Difference between revisions of "2017-09-18"

From Administrative
Jump to navigation Jump to search
(Created page with " ---- '''LERF (S. Benson)''' September 5-15 *Prepared talks for JPos17, COOL17, and EIC collaboration meeting *Attended JPos17 and organized LERF tour *Continued t...")
 
Line 1: Line 1:
  
 +
----
 +
'''Accelerator Physics (T. Satogata)''' <br>
 +
Todd Satogata
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - JLEIC: Continue assembling documents, pCDR meetings/planning
 +
      - JLEIC: Continued esme simulations for coasting beam instability evaluation
 +
      - ADMIN: AAC review preparations, talk (Sep 13-15)
 +
      - IPAC18: invited program followup, registration SPMS work
 +
      - OPS: BTeam (Sep 5), ATLis cleanup, documentation
 +
      - ODU: USPAS January 2018 class coordination
 +
      - ODU: JMU PHYS 417 class sharing, 4-VA inquiries
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - ADMIN: Appraisal training (Sep 19)
 +
      - OPS: BTeam (Sep 19), ATLis cleanup, troubleshooting guide, RSR accounting
 +
      - IPAC18: invited program finalization, registration opening
 +
      - JLEIC: Continue assembling documents, pCDR meetings/planning
 +
      - JLEIC: Continued esme simulations for coasting beam instability evaluation
 +
      - ODU: USPAS January 2018 class coordination (registration opening)
 +
      - ADMIN: Attend Neil Symposium (Sep 27)
 +
      - JMU seminar/trip (Sep 29)
  
 +
Alex Bogacz
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - IPAC18: APS scientific publication board org for light peer review
 +
      - JLEIC/PERLE: Talks on synergy, planning at LHeC workshop and AAC
 +
      - ADMIN: AAC review preparations, talk (Sep 13-15)
 +
      - USPAS: Continue work on lectures for "Practical Accelerator Design"
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - NUFACT: NUFACT'17, talk on "Muon Acceleration for Neutrino Factory and Beyond"
 +
      - IPAC18: Continue APS scientific publication board org for light peer review
 +
      - ADMIN: Invention disclosure review, TRC work
  
 +
David Douglas
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - VACATION: Aug 28-Sep 5
 +
      - ADMIN: Office cleaning, housekeeping, throwing away/recycling
 +
      - ADMIN: Inordinate time spent with travel; working to shorten BNL time
 +
      - ADMIN: Couple of reviews, including one PRAB review paper
 +
      - PERLE: Fire drill on PERLE motivations (Sep 11-12)
 +
      - JLEIC: Working through implications of Slava tilted solenoid concept
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - JLEIC: More work beating on tilted solenoid, comparison to DIMAD
 +
      - JLEIC: respond to any results Chris develops on the simple CCR
 +
        arcs (and write up the simple arc)
 +
      - ADMIN: Continue prep of talks for collaboration meeting and Bonn
 +
      - PERS: sedation - which I'm going to need if travel planning
 +
        doesn't settle down...
 +
      - ADMIN: Particplate/planning for Neil symposium (Sep 27)
  
 +
Rui Li
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - ADMIN: take care matters in thesis award committee (may delay
 +
        Cheng-Ying's nomination to next year to avoid conflict)
 +
      - ADMIN: listen to talks at the AAC
 +
      - JLEIC: discuss with Kirsten about her puzzle found in the ASTRA
 +
        simulation of the magnetized beam transport---possible signal
 +
        to noise problem
 +
      - JLEIC: discuss with Salvador on his studies of crab cavity HOM
 +
        coupled-bunch instability---the Rs and Q are orders of
 +
        magnitude bigger than those found in accelerating cavities,
 +
        suggested him to check similar data from existing crab cavities
 +
        to see whether others have better HOM damping
 +
      - ADMIN: get to know Eric's plan for his Fulbright application,
 +
        in preparing recommendation letter
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - JLEIC: start to work on slides summarizing my understanding of
 +
        electron cloud in JLEIC (for presentation at R&D meeting)
 +
      - JLEIC: start to work on slides summarizing JLEIC collective
 +
        effects for the upcoming collaboration meeting in BNL
 +
      - ADMIN: continue to work on matters for the thesis award
 +
        committee (deadline is 9/16)
  
 +
Ed Nissen
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - ADMIN: Attend JPos
 +
      - JLEIC: Further work on phase space painting, booster space
 +
        charge acceleration simulations.
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - JLEIC: Further work on phase space painting, booster space
 +
        charge acceleration simulations.
  
 +
Chris Tennant
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - ADMIN: FFAG Workshop: Sep 6-7 (school), Sep 8-11 (workshop)
 +
      - JLEIC: (re-)learning Bmad
 +
      - VACATION: Sep 12-15
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - JLEIC: analyze CCR arc with Bmad
 +
      - JLEIC: learn to use Bmad with CSR shielding (benchmark with
 +
        other codes)
 +
      - JLEIC: uBI gain for CCR arc (learn to use Cheng-Ying's code for
 +
        magnetized beams)
 +
      - PERLE: uBI gain for PERLE (learn to use Cheng-Ying's code
 +
        including acceleration)
  
 +
Randy Gamage
 +
    Previous two weeks (Sep 4-Sep 15)
 +
      - Dissertation writing: Continue coasting beam chapter, tech note
 +
    Next two weeks (Sep 18-Sep 29)
 +
      - Dissertation writing: Hopefully coasting beam chapter, tech note
  
  
 +
----
 +
'''Accelerator R and D (Y. Zhang)'''<br>
 +
<br>
 +
No report.
 +
 +
 +
----
 +
'''Computational Physics (R. Roblin)'''<br>
 +
<br>
 +
No report.
 +
 +
 +
----
 +
'''Diagonistic Development (K. Jordan)'''<br>
 +
<br>
 +
No report.
  
  

Revision as of 08:39, 18 September 2017


Accelerator Physics (T. Satogata)
Todd Satogata

   Previous two weeks (Sep 4-Sep 15)
     - JLEIC: Continue assembling documents, pCDR meetings/planning
     - JLEIC: Continued esme simulations for coasting beam instability evaluation
     - ADMIN: AAC review preparations, talk (Sep 13-15)
     - IPAC18: invited program followup, registration SPMS work
     - OPS: BTeam (Sep 5), ATLis cleanup, documentation
     - ODU: USPAS January 2018 class coordination
     - ODU: JMU PHYS 417 class sharing, 4-VA inquiries
   Next two weeks (Sep 18-Sep 29)
     - ADMIN: Appraisal training (Sep 19)
     - OPS: BTeam (Sep 19), ATLis cleanup, troubleshooting guide, RSR accounting
     - IPAC18: invited program finalization, registration opening
     - JLEIC: Continue assembling documents, pCDR meetings/planning
     - JLEIC: Continued esme simulations for coasting beam instability evaluation
     - ODU: USPAS January 2018 class coordination (registration opening)
     - ADMIN: Attend Neil Symposium (Sep 27)
     - JMU seminar/trip (Sep 29)

Alex Bogacz

   Previous two weeks (Sep 4-Sep 15)
     - IPAC18: APS scientific publication board org for light peer review
     - JLEIC/PERLE: Talks on synergy, planning at LHeC workshop and AAC
     - ADMIN: AAC review preparations, talk (Sep 13-15)
     - USPAS: Continue work on lectures for "Practical Accelerator Design"
   Next two weeks (Sep 18-Sep 29)
     - NUFACT: NUFACT'17, talk on "Muon Acceleration for Neutrino Factory and Beyond"
     - IPAC18: Continue APS scientific publication board org for light peer review
     - ADMIN: Invention disclosure review, TRC work

