Line 1: | Line 1: | ||
− | April 15, 2019 Report - April | + | April 15, 2019 Report - April 15 - May 10 |
'''Director - Todd Satogata''' <br> | '''Director - Todd Satogata''' <br> | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
- | - | ||
− | Next two weeks (Apr | + | Next two weeks (Apr 29 - May 10) |
- | - | ||
Alex Bogacz | Alex Bogacz | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - |
− | + | Next two weeks (Apr 29 - May 10) | |
− | + | - | |
− | |||
− | Next two weeks (Apr | ||
− | - | ||
− | |||
− | |||
− | |||
Rui Li | Rui Li | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - |
− | + | Next two weeks (Apr 29 - May 10) | |
− | + | - | |
− | |||
− | |||
− | Next two weeks (Apr | ||
− | - | ||
− | |||
− | |||
Ed Nissen | Ed Nissen | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - |
− | + | Next two weeks (Apr 29 - May 10) | |
− | Next two weeks (Apr | + | - |
− | - | ||
− | |||
Chris Tennant | Chris Tennant | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | + | - | |
− | + | Next two weeks (Apr 29 - May 10) | |
− | - | + | - |
− | |||
− | |||
− | |||
− | |||
− | Next two weeks (Apr | ||
− | - | ||
Line 64: | Line 44: | ||
Fanglei Lin | Fanglei Lin | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - |
− | + | Next two weeks (Apr 29 - May 10) | |
− | + | - | |
− | |||
− | |||
− | |||
− | Next two weeks (Apr | ||
− | - | ||
<br> | <br> | ||
Vasiliy Morozov | Vasiliy Morozov | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - Preparation of the DoE quarterly reports: they were submitted on April 26 |
− | + | - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper | |
− | + | - Two-energy storage ring cooler: study of stability of the longitudinal dynamics | |
− | - | + | |
− | - | + | Next two weeks (Apr 29 - May 10) |
− | + | - Preparation of IPAC'18 papers | |
− | + | - Pre-CDR update | |
− | Next two weeks (Apr | + | |
− | |||
− | - Preparation of | ||
− | |||
− | - | ||
− | |||
− | |||
<br> | <br> | ||
Amy Sy | Amy Sy | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - |
− | + | Next two weeks (Apr 29 - May 10) | |
− | + | - | |
− | |||
− | |||
− | Next two weeks (Apr | ||
− | - | ||
− | |||
<br> | <br> | ||
Yuhong Zhang | Yuhong Zhang | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | + | - | |
− | + | Next two weeks (Apr 29 - May 10) | |
− | + | - | |
− | - | ||
− | Next two weeks (Apr | ||
− | - | ||
<br> | <br> | ||
Line 122: | Line 83: | ||
Yves Roblin | Yves Roblin | ||
CEBAF | CEBAF | ||
− | - | + | - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt |
− | + | optics to the gradient profile of the linac prior to starting ORFP. | |
− | |||
− | |||
− | |||
− | |||
JLEIC: | JLEIC: | ||
− | - | + | - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA. |
+ | - Writing tech note on the implementation of IR multipole kicks in BB3D. | ||
+ | - Gave a presentation on the status of the beam-beam for the new pCDR100 optics | ||
OTHER | OTHER | ||
− | - Attended | + | - Attended the ML seminar |
− | - | + | - Starting to work on the use of deep learning networks for CEBAF (matching with sync light ) |
− | - | + | Next two weeks (Apr 29 - May 10) |
− | - | + | - Fiish tech note on the IR multipole kicks implementation |
− | - | + | - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks |
− | + | - Work on a model for a landau cavity (its 3rd quarter of FOA) | |
+ | |||
+ | +work on optics for the summer run (CEBAF) | ||
+ | |||
<br> | <br> | ||
He Zhang | He Zhang | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - MAD-X | + | - MAD-X 5d Map tracking |
− | - | + | - JSPEC development |
− | + | Next two weeks (Apr 29 - May 10) | |
− | - | + | - Update the manual for the luminosity module. |
− | - | + | - Dispersive cooling (New friction force formulas and benchmark with theory). |
+ | |||
Line 153: | Line 116: | ||
'''Diagnostic Development - Kevin Jordan''' <br> | '''Diagnostic Development - Kevin Jordan''' <br> | ||
− | Previous | + | Previous two weeks (Apr 15 - Apr 26) |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
- | - | ||
+ | Next two weeks (Apr 29 - May 10) | ||
+ | - | ||
Joe Gubeli | Joe Gubeli | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
− | - | + | - |
− | + | Next two weeks (Apr 29 - May 10) | |
− | + | - | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | - | ||
− | |||
Michael Tiefenback | Michael Tiefenback | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
- Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns) | - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns) | ||
- Specify depth of field limiting slit widths for Arc 7 SLM | - Specify depth of field limiting slit widths for Arc 7 SLM | ||
- Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising) | - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising) | ||
- Planning for overall diagnostic system integration, including periodic calibration requirements | - Planning for overall diagnostic system integration, including periodic calibration requirements | ||
− | Next two weeks (Apr | + | Next two weeks (Apr 29 - May 10) |
− | - | + | - Model SyncLightMonitor matching process for arcs |
- Review field map updates for Moller quads requested by Benesch | - Review field map updates for Moller quads requested by Benesch | ||
- Continue on 4) above (diagnostic system integration) | - Continue on 4) above (diagnostic system integration) | ||
Line 205: | Line 147: | ||
'''LERF - Steve Benson''' <br> | '''LERF - Steve Benson''' <br> | ||
− | Previous two weeks (Apr | + | Previous two weeks (Apr 15 - Apr 26) |
- | - | ||
− | + | Next two weeks (Apr 29 - May 10) | |
- | - |
Revision as of 11:06, 20 May 2019
April 15, 2019 Report - April 15 - May 10
Director - Todd Satogata
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Alex Bogacz
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Rui Li
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Ed Nissen
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Chris Tennant
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Accelerator R & D - Yuhong Zhang
Fanglei Lin
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Vasiliy Morozov
Previous two weeks (Apr 15 - Apr 26) - Preparation of the DoE quarterly reports: they were submitted on April 26 - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper - Two-energy storage ring cooler: study of stability of the longitudinal dynamics
Next two weeks (Apr 29 - May 10) - Preparation of IPAC'18 papers - Pre-CDR update
Amy Sy
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Yuhong Zhang
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Computational Physics - Yves Roblin
Yves Roblin
CEBAF - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt optics to the gradient profile of the linac prior to starting ORFP. JLEIC: - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA. - Writing tech note on the implementation of IR multipole kicks in BB3D. - Gave a presentation on the status of the beam-beam for the new pCDR100 optics OTHER - Attended the ML seminar - Starting to work on the use of deep learning networks for CEBAF (matching with sync light ) Next two weeks (Apr 29 - May 10) - Fiish tech note on the IR multipole kicks implementation - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks - Work on a model for a landau cavity (its 3rd quarter of FOA)
+work on optics for the summer run (CEBAF)
He Zhang
Previous two weeks (Apr 15 - Apr 26) - MAD-X 5d Map tracking - JSPEC development Next two weeks (Apr 29 - May 10) - Update the manual for the luminosity module. - Dispersive cooling (New friction force formulas and benchmark with theory).
Diagnostic Development - Kevin Jordan
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Joe Gubeli
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Michael Tiefenback
Previous two weeks (Apr 15 - Apr 26) - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns) - Specify depth of field limiting slit widths for Arc 7 SLM - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising) - Planning for overall diagnostic system integration, including periodic calibration requirements Next two weeks (Apr 29 - May 10) - Model SyncLightMonitor matching process for arcs - Review field map updates for Moller quads requested by Benesch - Continue on 4) above (diagnostic system integration)
LERF - Steve Benson
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -