− | September | + | September 24 2020 Report - Aug 31 - Sept 25''' |
'''Director - Todd Satogata''' <br> | '''Director - Todd Satogata''' <br> | ||
Line 27: | Line 27: | ||
'''Alex Bogacz''' | '''Alex Bogacz''' | ||
− | '''Previous | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | |||
− | |||
− | |||
− | |||
− | |||
- Machine support | - Machine support | ||
- ER@CEBAF optics revisit | - ER@CEBAF optics revisit | ||
+ | - Muon acceleration paper | ||
+ | - Submitted 4 LOIs to Snowmass | ||
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - ER@CEBAF optics (one-on-one with Isturumali) | ||
- Muon acceleration paper | - Muon acceleration paper | ||
- PRAB paper review | - PRAB paper review | ||
− | + | - Publication Committee work | |
− | |||
− | |||
− | |||
Line 70: | Line 66: | ||
'''Edy Nissen''' | '''Edy Nissen''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | - | + | - On August 31 I submitted an LOI to Snowmass, and edited another one, on which I was a coauthor |
− | '''Next two weeks ( | + | - I then submitted a draft of my DESIREE paper into the Queue |
− | - | + | - I took several days as vacation after that. |
+ | - I have taken part in meetings for the RCS and Beam-beam task forces | ||
+ | - I started adding changes to the DESIREE paper | ||
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - I have been adding changes to the DESIREE paper | ||
+ | - I have been attending meetings for the RCS and Beam-beam task forces | ||
+ | - I am starting background research to take over as Hall-D APEL | ||
Line 81: | Line 83: | ||
'''Chris Tennant''' | '''Chris Tennant''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | |||
− | |||
− | |||
− | |||
- AI lunch (web, administrative, public affairs, etc.) | - AI lunch (web, administrative, public affairs, etc.) | ||
− | '''Next two weeks ( | + | - Prep talk for SLAC AI Seminar (has been rescheduled to later in October) |
− | - AI lunch (web, administrative, public affairs, etc.) | + | - Prep "Graph Representation Learning" presentation/slides |
− | + | - Discuss ways to visually summarize ML fault classifier results from recent physics run | |
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - FOA: meetings with PIs, revise budget to fit with DOE guidance, generate FWP | ||
+ | - SBIR: coordinate beam studies work, meeting with Radiasoft, initial data exploration, complete AWP | ||
+ | - AI lunch (web, administrative, public affairs, etc.) | ||
+ | |||
Line 130: | Line 133: | ||
'''Fanglei Lin''' | '''Fanglei Lin''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | - Continuing the work on the task force on novel techniques for ESR polarization improvement | + | - Continuing the work on the task force on novel techniques for ESR polarization improvement and presented the progress in the bi-weekly meeting |
− | - Studying electron polarization in the eSR on benchmarking results from SLICK, SITRO and Bmad | + | - Studying electron polarization in the eSR on benchmarking results from SLICK, SITRO and Bmad |
− | - Continuing the working on the storage ring cooler project | + | - Continuing the working on the storage ring cooler project |
− | - Miscellaneous: attended the EIC hadron polarization meeting, attended the EIC low energy luminosity/facility optimization meeting, | + | - Miscellaneous: attended the Novel Techniques for eSR Polarization Improvement, attended the EIC eSR polarization meeting, attended the EIC RCS polarization meeting, |
− | + | attended the EIC hadron polarization meeting, attended the EIC low energy luminosity/facility optimization meeting, attended EIC design team meeting, attended the Storage | |
− | + | Ring Cooler meeting, attended the Innovative HE Cooling Project Status meeting, attended the EIC Accelerator Design meeting, attended the EIC general meeting | |
− | + | '''Next two weeks (Sept 14 - Sept 25)''' | |
− | '''Next two weeks ( | + | - Work on novel techniques for eSR polarization improvement |
− | - Work | + | - Study the polarization in the eSR |
− | - Study the polarization in the eSR | + | - Work on the storage ring cooler project |
− | - Work on the storage ring cooler project | + | - Prepare a presentation and attend EIC workshop |
+ | |||
− | |||
Line 151: | Line 154: | ||
'''Bhawin Dhital''' | '''Bhawin Dhital''' | ||
− | '''Previous | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | |||
− | |||
− | |||
− | |||
- I have learned sddsprocess for data analysis after elegant job output. Damped equilibrium values are calculated using sddsprocess and | - I have learned sddsprocess for data analysis after elegant job output. Damped equilibrium values are calculated using sddsprocess and | ||
using Jupyter note-book. Results are promising. | using Jupyter note-book. Results are promising. | ||
Line 162: | Line 161: | ||
- I think my name will appear for two papers in the future based on that Polarized helium3 experiment. | - I think my name will appear for two papers in the future based on that Polarized helium3 experiment. | ||
- I was trying to understand the best way to calculate dynamic aperture and Frequency Map Analysis (FMA) for the whole two rings. | - I was trying to understand the best way to calculate dynamic aperture and Frequency Map Analysis (FMA) for the whole two rings. | ||
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - | ||
+ | |||
+ | |||
Line 167: | Line 170: | ||
'''Vasiliy Morozov''' | '''Vasiliy Morozov''' | ||
− | '''Previous | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | |||
− | |||
− | |||
− | |||
- Electron and ion polarization: | - Electron and ion polarization: | ||
- effect of the detector solenoid in combination with orbit corrector on the ion polarization, | - effect of the detector solenoid in combination with orbit corrector on the ion polarization, | ||
Line 177: | Line 176: | ||
- calculation of the electron and ion polarization lifetimes, | - calculation of the electron and ion polarization lifetimes, | ||
- 2nd IR design: lattice design, calculation of the parasitic beam-beam tune shift | - 2nd IR design: lattice design, calculation of the parasitic beam-beam tune shift | ||
− | - Adjusting coupling in the electron collider ring at 10 GeV and providing input to beam-beam simulations | + | - Adjusting coupling in the electron collider ring at 10 GeV and providing input to beam-beam simulations |
− | + | '''Next two weeks (Sept 14 - Sept 25)''' | |
+ | - 2nd IR design: presentations at the Yellow Report meeting and preparation for the Detector Advisory Committee meeting, evaluation of the beam-beam tune shift due to | ||
+ | parasitic collisions, geometry optimization | ||
+ | - Spin transparency experiment: simulations of polarization manipulations, study of spin effect of mis-alignments | ||
+ | - Detector solenoid integration: meeting with collaborators, effect of the detector solenoid and orbit distortion on proton spin, work on the final tech note | ||
+ | - Electron polarization: polarization lifetime calculations | ||
Line 187: | Line 191: | ||
'''Amy Sy''' | '''Amy Sy''' | ||
− | '''Previous | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
- Completed August 2020 EIC Design Update Newsletter. | - Completed August 2020 EIC Design Update Newsletter. | ||
− | - MADX optimization of integrated solenoid/quadrupole/skew quadrupole fields for a compact spin rotator. Working on solutions that match | + | - MADX optimization of integrated solenoid/quadrupole/skew quadrupole fields for a compact spin rotator. Working on solutions that match to the existing optics for both |
− | + | solenoids. | |
- Attended various meetings on second IR-related topics. | - Attended various meetings on second IR-related topics. | ||
+ | - Attended closeout session of DOE OPA status review of EIC. | ||
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - Submitted input to EIC Biweekly report. | ||
+ | - MADX optimization of integrated solenoid/quadrupole/skew quadrupole fields for a compact spin rotator. Integrating the quadrupole and skew quadrupole fields into the | ||
+ | solenoids can potentially save ~10 m of space per solenoid, for ~20 m total. Solutions matching to the optics while zeroing out the coupling parameters beta12, alfa12, | ||
+ | beta21, and alfa21 using PTC_TWISS in MADX were very difficult to find when dispersion constraints were also included in the optimization. Preliminary solutions for both | ||
+ | solenoid modules were found by relaxing the horizontal dispersion and dispersion prime constraints on the match. The coupling parameters are about an order of magnitude | ||
+ | larger than in the original lattice, and further work is needed to study the implications of this on the beam dynamics in the spin rotator. | ||
+ | - Attended meetings on revisions of the IMP experiment paper. | ||
+ | |||
Line 211: | Line 219: | ||
'''Computational Physics - Yves Roblin'''<br> | '''Computational Physics - Yves Roblin'''<br> | ||
'''Yves Roblin''' | '''Yves Roblin''' | ||
− | Previous two weeks (Aug | + | Previous two weeks (Aug 31 - Sept 11) |
− | - | + | - Support for machine optics |
− | Next two weeks ( | + | - bteam coordination |
− | - | + | - Planning preparations for sad bteam related activities |
+ | - er@cebaf review of optics | ||
+ | Next two weeks (Sept 14 - Sept 25) | ||
+ | - bteam | ||
+ | - Optics on call,machine support | ||
+ | - Developing requirements for ced optics loading | ||
+ | - er@cebaf mtg | ||
+ | - Planning for bteam activities during sad. | ||
+ | - Analysis of raytrace data , development of new procedures to match/assess machine | ||
+ | - Preparation for upcoming physics readiness review on Hall A E12-09-016 experiment | ||
+ | |||
Line 230: | Line 248: | ||
'''River Huang''' | '''River Huang''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 14 - Sept 25)''' |
- | - | ||
Line 238: | Line 256: | ||
'''Isurumali Neththikumara''' | '''Isurumali Neththikumara''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 14 - Sept 25)''' |
- | - | ||
Line 249: | Line 267: | ||
'''Dennis Turner''' | '''Dennis Turner''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | - | + | - '''HLA''' |
+ | - rfHealthCheck modifications per Ops request | ||
+ | - spinDoctor/ced2elegant OPS-PR | ||
- '''CEBAF''' | - '''CEBAF''' | ||
- Optics support | - Optics support | ||
- '''UITF''' | - '''UITF''' | ||
− | - | + | - Tweaks to ced2elegant and qsUtility for running at UITF |
− | - Helped | + | - Helped with optics |
− | + | - '''AIPINJ''' | |
− | + | - Updated decks with final layout and nomenclature | |
- Attended 0800, CASA, BTeam, AIPINJ meetings | - Attended 0800, CASA, BTeam, AIPINJ meetings | ||
− | '''Next two weeks ( | + | - Attended AI Lunch Series talks, Accelerator Seminars, DL4Sci lecture |
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - '''rayTrace''' | ||
+ | - More testing during Beam Studies | ||
+ | - Analyzer development and debugging | ||
+ | - '''AI SRF FOA approval''' | ||
+ | - Met with team to work out budget reduction | ||
+ | - '''UITF''' | ||
+ | - Worked with Max to fix some problems with qsUtility | ||
+ | - Helped with emittance measurement and matching | ||
+ | - Updating UED Optics workspace | ||
+ | - Tweaked ced2elegant | ||
- '''AIPINJ''' | - '''AIPINJ''' | ||
− | + | - Updated decks and InjUpgrade CED workspace with new nomenclature | |
− | + | - Developing tools to import Injector elegant deck into CED | |
− | - | ||
− | |||
− | |||
− | |||
− | |||
− | |||
- Attend CASA, BTeam, AIPINJ meetings | - Attend CASA, BTeam, AIPINJ meetings | ||
− | - | + | - Attend AI Lunch Series, Accelerator Seminars, etc |
+ | |||
Line 280: | Line 306: | ||
'''He Zhang''' | '''He Zhang''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | - | + | - Revised and submitted the Snowmass LOIs. |
− | - Finished | + | - A few more simulations for EIC alternative non-magnetized cooling. |
− | '''Next two weeks ( | + | - Added a few convenient features to jspec2 UI. Merge the edge kick model to the master branch. |
− | - | + | - Start benchmarking jspec2 with IMP data. |
+ | - Finished coding the IBS formula. Now debugging. | ||
+ | '''Next two weeks (Sept 14 - Sept 25)''' | ||
+ | - Continue benchmarking jspec2. | ||
+ | - Finish debugging and testing the IBS formula. | ||
- Test JSPEC python wrapper. | - Test JSPEC python wrapper. | ||
− | + | ||
Line 297: | Line 327: | ||
'''Kevin Jordan''' | '''Kevin Jordan''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 14 - Sept 25)''' |
- | - | ||
Line 307: | Line 337: | ||
'''Joe Gubeli''' | '''Joe Gubeli''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug - Sept )''' |
- '''Isotopes –'''Attended several planning meetings. Setup some equipment needed for next week’s run | - '''Isotopes –'''Attended several planning meetings. Setup some equipment needed for next week’s run | ||
- '''ARDDOT''' - Had a few meeting with the Injector group to determine if the new viewer image design would work for them. They have some | - '''ARDDOT''' - Had a few meeting with the Injector group to determine if the new viewer image design would work for them. They have some | ||
Line 314: | Line 344: | ||
