Difference between revisions of "2020-4-2-LeadershipReports"

From Administrative
Jump to navigation Jump to search
(Created page with "'''March 19 2020 Report - Mar 2 - Mar 27''' '''Director - Todd Satogata''' <br> '''Todd Satogata''' '''Previous two weeks (Mar 2 - Mar 13)''' - ADMIN 12 GeV PRAB wr...")
 
Line 1: Line 1:
'''March 19 2020 Report - Mar 2 - Mar 27'''
+
'''April 2 2020 Report - Mar 16 - Apr 10'''
 
'''Director - Todd Satogata''' <br>
 
'''Director - Todd Satogata''' <br>
  
 
'''Todd Satogata'''
 
'''Todd Satogata'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
       - ADMIN 12 GeV PRAB writing/meets, group move planning, PRAB review
+
       -  
      - MGMT AI for NP workshop, prepare for possible Coronavirus MEDCON5
+
   '''Next two weeks (Mar 30 - Apr 10)'''
      - EIC Meetings, BNL work/resource planning, parameter review
+
       -  
      - OPS UITF tour, start CASA involvement; positron beams meet
 
      - OPS CEBAF high current, diagnostics support planning
 
      - OPS KLF discussions, proposal contribution
 
      - ODU/SBIR Prep Sunil Pokharel for Xelera SBIR, grad student review
 
      - IPAC Light peer review assistance (Peter McIntosh)
 
   '''Next two weeks (Mar 16 - Mar 27)'''
 
       - MGMT MEDCON5 information gathering and group communication
 
      - MGMT Strategy meetings (Coronavirus, EIC, ops support/BTeam)
 
      - ADMIN Weekly AI meeting, 12 GeV paper contribution writing
 
      - EIC Weekly JLab strategy meeting, labor resource/FOA planning
 
      - EIC Temple Meeting telecon (Mar 19), strategy telecons (Mar 18)
 
      - EIC BNL Impedance, Magnetized beam SBIR, RCS task force telecons
 
      - OPS BTeam/daily operations telecons, Hall D TAC procedure review
 
      - OPS High intensity run HOM/BBU calculation review/planning
 
      - OPS KLF collaboration proposal review/writing
 
      - VACATION 1/2 day Fri 03/20, 1/2 day Mon 03/23
 
  
  
Line 30: Line 14:
 
'''Alex Bogacz'''
 
'''Alex Bogacz'''
 
    
 
    
   '''Previous two weeks (Mar 2 - Mar 13)'''  
+
   '''Previous two weeks (Mar 16 - Mar 27)'''  
       - Machine support
+
       -  
      - Conducting Graduate Student Progress Review
+
   '''Next two weeks (Mar 30 - Apr 10)'''
      - 'First cut' chicane layout with Cornell’s magnets
+
       -  
      - PRAB paper review
 
      - TRC invention disclosure review.
 
   '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Second iteration on chicane layout, per input from Chase
 
      - SBIR proposal review
 
      - Paper on neutrino decay ring design
 
      - Exploring Jupyter Notebook for USPAS course on Practical Lattice Design.
 
  
  
Line 48: Line 25:
 
'''Rui Li'''
 
'''Rui Li'''
 
    
 
    
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
       - On Leave
+
       -  
   '''Next two weeks (Mar 16 - Mar 27)'''  
+
   '''Next two weeks (Mar 30 - Apr 10)'''  
       - Work at home
+
       -  
  
  
Line 59: Line 36:
 
'''Edy Nissen'''
 
'''Edy Nissen'''
 
    
 
    
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - I started out working on my ECA application, but decided that I should not pursue that this year.
+
       -  
      - I've mostly been working on DODGE since then
+
     '''Next two weeks (Mar 30 - Apr 10)'''
     '''Next two weeks (Mar 16 - Mar 27)'''
+
       -  
       - I will be working both on DODGE, and I have been reading through the eRHIC pCDR.
 
  
  
Line 70: Line 46:
 
'''Chris Tennant'''
 
'''Chris Tennant'''
 
    
 
    
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Meetings/prep for AI FOA
+
       -  
      - Meetings/writing/prep for Accelerator Stewardship FOA with CN
+
     '''Next two weeks (Mar 30 - Apr 10)'''
     '''Next two weeks (Mar 16 - Mar 27)'''
+
       -  
       - Meetings/writing/prep Accelerator Stewardship FOA (due early April)
 
      - Investigating SRF fault data to see if there is sufficient information for AI to make predictions of faults
 
  
  
Line 86: Line 60:
 
'''Yuhong Zhang'''
 
'''Yuhong Zhang'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
   '''Next two weeks (Mar 16 - Mar 27)'''
+
   '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 95: Line 69:
 
'''Max Bruker'''
 
'''Max Bruker'''
  
   '''Previous (Mar 2 - Mar 13)'''
+
   '''Previous (Mar 16 - Mar 27)'''
       - Reasonable progress on IMP data analysis; discussions about the transverse stuff are still going on while IMP is  
+
       - Started writing the PRAB article about the IMP experiment. Some questions are still unresolved, but the quality of the results is
         understaffed due to Covid
+
         starting to look convincing nonetheless.
       - Gave presentation on data analysis at CASA meeting
+
       - Remotely attended the first UITF training session
   '''Next (Mar 16 - Mar 27)'''
+
   '''Next (Mar 30 - Apr 10)'''
       - Start telecommuting on Mar 17
+
       - Continue and hopefully finish my part of the article. There is not much left to do as far as the longitudinal and transverse
       - Write PRAB article
+
        profile data are concerned, but I'd like to understand what happens to the synchrotron frequency. Also, I'm getting the impression
 +
        that nobody quite knows what our objective/conclusion is supposed to be. I hope we'll figure it out along the way.
 +
       - Attend more UITF training and hopefully the communication seminar that keeps being postponed.
  
