− | - | + | - I was working with new lattice design with isochronous arc. Initial particle tracking was performed. |
− | '''Next two weeks (July 19 - July 30)''' | + | '''Next two weeks (July 19 - July 30)''' |
− | - | + | - I will be working on dual energy storage ring cooler design with new design using isochronous arc lattice. Further modi�cations and stability criteria of such a new lattice will be carried out. |
+ | More calculations with particle tracking simulations will be carried out | ||
Line 169: | Line 170: | ||
'''Previous two weeks (July 5 - July 16)''' | '''Previous two weeks (July 5 - July 16)''' | ||
− | - Laser particle counter: Continued data analysis of 6-channel data with 1-2 Hz wire sweeping rate. Vendor visit on July 6 focused on observation of different operating modes and implications on event identification both pre and post data analysis. Currently seeing 3-4 operating modes in which events are often seen in one of the two available signals per channel, and trying to understand why channels switch between operating modes as the system settles. Vendor returned on July 14 with updated software allowing for higher data resolution in both signals (shared bandwidth between the two signals) and an updated algorithm for offline analysis of the signals that relies on calculating and subtracting a noise spectrum from the raw data. | + | - Laser particle counter: Continued data analysis of 6-channel data with 1-2 Hz wire sweeping rate. Vendor visit on July 6 focused on observation of different operating modes and implications on event |
− | - Discussion with M. Poelker on studies of gas bremsstrahlung in the CEBAF linacs, possibility of detection using radiation monitors, and mitigation efforts including ion clearing gaps. Literature study on gas bremsstrahlung in electron storage rings and ion clearing methods at Cornell. Discussion with M. Poelker and J. Grames on July 12. | + | identification both pre and post data analysis. Currently seeing 3-4 operating modes in which events are often seen in one of the two available signals per channel, and trying to understand why channels |
+ | switch between operating modes as the system settles. Vendor returned on July 14 with updated software allowing for higher data resolution in both signals (shared bandwidth between the two signals) and | ||
+ | an updated algorithm for offline analysis of the signals that relies on calculating and subtracting a noise spectrum from the raw data. | ||
+ | - Discussion with M. Poelker on studies of gas bremsstrahlung in the CEBAF linacs, possibility of detection using radiation monitors, and mitigation efforts including ion clearing gaps. Literature study | ||
+ | on gas bremsstrahlung in electron storage rings and ion clearing methods at Cornell. Discussion with M. Poelker and J. Grames on July 12. | ||
'''Next two weeks (July 19 - July 30)''' | '''Next two weeks (July 19 - July 30)''' | ||
- Literature study on gas bremsstrahlung in electron storage rings and ion clearing methods. Working with J. Grames and M. Poelker to continue studies of gas bremsstrahlung in the CEBAF linacs. | - Literature study on gas bremsstrahlung in electron storage rings and ion clearing methods. Working with J. Grames and M. Poelker to continue studies of gas bremsstrahlung in the CEBAF linacs. | ||
− | - Laser particle counter: Continued system debugging, optimization, and data analysis to better understand operational modes. Swapped the sensors driving channels 0 and 2 to test whether the noise in channel 0 is fiber driven or sensor driven. Vendor will return July 27-28 with remaining 18 sensors for full 24 channel capability. The additional sensors should have better signal to noise response than the initial 6 channels. | + | - Laser particle counter: Continued system debugging, optimization, and data analysis to better understand operational modes. Swapped the sensors driving channels 0 and 2 to test whether the noise in |
+ | channel 0 is fiber driven or sensor driven. Vendor will return July 27-28 with remaining 18 sensors for full 24 channel capability. The additional sensors should have better signal to noise response | ||
+ | than the initial 6 channels. | ||
Line 193: | Line 200: | ||
'''Computational Physics - Yves Roblin'''<br> | '''Computational Physics - Yves Roblin'''<br> | ||
'''Yves Roblin''' | '''Yves Roblin''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (July 5 - July 16)''' |
− | - | + | - '''OPS:''' |
− | '''Next two weeks (July | + | - BTEAM meeting |
− | - | + | - BTEAM coordination |
+ | - Analysis of previous machine Downtime, developing new metrics to track tune time | ||
+ | - OTHER: | ||
+ | - '''CEBAF:''' | ||
+ | - CED updates for upcoming run | ||
+ | - Optics development for Hall A and Moller collaboration | ||
+ | - USPAS: | ||
+ | - exercises grading | ||
+ | - setting up latex templates for springer verlag book chapter | ||
+ | - literature search,reading | ||
+ | '''Next two weeks (July 19 - July 30)''' | ||
+ | - CEBAF machine recovery | ||
+ | - Developing new schemes for extracting transfer matrices in the injector region | ||
+ | - Optics development | ||
+ | - Bteam coordination+meetings | ||
+ | - USPAS meeting on book writing | ||
+ | - Looking at AI opportunities for machine fault detection/reliability. | ||
+ | |||
Line 208: | Line 232: | ||
'''Randi Gamage''' | '''Randi Gamage''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (July 5 - July 16)''' |
- | - | ||
− | '''Next two weeks (July | + | '''Next two weeks (July 19 - July 30)''' |
- | - | ||
Line 218: | Line 242: | ||
'''Previous two weeks (July 5 - July 16)''' | '''Previous two weeks (July 5 - July 16)''' | ||
− | - EIC Beam-Beam project: Collaborating with Vasiliy Morozov, Yun Luo, Yuhong Zhang and other colleagues, studying on the emittance growth caused by the phase noise in the crab cavity and further testing particles’ tracking by using CASA-BeamBeam. | + | - EIC Beam-Beam project: Collaborating with Vasiliy Morozov, Yun Luo, Yuhong Zhang and other colleagues, studying on the emittance growth caused by the phase noise in the crab |
− | '''Next two weeks (July | + | cavity and further testing particles’ tracking by using CASA-BeamBeam. |
+ | '''Next two weeks (July 19 - July 30)''' | ||
- Continue working on EIC Beam-Beam project. | - Continue working on EIC Beam-Beam project. | ||
Line 313: | Line 338: | ||
'''Kevin Jordan''' | '''Kevin Jordan''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (July 5 - July 16)''' |
- | - | ||
− | '''Next two weeks (July | + | '''Next two weeks (July 19 - July 30)''' |
- | - | ||
Line 323: | Line 348: | ||
'''Joe Gubeli''' | '''Joe Gubeli''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (July 5 - July 16)''' |
- '''Isotopes –''' | - '''Isotopes –''' | ||
- '''ARDDOT - ''' | - '''ARDDOT - ''' | ||
− | '''Next two weeks (July | + | '''Next two weeks (July 16 - July 30)''' |
- '''Isotopes –''' | - '''Isotopes –''' | ||
- '''ARDDOT –''' | - '''ARDDOT –''' | ||
Line 334: | Line 359: | ||
'''Michael Tiefenback''' | '''Michael Tiefenback''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (July 5 - July 16)''' |
- | - | ||
− | '''Next two weeks ( | + | '''Next two weeks (July 19 - July 30)''' |
- | - | ||
Line 345: | Line 370: | ||
'''LERF - Steve Benson''' | '''LERF - Steve Benson''' | ||
− | '''Previous two weeks ( | + | '''Previous two weeks (July 5 - July 16)''' |
− | - | + | - Prepared and presented presentation for LDRD proposal |
− | - | + | - Derived phase an amplitude specifications for harmonic RF for the EIC cooler ERL |
− | - | + | - Reviewed FEL laser optics procurements for export control sensitivity |
− | - Reviewed | + | - Reviewed new Laser Safety sections of the ES&H manual |
− | - | + | - Attended the Symposium on the Accelerator R&D Roadmap for the HEP Community |
− | - | + | - Started putting together quarterly report for the Innovative High Energy Cooling project |
− | + | '''Next two weeks (July 19 - July 19)''' | |
− | + | - Complete and submit quarterly report for the "Innovative High Energy electron cooling for the EIC" contract. | |
− | '''Next two weeks (July | ||
- Continue developing longitudinal model for CeC ERL on LiTrack | - Continue developing longitudinal model for CeC ERL on LiTrack | ||
− | + | - Review several papers. | |
− | - Review | + | - Assist in writing the Isotope program final report. |
− | - | ||
− | |||
- Rewrite and submit the LOSP for User Lab 4 | - Rewrite and submit the LOSP for User Lab 4 | ||
− | |||
− | |||
Line 375: | Line 395: | ||
'''Previous two weeks (July 5 - July 16)''' | '''Previous two weeks (July 5 - July 16)''' | ||
- '''Isotopes: ''' a really busy time with several meetings with UVA and NMT. As it stands, UVA will proceed with a proposal that is purely biological, and Jefferson Lab and NMT will not be involved. | - '''Isotopes: ''' a really busy time with several meetings with UVA and NMT. As it stands, UVA will proceed with a proposal that is purely biological, and Jefferson Lab and NMT will not be involved. | ||
− | - '''ERL:'''I gave my ERL talk () on Friday July 9 to about 145 people. This took up a lot of time. The ERL sub-Panel took up even more time as we have wrestled with understanding the CERC. I had the last meeting on the CERC as well as the first meeting where Telnov presented the ERLC. I foresee another frenetic round of interactions between the sub-Panel members who are incredibly active - I regularly have a dozen emails early in the morning as the others get up before me! I contacted Wim Leemans, now at DESY, to try and talk him into participating in PERLE. No follow up from DESY yet. | + | - '''ERL:'''I gave my ERL talk () on Friday July 9 to about 145 people. This took up a lot of time. The ERL sub-Panel took up even more time as we have wrestled with understanding the CERC. I had the |
+ | last meeting on the CERC as well as the first meeting where Telnov presented the ERLC. I foresee another frenetic round of interactions between the sub-Panel members who are incredibly active - I | ||
+ | regularly have a dozen emails early in the morning as the others get up before me! I contacted Wim Leemans, now at DESY, to try and talk him into participating in PERLE. No follow up from DESY yet. | ||
+ | With the loss of Frank Marhauser and all the EIC work, I do not see Jefferson Lab having a big involvement in the SRF for PERLE, so maybe we can work with DESY to participate in the SRF. Hopefully, | ||
+ | Alex will be able to continue leading the optics studies. | ||
- '''HIPERLAC:''' I responded to questions from Leigh and prepared and delivered a talk (attached). | - '''HIPERLAC:''' I responded to questions from Leigh and prepared and delivered a talk (attached). | ||
- '''ALcC:''' we had a meeting on July 13 to discuss the ILC status. | - '''ALcC:''' we had a meeting on July 13 to discuss the ILC status. | ||
− | '''Next two weeks (July | + | '''Next two weeks (July 19 - July 30) |
− | - '''Isotopes: '''a really busy time with several meetings with UVA and NMT. As it stands, UVA will proceed with a proposal that is purely biological, and Jefferson Lab and NMT will not be involved. NMT will lead a proposal to study Scandium47 with irradiations at the Idaho Accelerator Center. We would probably be involved in targeted - still being worked out. The end of project write up for our current isotope funding is due July 30, I haven’t yet started to put it together. | + | - '''Isotopes: '''a really busy time with several meetings with UVA and NMT. As it stands, UVA will proceed with a proposal that is purely biological, and Jefferson Lab and NMT will not be involved. |
− | - '''ERL: '''I gave my ERL talk [[:File:ERL RD Roadmap July 2021.pdf]] on Friday July 9 to about 145 people. This took up a lot of time. The ERL sub-Panel took up even more time as we have wrestled with understanding the CERC. Next week, I will have the last meeting on the CERC as well as the first meeting where Telnov will present the ERLC. I foresee another frenetic round of interactions between the sub-Panel members who are incredibly active - I regularly have a dozen emails early in the morning as the others get up before me! I contacted Wim Leemans, now at DESY, to try and talk him into participating in PERLE. We will have a video-conference next week. With the loss of Frank Marhauser and all the EIC work, I do not see Jefferson Lab having a big involvement in the SRF for PERLE, so maybe we can work with DESY to participate in the SRF. Hopefully, Alex will be able to continue leading the optics studies. | + | NMT will lead a proposal to study Scandium47 with irradiations at the Idaho Accelerator Center. We would probably be involved in targeted - still being worked out. The end of project write up for |
