'''Accelerator Physics - T. Satogata (Interim CASA Department Head)'''<br>
 
'''Accelerator Physics - T. Satogata (Interim CASA Department Head)'''<br>
 
Todd Satogata
 
Todd Satogata
  Previous two weeks (June 25-July 6)
+
  Previous two weeks (July 9-July 20)
      - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
+
    - ADMIN: Leadership/group meetings, staffing input and planning
      - JLEIC: Peter McIntyre meeting (Jun 26)
+
    - ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
      - JLEIC: Summer student work on Booster simulations, training
+
    - JLEIC: pCDR writing, template, impedance/HE/R&D meetings
      - JACoW: JBoD telecon (Jun 29), post/review meeting minutes
+
    - JLEIC: Summer student work on Booster simulations, training
      - ADMIN: Leadership/group meetings, staffing input and planning
+
    - ODU: Randy PhD defense (Jul 12, passed!)
      - ADMIN: Director Ops review (Jun 26-28)
+
  Next two weeks (July 23-Aug 3)
      - ODU: Continue Randy advising, dissertation draft finalization
+
    - ADMIN: Leadership/group meetings, staffing input and planning
  Next two weeks (July 9-July 20)
+
    - ADMIN: DOE Operations Review (Jul 25-26)
      - ADMIN: Leadership/group meetings, staffing input and planning
+
    - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
      - ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
+
    - JLEIC: Complete Booster vacuum tech note calculations
      - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
+
    - JLEIC: NAS report release presentation (Jul 24)
      - JLEIC: Complete Booster vacuum tech note calculations
+
    - JLEIC: Summer student work on Booster simulations, training
      - JLEIC: Summer student work on Booster simulations, training
+
    - JLEIC: EIC User's Group Meeting (Catholic University, Jul 30-Aug 2)
      - IPAC18: Finalize proceedings, IPAC'18 delegate survey report
+
    - JLEIC: Summer student poster session (Aug 3)
      - JACoW: Publishing script updates, fix PDF index of PAC'95
+
    - IPAC18: Finalize proceedings, IPAC'18 delegate survey report
      - ODU: Randy PhD defense (Jul 12)
 
  
 
Alex Bogacz
 
Alex Bogacz
    Previous two weeks (June 25-July 6)
+
  Previous two weeks (July 9-July 20)
      - PERLE: Attend PERLE collaboration meeting (Jun 26, Orsay)
+
    - VACATION: Jul 9-Jul 13
      - PERLE: Attend LHeC/FCCeh/PERLE workshop (Jun 27-29, Orsay)
+
    - ADMIN: Phys Rev Accel Beams paper review
      - PERLE: Present two talks at above meetings
+
  Next two weeks (July 23-Aug 3)
      - ADMIN: Attend ARIES Muon Collider Workshop (Jul 1-3, Padova)
+
    - MUONS: Summary on muon acceleration for European Strategy Group
      - ADMIN: Present two talks at ARIES Muon Collider Workshop
+
    - PERLE: Refinement on PERLE lattice
    Next two weeks (July 9-July 20)
+
    - PERLE: Refinement on the LHeC ERL lattice
      - VACATION: Jul 9-Jul 13
 
      - ADMIN: Phys Rev Accel Beams paper review
 
  
 
Rui Li
 
Rui Li
    Previous two weeks (June 25-July 6)
+
  Previous two weeks (July 9-July 20)
      - JLEIC: Presented the LCBI for Frank's new HOM coupler design at
+
    - JLEIC: Finished the transverse coupled bunch instability (TCBI)
        the impedance meeting.
+
      calculations using ZAP and my mathematica. Get good
      - JLEIC: Assessment of the behavior of collective effects in
+
      agreement. And the mathematica gives more details of the
        higher current regime of e-beam (E>10GeV), in responding to
+
      particular HOM that cause the high growth rate that would help
        Yuhong's question for the high-energy JLEIC.
+
      the SRF people to improve their HOM damper design for
      - JLEIC: Collected the e-ring new parameters from Fanglei,
+
      mitigating the instability
        Vasiliy will later send me new parameters for the p-ring. These
+
    - JLEIC: Finished my writing for the ICFA newsletter. When
        may change the behavior of LCBI which is very sensitive to
+
      checking more details of my preCDR writing and hoping to use it
        parameters.
+
      for the ICFA newsletter, I found many details in my preCDR
      - JLEIC: Calculated growth time for the transverse coupled bunch
+
      writing can be improved -- the statement can be more precise,
        instability (TCBI) for Frank's new HOM design using ZAP, and
+
      and estimations can be done with more consistent formulas. I
        see no improvement of the growth rate for the new HOM coupler
+
      will send you my ICFA newsletter writing as the new version of
        design from that of the old one.
+
      my preCDR writing, probably later today or early next week.
      - JLEIC: Working on the Mathematica calculation of TCBI, so as to
+
     
        identify the HOM resonance that gives dominant contribution to
+
  Next two weeks (July 23-Aug 3)
        growth rate, so the RF people can work on mitigation of these
+
    - JLEIC: Summarize the LCBI and TCBI results and be ready to
        HOM.
+
      present at JLEIC R&D meeting and for technote writeup
    Next two weeks (July 9-July 20)
+
    - JLEIC: Going over the whole list of collective effects for
      - JLEIC: Finish my part of the ICFA newsletter writing
+
      JLEIC, understand what has been done and what need to be done
      - JLEIC: Continue to finish the Mathematica calculation of TCBI
+
      (especially the work need to be done before the next
        and its comparison with ZAP
+
      collaboration meeting), and make a list of plan for my studies
      - JLEIC: Summarize the LCBI and TCBI results for exchange with
+
      in the next several month
        the RF people
 
      - JLEIC: Estimate the resistive wall impedance in JLEIC e-ring
 
        and ion ring
 
  
 
Edy Nissen
 
Edy Nissen
    Previous two weeks (June 25-July 6)
+
  Previous two weeks (July 9-July 20)
      - JLEIC: Answered LDRD questions posed by reviewers
+
    - JLEIC: Mainly working on the booster working point
      - JLEIC: Created presentation slides for LDRD review
+
      issue. Have gone from <50% to 63% beam survival.
      - JLEIC: Determined that the acceleration anomaly in synergia is
+
    - JLEIC: The longitudinal anomaly appears to be some sort of
        caused by space charge, not bucket shape changes or higher order
+
      artifact of using 2d space charge, so this has been
        nonlinear dispersions.
+
      discontinued, unfortunately this makes calculations very slow
      - JLEIC: Gave LDRD Presentation
+
    - JLEIC: Assisted in formatting word tables into latex for the
      - VACATION: June 25, July 2-3
+
      pCDR
    Next two weeks (July 9-July 20)
+
  Next two weeks (July 23-Aug 3)
      - JLEIC: Work on booster working point simulations to eliminate
+
    - JLEIC: Continue the working point simulations
        the acceleration anomaly
+
    - JLEIC: Work on transfer lines as soon as the geometric data is
      - JLEIC: Work with summer student on injection modeling for the
+
      available
        booster
+
    - JLEIC: Provide any additional assistance to the pCDR
  
 
Chris Tennant
 
Chris Tennant
    Previous two weeks (June 25-July 6)
+
  Previous two weeks (July 9-July 20)
      - VACATION: July 5-6
+
    - VACATION: July 16-19
      - JLEIC: working through issues with cooler to get a consistent S2E
+
    - JLEIC: seek counsel for path forward with S2E
      - JLEIC: re-tune ERL arc to accept longer bunch from injector
+
    - JLEIC: pCDR writing
      - JLEIC: mBI analysis of cooler "Simple Arc"
+
  Next two weeks (July 23-Aug 3)
      - PERLE: wrap up PERLE TN
+
    - ADMIN: Catch up from time away
    Next two weeks (July 9-July 20)
+
    - LERF: isotope kick-off meeting
      - VACATION: July 16-19
+
    - JLEIC: editing/writing pCDR (this will be a common theme in
      - JLEIC: seek counsel for path forward with S2E
+
      future biweeklies)
      - JLEIC: pCDR writing
 
 
 
  
 
----
 
----

Revision as of 13:08, 20 July 2018

In Progress

Director - M. Spata
No report. Accelerator Division Office.



Accelerator Physics - T. Satogata (Interim CASA Department Head)
Todd Satogata

 Previous two weeks (July 9-July 20)
    - ADMIN: Leadership/group meetings, staffing input and planning
    - ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
    - JLEIC: pCDR writing, template, impedance/HE/R&D meetings
    - JLEIC: Summer student work on Booster simulations, training
    - ODU: Randy PhD defense (Jul 12, passed!)
 Next two weeks (July 23-Aug 3)
    - ADMIN: Leadership/group meetings, staffing input and planning
    - ADMIN: DOE Operations Review (Jul 25-26)
    - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
    - JLEIC: Complete Booster vacuum tech note calculations
    - JLEIC: NAS report release presentation (Jul 24)
    - JLEIC: Summer student work on Booster simulations, training
    - JLEIC: EIC User's Group Meeting (Catholic University, Jul 30-Aug 2)
    - JLEIC: Summer student poster session (Aug 3)
    - IPAC18: Finalize proceedings, IPAC'18 delegate survey report

Alex Bogacz

  Previous two weeks (July 9-July 20)
    - VACATION: Jul 9-Jul 13
    - ADMIN: Phys Rev Accel Beams paper review
  Next two weeks (July 23-Aug 3)
    - MUONS: Summary on muon acceleration for European Strategy Group
    - PERLE: Refinement on PERLE lattice
    - PERLE: Refinement on the LHeC ERL lattice

Rui Li

  Previous two weeks (July 9-July 20)
    - JLEIC: Finished the transverse coupled bunch instability (TCBI)
      calculations using ZAP and my mathematica. Get good
      agreement. And the mathematica gives more details of the
      particular HOM that cause the high growth rate that would help
      the SRF people to improve their HOM damper design for
      mitigating the instability
    - JLEIC: Finished my writing for the ICFA newsletter. When
      checking more details of my preCDR writing and hoping to use it
      for the ICFA newsletter, I found many details in my preCDR
      writing can be improved -- the statement can be more precise,
      and estimations can be done with more consistent formulas. I
      will send you my ICFA newsletter writing as the new version of
      my preCDR writing, probably later today or early next week.
      
  Next two weeks (July 23-Aug 3)
    - JLEIC: Summarize the LCBI and TCBI results and be ready to
      present at JLEIC R&D meeting and for technote writeup
    - JLEIC: Going over the whole list of collective effects for
      JLEIC, understand what has been done and what need to be done
      (especially the work need to be done before the next
      collaboration meeting), and make a list of plan for my studies
      in the next several month

Edy Nissen

  Previous two weeks (July 9-July 20)
    - JLEIC: Mainly working on the booster working point
      issue. Have gone from <50% to 63% beam survival.
    - JLEIC: The longitudinal anomaly appears to be some sort of
      artifact of using 2d space charge, so this has been
      discontinued, unfortunately this makes calculations very slow
    - JLEIC: Assisted in formatting word tables into latex for the
      pCDR
  Next two weeks (July 23-Aug 3)
    - JLEIC: Continue the working point simulations
    - JLEIC: Work on transfer lines as soon as the geometric data is
      available
    - JLEIC: Provide any additional assistance to the pCDR

Chris Tennant

  Previous two weeks (July 9-July 20)
    - VACATION:  July 16-19
    - JLEIC: seek counsel for path forward with S2E
    - JLEIC: pCDR writing
  Next two weeks (July 23-Aug 3)
    - ADMIN: Catch up from time away
    - LERF: isotope kick-off meeting
    - JLEIC: editing/writing pCDR (this will be a common theme in
      future biweeklies)

Accelerator R & D - Y. Zhang
Fanglei Lin

  • Provided JLEIC electron polarization contribution to the ICFA Beam Dynamics Newsletter.
  • Provided the new electron ring parameters to Tim's group, Leigh, Rui and Shaoheng.
  • Working with the student on the storage ring cooler.
  • Miscellaneous: attended a meeting with Peter McIntyre, attended the JLEIC R&D meeting, attended JLEIC cooler project kickoff meeting, attended JLEIC general meeting.


Vasiliy Morozov

  • My main activities in the past two weeks were:
    • Geometry tagging LDRD: simulations and data analysis.
    • Ion beam loss studies: work with Hannah on beam loss simulations
    • Writing of ICFA news letter contribution
  • Main activities planned for the next two weeks:
    • Preparation of DoE R&D quarterly report
    • Ion collider ring design
    • Beam loss studies
    • Writing of ICFA news letter and pCDR


Amy Sy

    • Prepared and gave presentation on LDRD proposal "Laser driven polarized D source for JLEIC" at LDRD review.
    • Working on Skew PIC closeout report.
    • Starting simulations of transverse feedback system in the ion collider ring. Using Elegant lattice with injection optics to study effects of injection errors on beam stability.


Guohui Wei

  • On Leave


Yuhong Zhang

  • Continued development of HE-JLEIC design concept
  • Gave a presentation at LDRD proposal review
  • Started R&D activities on two FOA grants (bunched beam electron experiment and micro-bunching based coherent electron cooling)
  • Continued writing pre-CDR
  • Started editing of ICFA beam dynamics newsletter



Computational Physics - Y. Roblin
Kirsten Deitrick:

  • Last two weeks:
    • Magnetized beam (LEFR PoP):
    -correct magnetization damage after FEL booster with off-axis travel through skew quad (prepping to run/optimize on cluster)
    -start looking at magnetization preservation through merger designs
    • Straight Merger at CBETA:
    -finish data analysis
    -begin simulations
    -present preliminary results in JLEIC R&D meeting
    • eCloud:
    -finish text for preCDR
    -get other cold section magnet properties from Vasiliy/Fanglei
    • Impedance:
    -best/worst case for electron ring impedance scenario
    -meeting (present above + feedback kickers in various machines)
    • Meetings:
    -Impedance
    -Cooler (x2)
    -JLEIC (x1)
    • Misc:
    -DOE Travel to China brief reading
    -Introduction for Summer Lecture Series (x2), subbing for Geoff Krafft
    -Raemaad GPT help (Geoff's student)
  • Next two weeks:
    • Magnetized beam (LERF PoP):
    -look at 3D FEL booster optimization results
    -magnetization preservation through merger designs
    • Straight Merger at CBETA:
    -continue simulations
    -explain discrepancies (qualitative behavior matches relatively well)
    • eCloud:
    -simulate eCloud in quad/sextupole/drift of ion ring using provided parameters (mostly to show density highest in dipoles)
    • Meetings:
    -Cooler (x2)
    -JLEIC (x2)


Yves Roblin:

  • Vacation 7/2 -7/6
  • JLEIC:
    -pCDR writing
    -ICFA paper writing
    -gear changing simulations
  • CEBAF:
    -Bteam
    -prepare ATLIS for August half pass run
    -meeting with Hall A to discuss schedule for the half pass into hall A
    -APEX procedural development and planning
    -model improvement, redoing all the arcs with proper K1 and constraints
  • Next two weeks:
  • JLEIC:
    -pCDR
    -report for FOA 17 supplemental
  • CEBAF:
    -model work, coordinating activity for restart
    -preparing for July 26th OPS prestart talk


Dennis Turner:

  • Last two weeks:
    • Presented ced2elegant and ArcSteer to BTeam 6/26
    • ArcSteer:
    -Odds and ends from BTeam discussions.
    -Completed templates for all 10 arcs and 0R.
    • rayTrace:
    -Discussed requirements with Tief and Yves.
    -Began work on data collection. Studied existing rayTrace code.
    • Minor bugfixes and documentation updates for ced2elegant, etc.
  • Out of town 6/29 to 7/1.
  • Sick 7/2 to 7/3.
  • Holiday 7/4.
  • Next two weeks:
    • Continue work on rayTrace.
    • Continue to get dispersionTool ready for further testing and release.
    • Test ArcSteer in 0R if the opportunity arises.


He Zhang:

  • JSPEC Development

Tested the codes that calculates the electron charge density inside an arbitrary electron bunch. The electron bunch is represented by two million particles, which are generated randomly with Gaussian distribution. The electron are loaded into memory and then distributed into a tree structure of boxes. The maximum number of electrons in each childless box is adjustable. This process only needs to be performed once as long as the electron charge distribution is assumed unchanged during the cooling process. The ions are put into a regular grid and the grid density is adjustable. (A regular grid is used only for testing purpose. In real simulation, ions can have any distribution.) Ions are distributed into the boxes and the charge density around the ion is calculated by the electron number inside the box divided by the box volume. Electron density is plotted for a few different grid sizes and the results show the algorithm works as expected. Numerical noises are noticed in the electron density calculation, which is as expected, and the noises reduce as the grid size becomes smaller. Now it is still not clear how much it will affect the cooling rate calculation. It will be tested later.

I am working on fitting the above electron density calculation code into JSPEC for cooling simulations. It needs more changes in the code than I originally expected. A new model of the electron beam has been added. But several interfaces between several modules have to be revised, because in this model the relative electron speed and temperature can change. The UI needs to be updated, too. This work is still in process.

  • Others
    -pCDR writing: Converted the previous writing into Latex and edited it again.
    -ICFA writing: Wrote about mulita-stage cooling strategy and cooling simulation results for both the proton beam and lead ion beam, based on my IPAC’18 paper and pCDR writing.
    -Tech report: I am writing a tech report about the TPSA/DA package that I developed based on Dr. Lingyun Yang’s code.
    -ICAP trip is approved. I was told by Prof. Berz that my talk should be arranged in the first two days. I plan to stay two nights there.
    -NERSC account: submitted the NERSC AUP, trying to re-activate my account.
    -Reviewed a paper for SIVP.
  • Work plan in the following two weeks
    -Continue writing and polishing the pCDR report
    -Test, finish, and document the JSPEC package of cooling with arbitrary electron beam
    -Test the turn-by-turn tracking packge for JSPEC.



Diagnostic Development - K. Jordan
Kevin Jordan

  • Continued efforts on the testing of LCLS-II cryomodules in the LERF. The cable termination should begin this week - effort has suffered due to lack of man power & priority during the SAD.I continue to inventory parts for mechanical assembly of bridging components & end cans.
  • I have been working with Steve Shuring & Jonathan Creel to ensure the LERF transfer line, 1/4 & full cryomodule get cleaned up & cooled down in the next couple weeks when the CHL is reconfigured for operations. The heaters & waveguide needed to be reconfigured from F100 to C20 style cryomodule.
  • Joined Joe on trip to RadiaBeam, this was a preliminary design review of the SBIR-II high speed, high power wire scanner


Joe Gubeli

  • Worked on a new SLM diagnostic for ARC 7. The layout is nearly complete and am waiting on a few specifications from Mike T to finish the design.
  • Had a progress meeting with Radiabeam on the high power, high speed wire scanner. The meeting was very productive. The design is fairly mature with some modifications requested. A timeline and installation location for the various tests were discussed as well.


Michael Tiefenback

  • More followup on magnet integrator tasks, particularly concerning mis-wired quadrupoles. (Two more were found.) We have to be able to _know_ that we're done on this.
  • continuing assessment (with operator Brandi Cade) of cryogenic heat load calibration vs. JT setting to characterize the linac heat load. The benefit will be to guide a better match of RF heat (Q0 dissipation) against resistive heat so that RF state transitions are more transparent to CHL operation. Still looks promising.
  • Continuing on requirements for diagnostic optimization for SLMs in Arc7A and elsewhere. Still investigating resolution issues with Gubeli and hardware.
  • Preparation for CLAS12 accelerator update talk 10 July.



LERF - S. Benson (Done)

  • July 9-20
    • Worked on pCDR editing
    • Completed Quarterly report for 2018 FOA project
    • Held Cooler ring meetings and wrote up minutes.
    • Analyzed use of harmonic RF to enlarge longitudinal acceptance cooler.
    • Wrote up electron cooling section for ICFA BD newsletter
    • Held status meeting for Electron Cooling FOA project
    • Sent out invitation for mini-workshop for ERLs in an EIC
    • Researched application of CSU equipment so that we might keep the CSU laser at the LERF
    • Review GTS magnetized gun paper
  • July 23-Aug. 3
    • Revise LOD for isotope work
    • Attend kickoff meeting for isotope project
    • Analyze CEC study by Stupakov to derive ERL specifications
    • Attend Operations review
    • Try to define HZDR collaboration
    • Write up cooling section of HE-JLEIC appendix

A. Hutton (Done)

  • July 9-20
    • Wrote up trip report from “Electrons for the LHC - LHeC/FCCeh and Perle Workshop in Orsay.” Distributed to JLab Directorate and the ALCC (America’s Linear Collider Committee).
    • Provided beam-loss scenarios for PERLE to help them prepare for nuclear regulatory approval.
    • Read and made comments on the JLEIC PreCDR - this will be a weekly responsibility until October. This was detailed comments on the Chapters assigned to me as well as an overview of all the Chapters looking for inconsistencies.
    • Received an invitation for a plenary talk on transverse cavities at the next HL-LHC Collaboration meeting; started laying out the talk and requesting input from the different labs that have been involved.
    • Initiated preparations for a Kick-Off Meeting for the Isotope Project. Completed ~50% of introduction.