Difference between revisions of "2015-07-24 Diagnostic Development Biweekly Report"

From Administrative
Jump to navigation Jump to search
 
Line 2: Line 2:
 
Biweekly Report:  07/11/15 - 07/24/15<br>
 
Biweekly Report:  07/11/15 - 07/24/15<br>
 
Submitted by:  Pavel Evtushenko<br>
 
Submitted by:  Pavel Evtushenko<br>
 +
  
 
M. Tiefenback<br>
 
M. Tiefenback<br>
Line 14: Line 15:
  
  
P. Evtushenko
+
P. Evtushenko<br>
 
<ul>
 
<ul>
 
<li>prepared talk for the S&T review and presented it at the dry run
 
<li>prepared talk for the S&T review and presented it at the dry run
Line 27: Line 28:
  
  
K. Jordan
+
K. Jordan<br>
 
<ul>
 
<ul>
 
<li>Travel
 
<li>Travel
 
</ul>
 
</ul>

Latest revision as of 08:58, 31 July 2015

CASA Diagnostic Development
Biweekly Report: 07/11/15 - 07/24/15
Submitted by: Pavel Evtushenko


M. Tiefenback

  • finished the paper review
  • participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task
  • continuing engagement with turning the multi-pass steering procedure into an operational tool
  • continuing engagement with hot-wire anemometer mass-flow meter
  • has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered
  • About 2.5 days of personal leave time the past week


P. Evtushenko

  • prepared talk for the S&T review and presented it at the dry run
  • has completed plan of finishing the early career grant work;
  • this includes al tasks, personal required for the work, procurement and labor plan
  • works on various ongoing aspects of the early career grant
  • large fraction of it - discussions with potential manufacturers of system components
  • reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
  • with a combination of SR and OTR; the last revision is declared final
  • reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design


K. Jordan

  • Travel