+ | our current isotope funding is due July 30, I haven’t yet started to put it together. | ||
+ | - '''ERL: '''I gave my ERL talk [[:File:ERL RD Roadmap July 2021.pdf]] on Friday July 9 to about 145 people. This took up a lot of time. The ERL sub-Panel took up even more time as we have wrestled | ||
+ | with understanding the CERC. Next week, I will have the last meeting on the CERC as well as the first meeting where Telnov will present the ERLC. I foresee another frenetic round of interactions | ||
+ | between the sub-Panel members who are incredibly active - I regularly have a dozen emails early in the morning as the others get up before me! I contacted Wim Leemans, now at DESY, to try and | ||
+ | talk him into participating in PERLE. We will have a video-conference next week. With the loss of Frank Marhauser and all the EIC work, I do not see Jefferson Lab having a big involvement in the | ||
+ | SRF for PERLE, so maybe we can work with DESY to participate in the SRF. Hopefully, Alex will be able to continue leading the optics studies. | ||
- '''HIPERLAC: '''I responded to questions from Leigh and next week I have to prepare a talk. | - '''HIPERLAC: '''I responded to questions from Leigh and next week I have to prepare a talk. | ||
- '''ALcC: '''we will have a meeting on July 13 to discuss the ILC status. | - '''ALcC: '''we will have a meeting on July 13 to discuss the ILC status. |
Latest revision as of 11:53, 12 August 2021
July 22, 2021 Report - July 5 - July 30
Director - Todd Satogata
Todd Satogata
Previous two weeks (July 5 - July 16) - EIC Meetings (management, RF, crab, cooling, impedance, team, R&D, beam-beam) - EIC Meetings (second IR), resource planning (critical hires) - EIC CD-1 Celebration (Jul 16) - MGMT Critical hire job descriptions, postings - MGMT Meetings (Leadership/Dept Heads, CASA coffee, Priority Jul 12) - MGMT Acting Division Head (Jul 6-9), Andrei Triweekly (Jul 16) - ADMIN DOE review panel (Jul 7-8) - OPS Meetings (08:00 daily, BTeam, rec to hire meeting for new operator) - HOLIDAY (Jul 5) - VACATION (Jul 9 part day, dental appts etc) Next two weeks (July 19- July 30) - EIC Meetings (management, RF, crab, cooling, impedance, team, R&D, beam-beam) - EIC Meetings (second IR), resource planning (critical hires), L2 risk assessment - EIC 6.02 Work/Milestones towards CD-2 (Jul 23) - EIC PSQ@EIC workshop (intermittent, Jul 19-23) - MGMT Critical hire job descriptions, postings - MGMT Meetings (Leadership/Dept Heads, CASA coffee) - ADMIN Summer student talk dry runs (Jul 23) - OPS Meetings (08:00 daily, BTeam) - VACATION (July 28-30)
Alex Bogacz
Previous two weeks (July 5 - July 16) - One-on-one with Rishi - Coordinating/writing a PRAB paper on PERLE - Contributing to White Paper on future CEBAF - Optics design for a recirculated CEBAF injector at 650 MeV - Writeup for Muon Collider Roadmap Panel Next two weeks (July 19 - July 30) - PRAB paper review - Mentoring Isurumali - MED day - Writing a PRAB paper on ‘Beam Dynamics Driven PERLE Design’ - FFA@CEBAF resource planning
Ryan Bodenstein
Previous two weeks (July 5 - July 16) - Operations meetings - B-Team meetings - Summer Student guidance - FFA@CEBAF collab work - Positron/FFA liaison work - LDRD Talk preparation - LDRD Oral presentation - PhD Student guidance - CBETA Meeting Next two weeks (July 19 - July 30) - Operations meetings - B-Team meetings - Summer Student guidance - FFA@CEBAF collab work - Positron/FFA liaison work - PhD Student guidance - PERLE Collaboration Meeting
Rui Li
Previous two weeks (July 5 - July 16) - Write a recommendation letter for a BNL colleague for his green card application - Help Riad with a CSR impedance problem in their EDM proposal - Tune space exploration for the CBB and TCBI problem - Prepare to write a paper summarizing our studies of the CBB and TCBI problem Next two weeks (July 19 - July 30) - Collective effects in Riad, Vasiliy, Slava's EDM proposal - I'm requested by Riad and Slava to look at the CSR and microbunching instability problems in their EDM ring - I started to look at both problems. It may take some time for me to finish these studies - CBB and TCBI - Continue with the tune space exploration - Thinking about how to improve the model so as to eliminate the artificial tune dependence of the TCBI growth rate resulted from the over-simplification of the model in our study - Continue to summarize my results in preparation for paper writing---there are too many results that need to be organized for this report - Responded to Chris Mayes request about my view of recent development of 2D/3D CSR modeling, in support to his preparation for article writing on this topic for the upcoming ICFA newsletter
Edy Nissen
Previous two weeks (July 5 - July 16) - Worked on finalizing DODGE paper - Worked on learning WARP to simulate future DODGE experiments - Attended beam-beam task force meetings Next two weeks (July 19 - July 30) - Submitted DODGE paper to signature queue - Attended RCS task force meeting - Started reaching out to WARP experts to get the software working
Chris Tennant
Previous two weeks (July 5 - July 16) - Next two weeks (July 19 - July 30) -
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (July 5 - July 16) - Next two weeks (July 19 - July 30) -
Bhawin Dhital
Previous two weeks (July 5 - July 16) - I was working with new lattice design with isochronous arc. Initial particle tracking was performed. Next two weeks (July 19 - July 30) - I will be working on dual energy storage ring cooler design with new design using isochronous arc lattice. Further modi�cations and stability criteria of such a new lattice will be carried out. More calculations with particle tracking simulations will be carried out
Amy Sy
Previous two weeks (July 5 - July 16) - Laser particle counter: Continued data analysis of 6-channel data with 1-2 Hz wire sweeping rate. Vendor visit on July 6 focused on observation of different operating modes and implications on event identification both pre and post data analysis. Currently seeing 3-4 operating modes in which events are often seen in one of the two available signals per channel, and trying to understand why channels switch between operating modes as the system settles. Vendor returned on July 14 with updated software allowing for higher data resolution in both signals (shared bandwidth between the two signals) and an updated algorithm for offline analysis of the signals that relies on calculating and subtracting a noise spectrum from the raw data. - Discussion with M. Poelker on studies of gas bremsstrahlung in the CEBAF linacs, possibility of detection using radiation monitors, and mitigation efforts including ion clearing gaps. Literature study on gas bremsstrahlung in electron storage rings and ion clearing methods at Cornell. Discussion with M. Poelker and J. Grames on July 12. Next two weeks (July 19 - July 30) - Literature study on gas bremsstrahlung in electron storage rings and ion clearing methods. Working with J. Grames and M. Poelker to continue studies of gas bremsstrahlung in the CEBAF linacs. - Laser particle counter: Continued system debugging, optimization, and data analysis to better understand operational modes. Swapped the sensors driving channels 0 and 2 to test whether the noise in channel 0 is fiber driven or sensor driven. Vendor will return July 27-28 with remaining 18 sensors for full 24 channel capability. The additional sensors should have better signal to noise response than the initial 6 channels.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (July 5 - July 16) - OPS: - BTEAM meeting - BTEAM coordination - Analysis of previous machine Downtime, developing new metrics to track tune time - OTHER: - CEBAF: - CED updates for upcoming run - Optics development for Hall A and Moller collaboration - USPAS: - exercises grading - setting up latex templates for springer verlag book chapter - literature search,reading Next two weeks (July 19 - July 30) - CEBAF machine recovery - Developing new schemes for extracting transfer matrices in the injector region - Optics development - Bteam coordination+meetings - USPAS meeting on book writing - Looking at AI opportunities for machine fault detection/reliability.
