Difference between revisions of "2019-05-15-LeadershipReports"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | May 15, 2019 Report - May | + | May 15, 2019 Report - May 6 - May 30 |
− | |||
'''Director - Todd Satogata''' <br> | '''Director - Todd Satogata''' <br> | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
- | - | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- | - | ||
Alex Bogacz | Alex Bogacz | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
− | |||
− | |||
- | - | ||
+ | Next two weeks (May 20 - May 31) | ||
+ | - | ||
Rui Li | Rui Li | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
− | - | + | - Coordinate JLEIC impedance meeting: good progress in the IR chamber design (Mark wiseman) |
− | Next two weeks (May | + | and EM modeling (Frank Marhauser), and heated discussion about Gunn Tae Park's presentation |
− | - | + | about harmonic kicker impedance analysis. Also interesting discussion with Dan Wang of LBL |
+ | who participated the meeting via bluejeans | ||
+ | - Literature studies on impedance theories | ||
+ | - Family vacation for most of the 2nd week | ||
+ | Next two weeks (May 20 - May 31) | ||
+ | - Impedance studies | ||
+ | - Bunch spectrum for JLEIC bunch pattern and its impact on coupled bunch instabilities | ||
+ | - CSR effect studies (Georg Haffstaetter visit to discuss CSR effects in CBETA) | ||
+ | |||
Ed Nissen | Ed Nissen | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
- | - | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- | - | ||
Line 34: | Line 41: | ||
Chris Tennant | Chris Tennant | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
- | - | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- | - | ||
Line 46: | Line 53: | ||
Fanglei Lin | Fanglei Lin | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
- | - | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- | - | ||
Line 55: | Line 62: | ||
Vasiliy Morozov | Vasiliy Morozov | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
− | |||
− | |||
- | - | ||
+ | Next two weeks (May 20 - May 31) | ||
+ | - | ||
<br> | <br> | ||
Amy Sy | Amy Sy | ||
− | + | Previous two weeks (May 6 - May 17) | |
− | |||
− | |||
- | - | ||
+ | Next two weeks (May 20 - May 31) | ||
+ | - | ||
Line 72: | Line 79: | ||
Yuhong Zhang | Yuhong Zhang | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
− | |||
− | |||
- | - | ||
+ | Next two weeks (May 20 - May 31) | ||
+ | - | ||
Line 94: | Line 101: | ||
He Zhang | He Zhang | ||
− | + | Previous two weeks (May 6 - May 17) | |
- | - | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- | - | ||
Line 103: | Line 110: | ||
River Zhang | River Zhang | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
- Completed IPAC2019-poster and submitted paper. | - Completed IPAC2019-poster and submitted paper. | ||
- "CASA BeamBeam" | - "CASA BeamBeam" | ||
Line 114: | Line 121: | ||
- 3 Particles Spin Tracking | - 3 Particles Spin Tracking | ||
- For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”. | - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”. | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- pyFMM will be under investigation. | - pyFMM will be under investigation. | ||
- Continue spin tracking study. | - Continue spin tracking study. | ||
Line 122: | Line 129: | ||
'''Diagnostic Development - Kevin Jordan''' <br> | '''Diagnostic Development - Kevin Jordan''' <br> | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
− | |||
− | |||
- | - | ||
+ | Next two weeks (May 20 - May 31) | ||
+ | - | ||
Joe Gubeli | Joe Gubeli | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
+ | - | ||
+ | Next two weeks (May 20 - May 31) | ||
- | - | ||
− | |||
− | |||
Michael Tiefenback | Michael Tiefenback | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
+ | - | ||
+ | Next two weeks (May 20 - May 31) | ||
- | - | ||
− | |||
− | |||
Line 148: | Line 155: | ||
'''LERF - Steve Benson''' <br> | '''LERF - Steve Benson''' <br> | ||
− | Previous two weeks (May | + | Previous two weeks (May 6 - May 17) |
- | - | ||
− | Next two weeks (May | + | Next two weeks (May 20 - May 31) |
- | - |
Revision as of 10:26, 30 May 2019
May 15, 2019 Report - May 6 - May 30
Director - Todd Satogata
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Alex Bogacz
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Rui Li
Previous two weeks (May 6 - May 17) - Coordinate JLEIC impedance meeting: good progress in the IR chamber design (Mark wiseman) and EM modeling (Frank Marhauser), and heated discussion about Gunn Tae Park's presentation about harmonic kicker impedance analysis. Also interesting discussion with Dan Wang of LBL who participated the meeting via bluejeans - Literature studies on impedance theories - Family vacation for most of the 2nd week Next two weeks (May 20 - May 31) - Impedance studies - Bunch spectrum for JLEIC bunch pattern and its impact on coupled bunch instabilities - CSR effect studies (Georg Haffstaetter visit to discuss CSR effects in CBETA)
Ed Nissen
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Chris Tennant
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Accelerator R & D - Yuhong Zhang
Fanglei Lin
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Vasiliy Morozov
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Amy Sy
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Yuhong Zhang
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Computational Physics - Yves Roblin
Yves Roblin
CEBAF - JLEIC: - OTHER -
He Zhang
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
River Zhang
Previous two weeks (May 6 - May 17) - Completed IPAC2019-poster and submitted paper. - "CASA BeamBeam" - Revised, optimized and accelerated “Crab Kick” of “CASA BeamBeam” codes by using the High Performance Python Compiler, Numba. Based on JIT(Just in Time), Numba translates part of our “Crab Kick” Python functions to optimized machine code at runtime using the industry-standard LLVM compiler library. - Performance of “Crab kicking” - Simulations have been down for the JLEIC parameters again. For example, for the case CM Energy 21.9GeV, comparing with previous job, the “Numba” based “Crab Kick” codes can save 1/5 time than the old code for 4000 turn in a collider ring. - 3 Particles Spin Tracking - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”. Next two weeks (May 20 - May 31) - pyFMM will be under investigation. - Continue spin tracking study.
Diagnostic Development - Kevin Jordan
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Joe Gubeli
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Michael Tiefenback
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
LERF - Steve Benson
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -