
Line 122: Line 109:
 
Yves Roblin
 
Yves Roblin
 
     CEBAF
 
     CEBAF
       - Prepare for machine startup.
+
       - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt
      - Preparing talk to Hall A collaboration.
+
        optics to the gradient profile of the linac prior to starting ORFP.
      - Completed TOSP for Hall A Apex Experiment
 
      - Developing method to center solenoids (in particular
 
        Hall A moeller solenoid)
 
      - BTEAM
 
 
     JLEIC:   
 
     JLEIC:   
       - Reviewing Implications of the 100 GeV CM setup for BeamBeam 
+
       - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA.
 +
      - Writing tech note on the implementation of IR multipole kicks in BB3D.
 +
      - Gave a presentation on the status of the beam-beam for the new pCDR100 optics
 
     OTHER
 
     OTHER
       - Attended workshop on ML
+
       - Attended the ML seminar
       - Conducted interviews for postdoc position
+
       - Starting to work on the use of deep learning networks for CEBAF (matching with sync light )
       - TRC meetings
+
    Next two weeks (Apr 29 - May 10)
       - FOA reports.
+
      - Fiish tech note on the IR multipole kicks implementation
       - Evaluating various Python frameworks for ML and GA (DEAP,        pyEVOLVE)
+
       - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks
+
       - Work on a model for a landau cavity (its 3rd quarter of FOA)
 +
       - Work on optics for the summer run (CEBAF)
 +
 
  
 
<br>
 
<br>
 
He Zhang
 
He Zhang
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
       - MAD-X 5D Map tracking code has been sent to Yun Luo and Ji Qiang
+
       - MAD-X 5d Map tracking
       - Working on JSPEC development
+
       - JSPEC development
     Next two weeks (Apr 15 - Apr 25)
+
     Next two weeks (Apr 29 - May 10)
       - Enhance the luminosity module of JSPEC
+
      - Update the manual for the luminosity module.
       - Simulation on dispersive cooling
+
      - Dispersive cooling (New friction force  formulas and benchmark with theory).
 +
 
 +
<br>
 +
River Huang
 +
 
 +
    Previous two weeks (Apr 15 - Apr 26)
 +
       - “CASA Beam-Beam” Updated the calculation code based on the optimized formula of the spin response function.
 +
       - Studying of the zero-integer spin resonance strength. From 23.0GeV, 23.1GeV, 23,2GeV, …, till to 320GeV, the
 +
        performance of the zero-integer spin resonance strength has been implemented by the updated CASA Beam-Beam code.
 +
        The numerical result was analyzed in our team will be demonstrated on IPAC19 pear review paper.
 +
      - Crab kicking combined with Elegant - We are still simulating and studying the Crab Kicking and Beam-Beam via CASA
 +
        beam-Beam, BeamBeam3D and Elegant. The benchmark will be demonstrated in IPAC19 poster and the paper.
 +
    Next two weeks (Apr 29 - May 10)
 +
      - Prepare the poster for IPAC19.
 +
      - Spin tracking.
  
  
Line 153: Line 154:
 
'''Diagnostic Development - Kevin Jordan''' <br>
 
'''Diagnostic Development - Kevin Jordan''' <br>
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
       - Attended an ARIES sponsored workshop on scintillating screens, cameras & optics.
+
       - Had power installed for high efficiency magnetron project; the first of two will arrive in  
      - Working on getting power setup for Magnetron Project. This will be done in Lab 1 of the LERF. Within the next
+
        a couple weeks. The 480 VAC was tied in to where the Dark light solenoid PS was located. The
        few weeks the first of two transmitters will arrive and be installed in the LERF.
+
         work will be done in the LERF lab 1.
      - Mounted a BNNT Halo monitor screen for the Isotope beam line run the LERF, also worked to get beam to 0G dump
+
       - Prepared & installed BNNT flag at 7A08, also had discussions on nomenclature & CED - the name
        and to the 1G dump. Initially the vacuum system was not ready then we were all ready & the drive laser would not stay
+
         of a viewer is based on flag material; OTR/YAG or ’normal’ (Chromox)
        locked.  
+
       - Worked with Joe on Isotope shielding
         There were a num bet of items on HCO that were signed off but not operational. We will try to run to the 1G dump in ~6
+
       - Finished CRADA for Halo monitor SBIR
        weeks when we
+
       - Preparing for LCLS-II cryomodule swap
        are back at 2K.
+
     Next two weeks (Apr 29 - May 10)
       - Working with Joe & Mike to get the first SLM installed in Arc 7 during the SAD. I also mounted a BNNT flag as a part
+
       - Attend the Canadian Light Source MAC meeting
         of this installation.
+
      - Continue with the prep for the magnetron transmitter
       - Attending a meeting at ODU about hope to better work together on common projects with the school of engineering.
+
      - Mount the Tungsten radiator on water cooled copper for Isotope project
       - Finishing up some IBIC program details for this fall’s conference.
+
 