I&C folks had to run to another call and didn’t have time to assemble an imager. We will reschedule for another time. Have inventoried | I&C folks had to run to another call and didn’t have time to assemble an imager. We will reschedule for another time. Have inventoried | ||
and conveniently placed all the parts received for the imager. Still have a few parts including the cameras that have not arrived. | and conveniently placed all the parts received for the imager. Still have a few parts including the cameras that have not arrived. | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 14 - Sept 25)''' |
- '''Isotopes –''' Help as much as possible with the upcoming experimental run. | - '''Isotopes –''' Help as much as possible with the upcoming experimental run. | ||
- '''ARDDOT –''' Work with I&C on imager assembly | - '''ARDDOT –''' Work with I&C on imager assembly | ||
Line 325: | Line 355: | ||
'''Michael Tiefenback''' | '''Michael Tiefenback''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (Sept 14 - Sept 25)''' |
- | - | ||
Line 336: | Line 366: | ||
'''LERF - Steve Benson''' | '''LERF - Steve Benson''' | ||
− | '''Previous | + | '''Previous two weeks (Aug 31 - Sept 11) |
− | + | - Attended Linac 2020 and present talk | |
− | + | - Worked on contribution to Cooling Alternatives Document | |
− | + | - Submitted request to re-allocate FOA funds to M. Farkhondeh (request was accepted) | |
− | + | - Presented status of Low Energy Cooling Task Force at the Wednesday EIC Research meeting | |
− | + | - Got LOSP for Drive Laser Enclosure submitted and approved | |
− | + | - Submitted Isotope run plans for Ga_71 exposures and surrogate crucible tests | |
− | + | - Resubmitted runs plans for 32 MeV linac setup and gallium exposure run | |
− | - | ||
− | - | ||
− | - | ||
− | - | ||
− | - | ||
− | - | ||
− | - | ||
- Review MCBI paper | - Review MCBI paper | ||
− | + | '''Next two weeks (Sept 14 - Sept 25)''' | |
+ | - Finish up contribution to Cooling Alternatives Document | ||
+ | - Assist in the Isotope run | ||
+ | - Analyze results from the isotope run | ||
+ | - Work with Xelera to model different merger designs for the EIC | ||
+ | - Develop new AWPs for isotope program | ||
+ | - Review EIC ERL design to determine R&D path | ||
+ | - Modify AWPs for Cooling FOA project. | ||
Line 361: | Line 391: | ||
'''Andrew Hutton''' | '''Andrew Hutton''' | ||
− | '''Previous two weeks (Aug | + | '''Previous two weeks (Aug 31 - Sept 11)''' |
− | + | - I attended various EIC meetings. I also spent some time studying the draft report from the Alternate Strong Cooling Task Force. This resulted in a suggestion to Geoff | |
− | + | and Fanglei to shorten the high energy section of the dual ring cooler; I sent the same recommendation to Jorg Kewish for the single ring cooler. I proposed a method to | |
− | + | arrange the cross-over between the high and low energy sections of the dual energy cooler using twin-axis SRF cavities. Finally, I suggested to Jorg that he modify the | |
− | + | wiggler design he developed for the single ring cooler to be compatible with the high energy section of the dual axis cooler ring. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | - I attended various EIC meetings. I also spent some time studying the draft report from the Alternate Strong Cooling Task Force. This | ||
− | |||
− | |||
− | |||
− | |||
- The modified (and much improved) PERLE ICRADA was sent to the DOE. | - The modified (and much improved) PERLE ICRADA was sent to the DOE. | ||
- We have been making detailed plans for the Isotope Irradiations, scheduled for September 13 - 19. | - We have been making detailed plans for the Isotope Irradiations, scheduled for September 13 - 19. | ||
− | - I have been active on the AWLC 2020 organization, proposing three talks from Jefferson Lab, which were accepted. | + | - I have been active on the AWLC 2020 organization, proposing three talks from Jefferson Lab, which were accepted. |
+ | '''Next two weeks (Sept 14 - Sept 25) | ||
+ | - Isotope Irradiations took place Sept 13-16. This involved a stack of Nickel and Vanadium foils and isotopically pure Gallium71 in a powdered oxide form for calibration. | ||
+ | We also irradiated a solid graphite block to obtain approval for using graphite as the crucible for the later irradiation of natural liquid gallium. We obtained approval | ||
+ | the same day (actually after hours in the evening) and irradiated the gallium for a total of 26 hours. The LERF was not being cooperative and we lost 12 hours to an RF | ||
+ | station, but because of the rainfall from the SALLY remnants, we were able to extend the run (too dangerous to remove the shielding blocks). The results appear to | ||
+ | confirm the FLUKA results for Gallium, but we are pretty sure that FLKA gives the wrong results for Nickel (one of the daughters has twice the production rate, the other | ||
+ | one half). We are still having meetings to get all of the calibrations correct in view of a publication. | ||
+ | - Lila presented the work she did at Jefferson Lab as an REU student at the "The DOE Isotope Program’s Virtual Seminar Series: On the Horizon: Novel Isotopes and Future | ||
+ | Leaders.” I worked with her to make sure she did well. | ||
+ | - I spent a lot of time looking at the harmonic kicker for the EIS RCS; in my opinion, too much effort has been spent on optimizing the RF to avoid problems that I do not | ||
+ | believe are problems. | ||
+ | - We received preliminary approval for the PERLE ICRADA from the DOE - submitted on September 3, pre-approval obtained on September 23, faster than it took to go through | ||
+ | the system at Jefferson Lab. It required two Jefferson lab signatures, Andrei and Drew; both have signed. Now it goes to IJCLab where Achille Stocchi, the Director, is | ||
+ | eager to sign it. | ||
+ | - There was a VNECA meeting scheduled and I read through the draft Governor’s Statement in preparation. My suggestions from the first draft had all been incorporated and I | ||
+ | actually found a typo in the latest version (the authors were delighted!). The meeting was postponed at the last minute. |
Latest revision as of 12:37, 8 October 2020
September 24 2020 Report - Aug 31 - Sept 25
Director - Todd Satogata
Todd Satogata
Previous two weeks (Aug 17 - Aug 28) - EIC Analysis of Alternatives review post-meetings - EIC Mini-MAC prep/dry run (Aug 17-18); review (Aug 26/28) - EIC CDR editing, editorial review, integration (much work) - EIC Meetings (impedance, RCS task force; CDR editorial; physics; planning/project; start weekly L2 meetings) - EIC EIC/FCC planning discussions - EIC OPA review early draft slide preparations - MGMT Meetings (Leadership/Dept Heads, CASA coffee, Accel Div Diversity survey) - MGMT P&C Meeting (Aug 24) - ADMIN Finish Snowmass LOI planning, emails - ADMIN APS DPB Exec Committee quarterly meeting (Aug 28) - OPS Daily 07:45/08:00, weekly W 1:30 - ODU Meetings (Xelera weekly, Isurumali beam-beam, Bhawin) Next two weeks (Aug 31 - Sept 11) -
Alex Bogacz
Previous two weeks (Aug 31 - Sept 11) - Machine support - ER@CEBAF optics revisit - Muon acceleration paper - Submitted 4 LOIs to Snowmass Next two weeks (Sept 14 - Sept 25) - ER@CEBAF optics (one-on-one with Isturumali) - Muon acceleration paper - PRAB paper review - Publication Committee work
Rui Li
Previous two weeks (Aug 17 - Aug 28) - Going through microwave instability threshold analysis by Stupakov and Heifets - Use Mathematica to calculate CSR in eSR of EIC, using Murphy's paper for shielding of parallel plate. Compare with Alexei Blednyke's CSR results from Demin Zhou's code - Check literature for transient CSR with shielding effect for the split dipole in eSR of EIC - Planning for TCBI modeling for eSR of EIC - Participate task force meetings and discussions on impedance in eSR of EIC - Continue attending meeting and discussion in ALS-U impedance studies Next two weeks (Aug 31 - Sept 11) - Attend LINAC 2020 - Calculate more results for my technote on beam spectra for uneven bunch fill - Worked on planning the modeling of transverse coupled-bunch instability for eSR in EIC - Participate task force meetings and discussions on impedance in eSR of EIC - Continue attending meeting and discussion in ALS-U impedance studies
Edy Nissen
Previous two weeks (Aug 31 - Sept 11) - On August 31 I submitted an LOI to Snowmass, and edited another one, on which I was a coauthor - I then submitted a draft of my DESIREE paper into the Queue - I took several days as vacation after that. - I have taken part in meetings for the RCS and Beam-beam task forces - I started adding changes to the DESIREE paper Next two weeks (Sept 14 - Sept 25) - I have been adding changes to the DESIREE paper - I have been attending meetings for the RCS and Beam-beam task forces - I am starting background research to take over as Hall-D APEL
Chris Tennant
Previous two weeks (Aug 31 - Sept 11) - AI lunch (web, administrative, public affairs, etc.) - Prep talk for SLAC AI Seminar (has been rescheduled to later in October) - Prep "Graph Representation Learning" presentation/slides - Discuss ways to visually summarize ML fault classifier results from recent physics run Next two weeks (Sept 14 - Sept 25) - FOA: meetings with PIs, revise budget to fit with DOE guidance, generate FWP - SBIR: coordinate beam studies work, meeting with Radiasoft, initial data exploration, complete AWP - AI lunch (web, administrative, public affairs, etc.)
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (Aug 17 - Aug 28) - Next two weeks (Aug 31 - Sept 11) -
Max Bruker
Previous (Aug 31 - Sept 11) - Linac 2020 conference - Lots of fun at the UITF. Very nice machine with just the right size. I haven't touched a lot of hardware so far but got to play with the beam and learn the controls. - The IMP paper is back from the review. There is some homework to be done but nothing backbreaking. Next (Sept 14 - Sept 25) - IBIC - More UITF fun - IBS and cooling simulations to back up the experimental results presented in the IMP paper. We should aim for resubmission of the manuscript within 1--2 weeks.
Fanglei Lin
Previous two weeks (Aug 31 - Sept 11) - Continuing the work on the task force on novel techniques for ESR polarization improvement and presented the progress in the bi-weekly meeting - Studying electron polarization in the eSR on benchmarking results from SLICK, SITRO and Bmad - Continuing the working on the storage ring cooler project - Miscellaneous: attended the Novel Techniques for eSR Polarization Improvement, attended the EIC eSR polarization meeting, attended the EIC RCS polarization meeting, attended the EIC hadron polarization meeting, attended the EIC low energy luminosity/facility optimization meeting, attended EIC design team meeting, attended the Storage Ring Cooler meeting, attended the Innovative HE Cooling Project Status meeting, attended the EIC Accelerator Design meeting, attended the EIC general meeting Next two weeks (Sept 14 - Sept 25) - Work on novel techniques for eSR polarization improvement - Study the polarization in the eSR - Work on the storage ring cooler project - Prepare a presentation and attend EIC workshop
Bhawin Dhital
Previous two weeks (Aug 31 - Sept 11) - I have learned sddsprocess for data analysis after elegant job output. Damped equilibrium values are calculated using sddsprocess and using Jupyter note-book. Results are promising. - I was taking Polarized He3 experimental shifts at Hall C. I was taking 6 swing shifts from September 07 to September 13. Now all shifts are completed and - I think my name will appear for two papers in the future based on that Polarized helium3 experiment. - I was trying to understand the best way to calculate dynamic aperture and Frequency Map Analysis (FMA) for the whole two rings. Next two weeks (Sept 14 - Sept 25) -
Vasiliy Morozov
Previous two weeks (Aug 31 - Sept 11) - Electron and ion polarization: - effect of the detector solenoid in combination with orbit corrector on the ion polarization, - effect of crabbing kicks on the electron and ion polarizations, - calculation of the electron and ion polarization lifetimes, - 2nd IR design: lattice design, calculation of the parasitic beam-beam tune shift - Adjusting coupling in the electron collider ring at 10 GeV and providing input to beam-beam simulations Next two weeks (Sept 14 - Sept 25) - 2nd IR design: presentations at the Yellow Report meeting and preparation for the Detector Advisory Committee meeting, evaluation of the beam-beam tune shift due to parasitic collisions, geometry optimization - Spin transparency experiment: simulations of polarization manipulations, study of spin effect of mis-alignments - Detector solenoid integration: meeting with collaborators, effect of the detector solenoid and orbit distortion on proton spin, work on the final tech note - Electron polarization: polarization lifetime calculations
Amy Sy