Randi Gamage
Previous two weeks (July 5 - July 16) - Next two weeks (July 19 - July 30) -
River Huang
Previous two weeks (July 5 - July 16) - EIC Beam-Beam project: Collaborating with Vasiliy Morozov, Yun Luo, Yuhong Zhang and other colleagues, studying on the emittance growth caused by the phase noise in the crab cavity and further testing particles’ tracking by using CASA-BeamBeam. Next two weeks (July 19 - July 30) - Continue working on EIC Beam-Beam project.
Isurumali Neththikumara
Previous two weeks (July 5 - July 16) - Reading on SVD and check on possibilities of applying it on 10-pass twiss data. - Try to reduce the dataset using a cutoff singular value. - Plotted all the basis vectors (U & Vt unitary matrices) to see if there is any significant noisy behavior. - Looking for a python NSGA module with parallelizing capabilities. Next two weeks (July 19 - July 30) - Understand SVD results and try to interpret results.
Dennis Turner
Previous two weeks (July 5 - July 16) - AIPINJ - Fixed PREINJ deck to start at 19cm downstream of the cathode instead of 19.5cm. I misunderstood what Alicia gave me. - Fixed element positions in the PREINJ deck so that the deck and Alicia's GPT model better agree. - Rematch the PREINJ deck for the new element positions. - Submitted ATLis for Ops to take matching data at 5MeV and 0R. - Verified the qsUtility templates for 5MeV and 0R are correct. - MDR1I02 coil fixture rotation study - Wien quad matching studies. - Submitted ATLis to test the draft Aperture Scan procedure. - HLA - Hot checkout of RF RATN Trim Up/Down - Added logic to cs2sdds to deal with Wien filter matrix files - Created a CSUE app to generate Wien matrix files for arbitrary configurations. - Further eDT tweaks for energy scaling - Attended AI Lunch Series Accelerator Seminars, Summer Lecture Series -Attended 0800, BTeam, AIPINJ, AI FOA meetings Next two weeks (July 19 - July 30) - AIPINJ - Merged new PREINJ deck into setup910 and then Ops - Performed injector energy measurement and set the injector energy upon recovery of 0L04-4 - Performed 5MeV and 123MeV Injector match - Tested the draft Injector Matching procedure -Work with Joe Grames to calibrate early Injector viewers for beam size measurements - HLA - Work on fix for missing elements in csGUI - Address qsUtility matchingTool elegant output not showing - Address matchingTool optimization_variable vs optimization_covariable bug - UITF - Agreed to become a qualified UITF operator - Completed UITF Operator Moodle modules - Recieved new survey data; Need to make the new elegant deck and import into UED - Optics On-Call - Aperture scan procedure updates - Attended 0800, BTeam, AI FOA, AIPINJ meetings
He Zhang
Previous two weeks (July 5 - July 16) - Finished first draft for JOSS on TPSA lib and compiled successfully. Need final editing. - Updated the TPSA lib to fit the JOSS requirement - FMM paper in progress. Next two weeks (July 19 - July 30) - Submit the JOSS paper - Finish a draft for FMM paper. - Finish a report to close the cooling code benchmark project
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (July 5 - July 16) - Next two weeks (July 19 - July 30) -
Joe Gubeli
Previous two weeks (July 5 - July 16) - Isotopes – - ARDDOT - Next two weeks (July 16 - July 30) - Isotopes – - ARDDOT –
Michael Tiefenback
Previous two weeks (July 5 - July 16) - Next two weeks (July 19 - July 30) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (July 5 - July 16) - Prepared and presented presentation for LDRD proposal - Derived phase an amplitude specifications for harmonic RF for the EIC cooler ERL - Reviewed FEL laser optics procurements for export control sensitivity - Reviewed new Laser Safety sections of the ES&H manual - Attended the Symposium on the Accelerator R&D Roadmap for the HEP Community - Started putting together quarterly report for the Innovative High Energy Cooling project Next two weeks (July 19 - July 19) - Complete and submit quarterly report for the "Innovative High Energy electron cooling for the EIC" contract. - Continue developing longitudinal model for CeC ERL on LiTrack - Review several papers. - Assist in writing the Isotope program final report. - Rewrite and submit the LOSP for User Lab 4
Andrew Hutton
Previous two weeks (July 5 - July 16) - Isotopes: a really busy time with several meetings with UVA and NMT. As it stands, UVA will proceed with a proposal that is purely biological, and Jefferson Lab and NMT will not be involved. - ERL:I gave my ERL talk () on Friday July 9 to about 145 people. This took up a lot of time. The ERL sub-Panel took up even more time as we have wrestled with understanding the CERC. I had the last meeting on the CERC as well as the first meeting where Telnov presented the ERLC. I foresee another frenetic round of interactions between the sub-Panel members who are incredibly active - I regularly have a dozen emails early in the morning as the others get up before me! I contacted Wim Leemans, now at DESY, to try and talk him into participating in PERLE. No follow up from DESY yet. With the loss of Frank Marhauser and all the EIC work, I do not see Jefferson Lab having a big involvement in the SRF for PERLE, so maybe we can work with DESY to participate in the SRF. Hopefully, Alex will be able to continue leading the optics studies. - HIPERLAC: I responded to questions from Leigh and prepared and delivered a talk (attached). - ALcC: we had a meeting on July 13 to discuss the ILC status. Next two weeks (July 19 - July 30) - Isotopes: a really busy time with several meetings with UVA and NMT. As it stands, UVA will proceed with a proposal that is purely biological, and Jefferson Lab and NMT will not be involved. NMT will lead a proposal to study Scandium47 with irradiations at the Idaho Accelerator Center. We would probably be involved in targeted - still being worked out. The end of project write up for our current isotope funding is due July 30, I haven’t yet started to put it together. - ERL: I gave my ERL talk File:ERL RD Roadmap July 2021.pdf on Friday July 9 to about 145 people. This took up a lot of time. The ERL sub-Panel took up even more time as we have wrestled with understanding the CERC. Next week, I will have the last meeting on the CERC as well as the first meeting where Telnov will present the ERLC. I foresee another frenetic round of interactions between the sub-Panel members who are incredibly active - I regularly have a dozen emails early in the morning as the others get up before me! I contacted Wim Leemans, now at DESY, to try and talk him into participating in PERLE. We will have a video-conference next week. With the loss of Frank Marhauser and all the EIC work, I do not see Jefferson Lab having a big involvement in the SRF for PERLE, so maybe we can work with DESY to participate in the SRF. Hopefully, Alex will be able to continue leading the optics studies. - HIPERLAC: I responded to questions from Leigh and next week I have to prepare a talk. - ALcC: we will have a meeting on July 13 to discuss the ILC status.