       - Spent some time on the IPM gun pulser design for the 300 kV experiment.
 
     Next two weeks (Apr 15 - Apr 25)
 
       -  
 
  
  
 
Joe Gubeli
 
Joe Gubeli
  
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
       - Finished and implemented the new optical layout of ARC 7 SLM. We now have a filter wheel in front of the first optic
+
       - ARC 7 SLM installation and alignment. The install went extremely well and S&A in nearly done with aligning.
        as Mike T. asked for the second filter wheel is 90mm upstream of the third filter wheel which is located at the field
+
      - Finished the design of the Isotope shielding – a much simpler and cheaper design See picture below.
        stop. The first wheel will contain the slits. I am waiting on input from Mike T. on the width and offset of the five
+
      - Have a tentative plan to wire up the HPWS
        different slits that will be installed here. The second wheel will contain bandpass filters for short and long visible
+
    Next two weeks (Apr 29 - May 10)
        wavelengths along with a vertical and a horizontal polarizer. The last wheel contains neutral density filters. Met
+
      - Finish the Isotope Shielding presentation
        with Steve S. and Keith C. at the installation location. Steve said he will approve the installation but hasn’t yet
+
      - Help with the wiring, testing and reconfiguration (changing of input direction) of the HPWS
        updated the Atlis.
+
      - Prepare LDRDS for FAST if we get installation approval
       - Spent time working on the Beamenizer after we found the system not working when running to the 0G dump. I created a
+
 
        test fixture and
+
 
        after a timing board repair I was able to verify the system now works.
+
 
     Next two weeks (Apr 15 - Apr 25)
+
Michael Tiefenback
       - VACATION - 1 week
+
 
       - Prepare and install the ARC 7 SLM.
+
    Previous two weeks (Apr 15 - Apr 26)
 +
      - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
 +
      - Specify depth of field limiting slit widths for Arc 7 SLM
 +
       - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
 +
      - Planning for overall diagnostic system integration, including periodic calibration requirements
 +
     Next two weeks (Apr 29 - May 10)
 +
       - Model SyncLightMonitor matching process for arcs
 +
      - Review field map updates for Moller quads requested by Benesch
 +
       - Continue on 4) above (diagnostic system integration)
  
  
Line 194: Line 200:
 
'''LERF - Steve Benson''' <br>
 
'''LERF - Steve Benson''' <br>
 
   
 
   
     Previous two weeks (Apr 1 - Apr 12)
+
     Previous two weeks (Apr 15 - Apr 26)
       -  
+
       - Completed and submitted the quarterly report for the FOA Cooling project.
    Next two weeks (Apr 15 - Apr 25)
+
      - Complete the budget for the Isotope project quarterly.
       -
+
      - Reviewed the Conduct of Operations procedures for the UITF.
 +
      - Hosted and wrote up minutes for Status meeting for the FOA cooling project.
 +
      - Set up Bruno Muratori seminar.
 +
      - Derived specifications for a Coherent Electron Cooling ERL and discussed with C. Tennant. 
 +
      - Discussed possible Virginia Commonwealth funded JLEIC technology development plan with ODU and Jlab personnel.
 +
      - Reviewed Large Dynamic Range Diagnostic status with J. Gubeli to determine completion steps before shipping to
 +
        Fermilab.
 +
      - Discussed possible installation of the WiFEL gun at Jefferson Lab.
 +
  Next two weeks (Apr 29 - May 10)
 +
       - Prepare for and attend the "Basic Research Needs Workshop on Compact Accelerators for Security and Medicine”
 +
      - Submit new text for LOD and safety envelope for LERF.
 +
      - Summarize the ERLs for EIC workshop.
 +
      - Host Bruno Muratori for Accelerator Seminar Host and write up minutes for Status meeting for the FOA cooling project.