David Douglas

   Previous two weeks (Sep 4-Sep 15)
     - VACATION: Aug 28-Sep 5
     - ADMIN: Office cleaning, housekeeping, throwing away/recycling
     - ADMIN: Inordinate time spent with travel; working to shorten BNL time
     - ADMIN: Couple of reviews, including one PRAB review paper
     - PERLE: Fire drill on PERLE motivations (Sep 11-12)
     - JLEIC: Working through implications of Slava tilted solenoid concept
   Next two weeks (Sep 18-Sep 29)
     - JLEIC: More work beating on tilted solenoid, comparison to DIMAD
     - JLEIC: respond to any results Chris develops on the simple CCR
       arcs (and write up the simple arc)
     - ADMIN: Continue prep of talks for collaboration meeting and Bonn
     - PERS: sedation - which I'm going to need if travel planning
       doesn't settle down...
     - ADMIN: Particplate/planning for Neil symposium (Sep 27)

Rui Li

   Previous two weeks (Sep 4-Sep 15)
     - ADMIN: take care matters in thesis award committee (may delay
       Cheng-Ying's nomination to next year to avoid conflict)
     - ADMIN: listen to talks at the AAC
     - JLEIC: discuss with Kirsten about her puzzle found in the ASTRA
       simulation of the magnetized beam transport---possible signal
       to noise problem
     - JLEIC: discuss with Salvador on his studies of crab cavity HOM
       coupled-bunch instability---the Rs and Q are orders of
       magnitude bigger than those found in accelerating cavities,
       suggested him to check similar data from existing crab cavities
       to see whether others have better HOM damping
     - ADMIN: get to know Eric's plan for his Fulbright application,
       in preparing recommendation letter
   Next two weeks (Sep 18-Sep 29)
     - JLEIC: start to work on slides summarizing my understanding of
       electron cloud in JLEIC (for presentation at R&D meeting)
     - JLEIC: start to work on slides summarizing JLEIC collective
       effects for the upcoming collaboration meeting in BNL
     - ADMIN: continue to work on matters for the thesis award
       committee (deadline is 9/16)

Ed Nissen

   Previous two weeks (Sep 4-Sep 15)
     - ADMIN: Attend JPos
     - JLEIC: Further work on phase space painting, booster space
       charge acceleration simulations.
   Next two weeks (Sep 18-Sep 29)
     - JLEIC: Further work on phase space painting, booster space
       charge acceleration simulations.

Chris Tennant

   Previous two weeks (Sep 4-Sep 15)
     - ADMIN: FFAG Workshop: Sep 6-7 (school), Sep 8-11 (workshop)
     - JLEIC: (re-)learning Bmad
     - VACATION: Sep 12-15
   Next two weeks (Sep 18-Sep 29)
     - JLEIC: analyze CCR arc with Bmad
     - JLEIC: learn to use Bmad with CSR shielding (benchmark with
       other codes)
     - JLEIC: uBI gain for CCR arc (learn to use Cheng-Ying's code for
       magnetized beams)
     - PERLE: uBI gain for PERLE (learn to use Cheng-Ying's code
       including acceleration)

Randy Gamage

   Previous two weeks (Sep 4-Sep 15)
     - Dissertation writing: Continue coasting beam chapter, tech note
   Next two weeks (Sep 18-Sep 29)
     - Dissertation writing: Hopefully coasting beam chapter, tech note



Accelerator R and D (Y. Zhang)

No report.



Computational Physics (R. Roblin)

No report.



Diagonistic Development (K. Jordan)

No report.



LERF (S. Benson)

September 5-15

  • Prepared talks for JPos17, COOL17, and EIC collaboration meeting
  • Attended JPos17 and organized LERF tour
  • Continued to clean up the materials moved from the trailers to the LERF
  • Discussed possible proposal for positron source at the LERF
  • Worked on possible CRADA for high efficiency FEL development
  • Debriefed with CI officers about the CRADA

September 18-29

  • Attend COOL17 and present talk on bunched beam cooler
  • Attend Neil Symposium and host the speakers
  • Complete detailed statement of work for CRADA
  • Writeup JPos publication