Difference between revisions of "2019-05-15-LeadershipReports"

From Administrative
Jump to navigation Jump to search
Line 1: Line 1:
May 15, 2019 Report - May 13 - June 7
+
May 15, 2019 Report - May 6 - May 30
 
 
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 
       -  
 
       -  
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       -   
 
       -   
  
 
Alex Bogacz
 
Alex Bogacz
 
    
 
    
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
      -
 
  Next two weeks (May 27 - June 7)
 
 
       -  
 
       -  
 +
  Next two weeks (May 20 - May 31)
 +
      -
 
   
 
   
  
 
Rui Li
 
Rui Li
 
    
 
    
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
       -  
+
       - Coordinate JLEIC impedance meeting: good progress in the IR chamber design (Mark wiseman)
   Next two weeks (May 27 - June 7)
+
        and EM modeling (Frank Marhauser), and heated discussion about Gunn Tae Park's presentation
       -   
+
        about harmonic kicker impedance analysis. Also interesting discussion with Dan Wang of LBL
 +
        who participated the meeting via bluejeans
 +
      - Literature studies on impedance theories
 +
      - Family vacation for most of the 2nd week
 +
   Next two weeks (May 20 - May 31)
 +
       - Impedance studies
 +
      - Bunch spectrum for JLEIC bunch pattern and its impact on coupled bunch instabilities
 +
      - CSR effect studies (Georg Haffstaetter visit to discuss CSR effects in CBETA)
 +
   
 
   
 
   
  
 
Ed Nissen
 
Ed Nissen
 
    
 
    
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 
       -  
 
       -  
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       -  
 
       -  
 
   
 
   
Line 34: Line 41:
 
Chris Tennant
 
Chris Tennant
 
    
 
    
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 
       -  
 
       -  
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       -  
 
       -  
  
Line 46: Line 53:
 
Fanglei Lin
 
Fanglei Lin
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 
       -  
 
       -  
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       -  
 
       -  
  
Line 55: Line 62:
 
Vasiliy Morozov
 
Vasiliy Morozov
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
      -
 
  Next two weeks (May 27 - June 7)
 
 
       -  
 
       -  
 +
  Next two weeks (May 20 - May 31)
 +
      -
 
    
 
    
 
<br>
 
<br>
 
Amy Sy
 
Amy Sy
  
  Previous two weeks (May 13 - May 24)
+
  Previous two weeks (May 6 - May 17)
      -
 
  Next two weeks (May 27 - June 7)
 
 
       -  
 
       -  
 +
  Next two weeks (May 20 - May 31)
 +
      -
  
 
   
 
   
Line 72: Line 79:
 
Yuhong Zhang
 
Yuhong Zhang
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
      -
 
  Next two weeks (May 27 - June 7)
 
 
       -  
 
       -  
 +
  Next two weeks (May 20 - May 31)
 +
      -
  
 
   
 
   
Line 94: Line 101:
 
He Zhang
 
He Zhang
  
  Previous two weeks (May 13 - May 24)
+
  Previous two weeks (May 6 - May 17)
 
       -  
 
       -  
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       -  
 
       -  
  
Line 103: Line 110:
 
River Zhang
 
River Zhang
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 
       - Completed IPAC2019-poster and submitted paper.
 
       - Completed IPAC2019-poster and submitted paper.
 
       - "CASA BeamBeam"
 
       - "CASA BeamBeam"
Line 114: Line 121:
 
       - 3 Particles Spin Tracking
 
       - 3 Particles Spin Tracking
 
       - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”.
 
       - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”.
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       - pyFMM will be under investigation.
 
       - pyFMM will be under investigation.
 
       - Continue spin tracking study.
 
       - Continue spin tracking study.
Line 122: Line 129:
 
'''Diagnostic Development - Kevin Jordan''' <br>
 
'''Diagnostic Development - Kevin Jordan''' <br>
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
      -
 
  Next two weeks (May 27 - June 7)
 
 
       -  
 
       -  
 +
  Next two weeks (May 20 - May 31)
 +
      -
  
  
 
Joe Gubeli
 
Joe Gubeli
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 +
      -
 +
  Next two weeks (May 20 - May 31)
 
       -  
 
       -  
  Next two weeks (May 27 - June 7)
 
      - 
 
  
  
 
Michael Tiefenback
 
Michael Tiefenback
  
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 +
      -
 +
  Next two weeks (May 20 - May 31)
 
       -  
 
       -  
  Next two weeks (May 27 - June 7)
 
      - 
 
  
  
Line 148: Line 155:
 
'''LERF - Steve Benson''' <br>
 
'''LERF - Steve Benson''' <br>
 
   
 
   
   Previous two weeks (May 13 - May 24)
+
   Previous two weeks (May 6 - May 17)
 
       -  
 
       -  
   Next two weeks (May 27 - June 7)
+
   Next two weeks (May 20 - May 31)
 
       -
 
       -

Revision as of 10:26, 30 May 2019

May 15, 2019 Report - May 6 - May 30 Director - Todd Satogata

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -  

Alex Bogacz

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -

Rui Li

  Previous two weeks (May 6 - May 17)
     - Coordinate JLEIC impedance meeting: good progress in the IR chamber design (Mark wiseman) 
       and EM modeling (Frank Marhauser), and heated discussion about Gunn Tae Park's presentation
       about harmonic kicker impedance analysis. Also interesting discussion with Dan Wang of LBL 
       who participated the meeting via bluejeans
     - Literature studies on impedance theories
     - Family vacation for most of the 2nd week
  Next two weeks (May 20 - May 31)
     - Impedance studies
     - Bunch spectrum for JLEIC bunch pattern and its impact on coupled bunch instabilities
     - CSR effect studies (Georg Haffstaetter visit to discuss CSR effects in CBETA)


Ed Nissen

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     - 

Chris Tennant

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     - 



Accelerator R & D - Yuhong Zhang

Fanglei Lin

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     - 



Vasiliy Morozov

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -
 


Amy Sy

 Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -



Yuhong Zhang

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -




Computational Physics - Yves Roblin
Yves Roblin

   CEBAF
     - 
    JLEIC:   
     -    
   OTHER
     - 


He Zhang

 Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     - 


River Zhang

  Previous two weeks (May 6 - May 17)
     - Completed IPAC2019-poster and submitted paper.
     - "CASA BeamBeam"
     - Revised, optimized and accelerated “Crab Kick” of “CASA BeamBeam” codes by using the High Performance Python Compiler,
       Numba. Based on JIT(Just in Time), Numba translates part of our “Crab Kick” Python functions to optimized machine code
       at runtime using the industry-standard LLVM compiler library. 
     - Performance of “Crab kicking”
     - Simulations have been down for the JLEIC parameters again. For example, for the case CM Energy 21.9GeV, comparing with
       previous job, the “Numba” based “Crab Kick” codes can save 1/5 time than the old code for 4000 turn in a collider ring.
     - 3 Particles Spin Tracking
     - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”.
  Next two weeks (May 20 - May 31)
     - pyFMM will be under investigation.
     - Continue spin tracking study.



Diagnostic Development - Kevin Jordan

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -


Joe Gubeli

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     - 


Michael Tiefenback

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     - 



LERF - Steve Benson

  Previous two weeks (May 6 - May 17)
     - 
  Next two weeks (May 20 - May 31)
     -