Latest revision as of 10:23, 29 May 2019

April 15, 2019 Report - April 15 - May 10

Director - Todd Satogata

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     - 

Alex Bogacz

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -

Rui Li

  Previous two weeks (Apr 15 - Apr 26)
     - Going over diffraction model of impedance theory and prepare slides for the JLEIC impedance meeting
     - Remotely participate ALS-U impedance meeting and held interesting discussions on CST simulations
     - Held monthly JLEIC impedance meeting 
     - Present overview of diffraction model of broadband impedance
     - Introduce to the team about ALS-U collaboration
     - Review some of the studies on CSR effects 
  Next two weeks (Apr 29 - May 10)
     - Scheduling the next impedance meeting and update JLAB impedance wiki 
     - Further assisting the JLAB impedance team participation of the ALS-U impedance collaboration meeting, 
       by asking ALS-U team to change meeting time so other JLAB members can participate
     - Literature studies on impedances
     - Calculate Resistive wall impedance in JLEIC rings
     - Review some of the studies on CSR effects 


Ed Nissen

  Previous two weeks (Apr 15 - Apr 26)
     - Working on my Early Career Award which I submitted on Monday April 29.
  Next two weeks (Apr 29 - May 10)
     - Working on my papers and posters for IPAC

Chris Tennant

  Previous two weeks (Apr 15 - Apr 26)
     - 
  Next two weeks (Apr 29 - May 10)
     -



Accelerator R & D - Yuhong Zhang

Fanglei Lin

  Previous two weeks (Apr 15 - Apr 26)
     - Took one-week maternity leave
     - Updating the electron collider ring section in the pCDR-100 
     - Working on the storage ring cooler project
  Next two weeks (Apr 29 - May 10)
     - Update the pCDR-100
     - Work on the spin transparence simulation for ions and spin matching for electrons
     - Work on the storage ring cooler project



Vasiliy Morozov

  Previous two weeks (Apr 15 - Apr 26)
     - Preparation of the DoE quarterly reports: they were submitted on April 26
     - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper
     - Two-energy storage ring cooler: study of stability of the longitudinal dynamics
  Next two weeks (Apr 29 - May 10)
     - Preparation of IPAC'18 papers
     - Pre-CDR update


Amy Sy

  Previous two weeks (Apr 15 - Apr 26)
     - Participated in commissioning of laser-driven polarized proton source at FZ Juelich. 
       Testing Lamb-shift polarimeter with unpolarized pulsed proton beam.
     - Finalized early career proposal - to be submitted today.
     - Conversion of linac lattice from TRACK to PyORBIT. Added solenoid element in PyORBIT linac tools
       (solenoid previously only existed in ring lattice tools).
     - Discussion on data from December 2018 IMP bunched beam cooling experiment.
  Next two weeks (Apr 29 - May 10)
     - Longitudinal Schottky signal analysis of remaining data from December 2018 IMP bunched beam cooling experiment.
     - Continued work on conversion of light ion linac lattice from TRACK to PyORBIT.



Yuhong Zhang

  Previous two weeks (Apr 15 - Apr 26)
     - Estimated JLEIC luminosity up to 140 GeV CM
     - Prepared FOA quarterly report
     - Read and commented JLEIC document
     - Hosted Lijun Mao's visit and worked on cooling experiment
     - Worked on IPAC posters          
  Next two weeks (Apr 29 - May 10)
     -



Computational Physics - Yves Roblin
Yves Roblin

   CEBAF
     - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt
       optics to the gradient profile of the linac prior to starting ORFP.
    JLEIC:   
     - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA.
     - Writing tech note on the implementation of IR multipole kicks in BB3D.
     - Gave a presentation on the status of the beam-beam for the new pCDR100 optics 
   OTHER
     - Attended the ML seminar 
     - Starting to work on the use of deep learning networks for CEBAF (matching with sync light )
   Next two weeks (Apr 29 - May 10)
     - Fiish tech note on the IR multipole kicks implementation
     - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks
     - Work on a model for a landau cavity (its 3rd quarter of FOA)
     - Work on optics for the summer run (CEBAF)



He Zhang

   Previous two weeks (Apr 15 - Apr 26)
     - MAD-X 5d Map tracking
     - JSPEC development
   Next two weeks (Apr 29 - May 10)
     - Update the manual for the luminosity module. 
     - Dispersive cooling (New friction force  formulas and benchmark with theory).


River Huang

   Previous two weeks (Apr 15 - Apr 26)
     - “CASA Beam-Beam” Updated the calculation code based on the optimized formula of the spin response function. 
     - Studying of the zero-integer spin resonance strength. From 23.0GeV, 23.1GeV, 23,2GeV, …, till to 320GeV, the
       performance of the zero-integer spin resonance strength has been implemented by the updated CASA Beam-Beam code.
       The numerical result was analyzed in our team will be demonstrated on IPAC19 pear review paper.
     - Crab kicking combined with Elegant - We are still simulating and studying the Crab Kicking and Beam-Beam via CASA 
       beam-Beam, BeamBeam3D and Elegant. The benchmark will be demonstrated in IPAC19 poster and the paper. 
   Next two weeks (Apr 29 - May 10)
     - Prepare the poster for IPAC19.
     - Spin tracking.



Diagnostic Development - Kevin Jordan

   Previous two weeks (Apr 15 - Apr 26)
     - Had power installed for high efficiency magnetron project; the first of two will arrive in 
       a couple weeks. The 480 VAC was tied in to where the Dark light solenoid PS was located. The
       work will be done in the LERF lab 1.
     - Prepared & installed BNNT flag at 7A08, also had discussions on nomenclature & CED - the name 
       of a viewer is based on flag material; OTR/YAG or ’normal’ (Chromox)
     - Worked with Joe on Isotope shielding
     - Finished CRADA for Halo monitor SBIR
     - Preparing for LCLS-II cryomodule swap
   Next two weeks (Apr 29 - May 10)
     - Attend the Canadian Light Source MAC meeting
     - Continue with the prep for the magnetron transmitter
     - Mount the Tungsten radiator on water cooled copper for Isotope project


Joe Gubeli

   Previous two weeks (Apr 15 - Apr 26)
     - ARC 7 SLM installation and alignment. The install went extremely well and S&A in nearly done with aligning.
     - Finished the design of the Isotope shielding – a much simpler and cheaper design See picture below.
     - Have a tentative plan to wire up the HPWS
   Next two weeks (Apr 29 - May 10)
     - Finish the Isotope Shielding presentation
     - Help with the wiring, testing and reconfiguration (changing of input direction) of the HPWS
     - Prepare LDRDS for FAST if we get installation approval


Michael Tiefenback

   Previous two weeks (Apr 15 - Apr 26)
     - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns)
     - Specify depth of field limiting slit widths for Arc 7 SLM
     - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising)
     - Planning for overall diagnostic system integration, including periodic calibration requirements
   Next two weeks (Apr 29 - May 10)
     - Model SyncLightMonitor matching process for arcs
     - Review field map updates for Moller quads requested by Benesch
     - Continue on 4) above (diagnostic system integration)



LERF - Steve Benson

   Previous two weeks (Apr 15 - Apr 26)
     - Completed and submitted the quarterly report for the FOA Cooling project.
     - Complete the budget for the Isotope project quarterly.
     - Reviewed the Conduct of Operations procedures for the UITF.
     - Hosted and wrote up minutes for Status meeting for the FOA cooling project.
     - Set up Bruno Muratori seminar.
     - Derived specifications for a Coherent Electron Cooling ERL and discussed with C. Tennant.  
     - Discussed possible Virginia Commonwealth funded JLEIC technology development plan with ODU and Jlab personnel. 
     - Reviewed Large Dynamic Range Diagnostic status with J. Gubeli to determine completion steps before shipping to
       Fermilab.
     - Discussed possible installation of the WiFEL gun at Jefferson Lab.
  Next two weeks (Apr 29 - May 10)
     - Prepare for and attend the "Basic Research Needs Workshop on Compact Accelerators for Security and Medicine”
     - Submit new text for LOD and safety envelope for LERF.
     - Summarize the ERLs for EIC workshop.
     - Host Bruno Muratori for Accelerator Seminar Host and write up minutes for Status meeting for the FOA cooling project.