Previous two weeks (Aug 31 - Sept 11) - Completed August 2020 EIC Design Update Newsletter. - MADX optimization of integrated solenoid/quadrupole/skew quadrupole fields for a compact spin rotator. Working on solutions that match to the existing optics for both solenoids. - Attended various meetings on second IR-related topics. - Attended closeout session of DOE OPA status review of EIC. Next two weeks (Sept 14 - Sept 25) - Submitted input to EIC Biweekly report. - MADX optimization of integrated solenoid/quadrupole/skew quadrupole fields for a compact spin rotator. Integrating the quadrupole and skew quadrupole fields into the solenoids can potentially save ~10 m of space per solenoid, for ~20 m total. Solutions matching to the optics while zeroing out the coupling parameters beta12, alfa12, beta21, and alfa21 using PTC_TWISS in MADX were very difficult to find when dispersion constraints were also included in the optimization. Preliminary solutions for both solenoid modules were found by relaxing the horizontal dispersion and dispersion prime constraints on the match. The coupling parameters are about an order of magnitude larger than in the original lattice, and further work is needed to study the implications of this on the beam dynamics in the spin rotator. - Attended meetings on revisions of the IMP experiment paper.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (Aug 31 - Sept 11) - Support for machine optics - bteam coordination - Planning preparations for sad bteam related activities - er@cebaf review of optics Next two weeks (Sept 14 - Sept 25) - bteam - Optics on call,machine support - Developing requirements for ced optics loading - er@cebaf mtg - Planning for bteam activities during sad. - Analysis of raytrace data , development of new procedures to match/assess machine - Preparation for upcoming physics readiness review on Hall A E12-09-016 experiment
Randi Gamage
Previous two weeks (Aug 17 - Aug 28) - Next two weeks (Aug 31 - Sept 11) -
River Huang
Previous two weeks (Aug 31 - Sept 11) - Next two weeks (Sept 14 - Sept 25) -
Isurumali Neththikumara
Previous two weeks (Aug 31 - Sept 11) - Next two weeks (Sept 14 - Sept 25) -
Dennis Turner
Previous two weeks (Aug 31 - Sept 11) - HLA - rfHealthCheck modifications per Ops request - spinDoctor/ced2elegant OPS-PR - CEBAF - Optics support - UITF - Tweaks to ced2elegant and qsUtility for running at UITF - Helped with optics - AIPINJ - Updated decks with final layout and nomenclature - Attended 0800, CASA, BTeam, AIPINJ meetings - Attended AI Lunch Series talks, Accelerator Seminars, DL4Sci lecture Next two weeks (Sept 14 - Sept 25) - rayTrace - More testing during Beam Studies - Analyzer development and debugging - AI SRF FOA approval - Met with team to work out budget reduction - UITF - Worked with Max to fix some problems with qsUtility - Helped with emittance measurement and matching - Updating UED Optics workspace - Tweaked ced2elegant - AIPINJ - Updated decks and InjUpgrade CED workspace with new nomenclature - Developing tools to import Injector elegant deck into CED - Attend CASA, BTeam, AIPINJ meetings - Attend AI Lunch Series, Accelerator Seminars, etc
He Zhang
Previous two weeks (Aug 31 - Sept 11) - Revised and submitted the Snowmass LOIs. - A few more simulations for EIC alternative non-magnetized cooling. - Added a few convenient features to jspec2 UI. Merge the edge kick model to the master branch. - Start benchmarking jspec2 with IMP data. - Finished coding the IBS formula. Now debugging. Next two weeks (Sept 14 - Sept 25) - Continue benchmarking jspec2. - Finish debugging and testing the IBS formula. - Test JSPEC python wrapper.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (Aug 31 - Sept 11) - Next two weeks (Sept 14 - Sept 25) -
Joe Gubeli
Previous two weeks (Aug - Sept ) - Isotopes –Attended several planning meetings. Setup some equipment needed for next week’s run - ARDDOT - Had a few meeting with the Injector group to determine if the new viewer image design would work for them. They have some very tight spaces. Met with the I&C group to show them the viewer imager and to test a lipstick replacement camera. The tested camera has an nonadjustable lens an images a lot of the tube with a small image of the view screen. Not sure that it is a good replacement. The I&C folks had to run to another call and didn’t have time to assemble an imager. We will reschedule for another time. Have inventoried and conveniently placed all the parts received for the imager. Still have a few parts including the cameras that have not arrived. Next two weeks (Sept 14 - Sept 25) - Isotopes – Help as much as possible with the upcoming experimental run. - ARDDOT – Work with I&C on imager assembly - ACCTVL – Attend the virtual IBIC2020 Conference.
