Difference between revisions of "2015-08-21 Accelerator Physics Report"
Jump to navigation
Jump to search
Line 27: | Line 27: | ||
</li> | </li> | ||
</ul> | </ul> | ||
+ | |||
Alex Bogacz:<br> | Alex Bogacz:<br> | ||
Line 39: | Line 40: | ||
<li>ER@CEBAF: continue optics matching work with Yves | <li>ER@CEBAF: continue optics matching work with Yves | ||
</ul> | </ul> | ||
+ | |||
Dave Douglas:<br> | Dave Douglas:<br> | ||
Line 55: | Line 57: | ||
<li>Reviews (PRST:AB paper, USPAS proposal) | <li>Reviews (PRST:AB paper, USPAS proposal) | ||
</ul> | </ul> | ||
+ | |||
Chris Tennant:<br> | Chris Tennant:<br> | ||
Line 70: | Line 73: | ||
<li>MEIC: Continue Linac/arc acceptance with Douglas CSR-suppression arc | <li>MEIC: Continue Linac/arc acceptance with Douglas CSR-suppression arc | ||
</ul> | </ul> | ||
+ | |||
Alex Castilla:<br> | Alex Castilla:<br> | ||
Line 82: | Line 86: | ||
<li>Continue preparations for MEPAS teaching in Nov | <li>Continue preparations for MEPAS teaching in Nov | ||
</ul> | </ul> | ||
+ | |||
Randy Gamage:<br> | Randy Gamage:<br> |
Latest revision as of 10:26, 17 August 2015
CASA Accelerator Physics
Report: 07/27/15 - 08/21/15
Submitted by Todd Satogata
Todd Satogata:
Previous two weeks (Jul 27-Aug 7)
- FMLA: 07/31-08/04
- ODU: NNSA funding proposal development
- ER@CEBAF: biweekly meeting, BBU model development with BNL
- ODU/MEIC: Develop Randy research plan, start bunch-splitting simulations
- CEBAF: StayTreat debrief, ORFP revision, Hall D FFB meet
- ADMIN: Eric Thompson, COOL'15 org
- MEIC: More work on gear-changing implications
Next two weeks (Aug 10-21)
- CEBAF: ORFP editing, StayTreat summary prep, Hall D FFB modeling, BTeam
- ADMIN: IPAC'15 proceedings finalization, COOL'15 program work
- ER@CEBAF: biweekly meeting notes, BBU model development with BNL
- ODU/MEIC: Continue bunch-splitting simulations with Randy
- ODU: NNSA funding proposal development
- Vacation: 8/10(pm), 8/12, 8/14(am)
Alex Bogacz:
Previous two weeks (Jul 27-Aug 7)
- Preparation for NuFact15 (Aug 10-15)
- ER@CEBAF: optics work with Yves
Next two weeks (Aug 10-21)
- NuFact15 (Aug 10-15)
- ER@CEBAF: continue optics matching work with Yves
Dave Douglas:
Previous two weeks (Jul 27-Aug 7)
- Project E: Eindhoven workshop (through Jul 28)
- Project E: Develop collimation experiment in IR upgrade
- MEIC: Assemble CSR-suppression arc for tracking with Chris
Next two weeks (Aug 10-21)
- Project E: Detail collimation experiment in IR upgrade
- MEIC: Continue CSR-suppression arc for tracking with Chris
- Darklight: Develop match for C target/no solenoid, gas target+solenoid
- Medical isotope IR upgrade backleg lattice assembly
- Reviews (PRST:AB paper, USPAS proposal)
Chris Tennant:
Previous two weeks (Jul 27-Aug 7)
- Project E: Followup from workshop outcome
- ER@CEBAF: Followup on measurement, BBU planning
- LERF: FEL lattice to CED with Michele Joyce
- MEIC: Linac/arc acceptance with Douglas CSR-suppression arc
Next two weeks (Aug 10-21)
- ER@CEBAF: Continue measurement, BBU planning
- LERF: Continue FEL lattice to CED with Michele Joyce
- MEIC: Continue Linac/arc acceptance with Douglas CSR-suppression arc
Alex Castilla:
Previous two weeks (Jul 27-Aug 7)
- Dissertation writing
- Start preparations for MEPAS teaching in Nov
Next two weeks (Aug 10-21)
- Dissertation writing
- Continue preparations for MEPAS teaching in Nov
Randy Gamage:
Previous two weeks (Jul 27-Aug 7)
- MEIC: Longitudinal model development
Next two weeks (Aug 10-21)
- MEIC: Longitudinal model development