Michael Tiefenback
Previous two weeks (Aug 31 - Sept 11) - Next two weeks (Sept 14 - Sept 25) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (Aug 31 - Sept 11) - Attended Linac 2020 and present talk - Worked on contribution to Cooling Alternatives Document - Submitted request to re-allocate FOA funds to M. Farkhondeh (request was accepted) - Presented status of Low Energy Cooling Task Force at the Wednesday EIC Research meeting - Got LOSP for Drive Laser Enclosure submitted and approved - Submitted Isotope run plans for Ga_71 exposures and surrogate crucible tests - Resubmitted runs plans for 32 MeV linac setup and gallium exposure run - Review MCBI paper Next two weeks (Sept 14 - Sept 25) - Finish up contribution to Cooling Alternatives Document - Assist in the Isotope run - Analyze results from the isotope run - Work with Xelera to model different merger designs for the EIC - Develop new AWPs for isotope program - Review EIC ERL design to determine R&D path - Modify AWPs for Cooling FOA project.
Andrew Hutton
Previous two weeks (Aug 31 - Sept 11) - I attended various EIC meetings. I also spent some time studying the draft report from the Alternate Strong Cooling Task Force. This resulted in a suggestion to Geoff and Fanglei to shorten the high energy section of the dual ring cooler; I sent the same recommendation to Jorg Kewish for the single ring cooler. I proposed a method to arrange the cross-over between the high and low energy sections of the dual energy cooler using twin-axis SRF cavities. Finally, I suggested to Jorg that he modify the wiggler design he developed for the single ring cooler to be compatible with the high energy section of the dual axis cooler ring. - The modified (and much improved) PERLE ICRADA was sent to the DOE. - We have been making detailed plans for the Isotope Irradiations, scheduled for September 13 - 19. - I have been active on the AWLC 2020 organization, proposing three talks from Jefferson Lab, which were accepted. Next two weeks (Sept 14 - Sept 25) - Isotope Irradiations took place Sept 13-16. This involved a stack of Nickel and Vanadium foils and isotopically pure Gallium71 in a powdered oxide form for calibration. We also irradiated a solid graphite block to obtain approval for using graphite as the crucible for the later irradiation of natural liquid gallium. We obtained approval the same day (actually after hours in the evening) and irradiated the gallium for a total of 26 hours. The LERF was not being cooperative and we lost 12 hours to an RF station, but because of the rainfall from the SALLY remnants, we were able to extend the run (too dangerous to remove the shielding blocks). The results appear to confirm the FLUKA results for Gallium, but we are pretty sure that FLKA gives the wrong results for Nickel (one of the daughters has twice the production rate, the other one half). We are still having meetings to get all of the calibrations correct in view of a publication. - Lila presented the work she did at Jefferson Lab as an REU student at the "The DOE Isotope Program’s Virtual Seminar Series: On the Horizon: Novel Isotopes and Future Leaders.” I worked with her to make sure she did well. - I spent a lot of time looking at the harmonic kicker for the EIS RCS; in my opinion, too much effort has been spent on optimizing the RF to avoid problems that I do not believe are problems. - We received preliminary approval for the PERLE ICRADA from the DOE - submitted on September 3, pre-approval obtained on September 23, faster than it took to go through the system at Jefferson Lab. It required two Jefferson lab signatures, Andrei and Drew; both have signed. Now it goes to IJCLab where Achille Stocchi, the Director, is eager to sign it. - There was a VNECA meeting scheduled and I read through the draft Governor’s Statement in preparation. My suggestions from the first draft had all been incorporated and I actually found a typo in the latest version (the authors were delighted!). The meeting was postponed at the last minute.