  
Line 109: Line 85:
 
'''Fanglei Lin'''
 
'''Fanglei Lin'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
         - Took one week off due to an illness
+
         -  
        - Work on the storage ring cooler project
+
   '''Next two weeks (Mar 30 - Apr 10)'''
        - Worked on teaching material for the Spin@USPAS class
+
         -  
        - Studying eRHIC design and participated in the discussion of EIC task forces
 
        - Miscellaneous: attended the Storage Ring Cooler meeting, attended meetings for the Spin@USPAS class, attended the EIC
 
          accelerator design team meeting
 
   '''Next two weeks (Mar 16 - Mar 27)'''
 
         - Work on the storage ring cooler project
 
        - Study eRHIC design and prepare for the contribution to the design of EIC
 
  
  
Line 124: Line 94:
 
'''Bhawin Dhital'''
 
'''Bhawin Dhital'''
 
    
 
    
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Hall C walk-through training and the First Target Operator (TO) shift on March 03 and March 04.
+
       -  
      - Participated in JLab Hack-Athon and AI workshop. March 03 - March 06. Please see attached images.
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - Understanding damping time and IBS time in a two-energy storage ring.
+
       -  
      - On March 08, 2020. I got sick and went to the hospital. I got the flu. Unable to work for a week.
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Calculating damping time and IBS time.
 
      - Go through some references and Slava’s paper on ‘ Electron Cooling for RHIC’.
 
      - Figure out the optimized parameters in a Two-Energy Storage Ring design.
 
      - Canceling all reservation which was made for AccApp20, Now AppAcc20 is officially canceled.
 
      - Regular group meeting on Two-Energy Storage Ring via BlueJeans (First was on March 20, 2020 at 2:30 PM)
 
  
 
<br>
 
<br>
 
'''Vasiliy Morozov'''
 
'''Vasiliy Morozov'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Work on detector solenoid compensation: teleconference with collaborators and study of closed orbit correction schemes
+
       -  
      - Preparation of a PRAB paper on the transparent spin response function
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - Participation in planning of collaboration with BNL
+
       -  
      - Spin tracking simulations
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Participation in the YR workshop
 
      - Work on detector solenoid compensation
 
      - Preparation of a PRAB paper on the transparent spin response function
 
      - Spin tracking simulations
 
      - Two-energy storage ring cooler
 
      - Crabbing calculations
 
      - Beam-beam calculations
 
  
  
Line 159: Line 113:
 
'''Amy Sy'''
 
'''Amy Sy'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Participation in the AI for Nuclear Physics Workshop.
+
       -
      - Literature search on electron and proton EDM experiment concepts.
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - H- intrabeam stripping estimate in JLEIC ion linac using PyORBIT. First pass at calculating the fractional beam loss as a
+
       -  
        function of linac length, as well as the estimated power loss along the linac.
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Continued work on the H- intrabeam stripping estimates. Conversion of TRACK output for comparison with PyORBIT estimates.
 
        Writing up the results for a future conference paper.
 
      - Continued literature search on proton and electron EDM experiments.
 
      - Literature search to better understand the polarized proton and 3He linacs at RHIC/BNL EIC.
 
  
  
Line 179: Line 127:
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Yves Roblin'''
 
'''Yves Roblin'''
     Previous two weeks (Mar 2 - Mar 13)
+
     Previous two weeks (Mar 16 - Mar 27)
       - CASA Beam-Beam package
+
       -  
      - Using the conjugate gradient method and writing in Python, we added the two-dimension Poisson Equation solver to CASA
+
     Next two weeks (Mar 30 - Apr 10)
        Beam-Beam package.
+
       -  
     Next two weeks (Mar 16 - Mar 27)
 
       - Continue working on revising CASA Beam-Beam package.
 
  
  
Line 191: Line 137:
 
'''Randi Gamage'''
 
'''Randi Gamage'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
 
  
  
Line 201: Line 146:
 
'''River Huang'''
 
'''River Huang'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       - CASA Beam-Beam package -  
 
       - CASA Beam-Beam package -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 210: Line 155:
 
'''Isurumali Neththikumara'''
 
'''Isurumali Neththikumara'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 221: Line 166:
 
'''Dennis Turner'''
 
'''Dennis Turner'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       - '''AIPINJ'''
 
       - '''AIPINJ'''
         - New layout; close to finalized.  Updated elegant decks.
+
         -  
        - Rematched new layout for various Wien configurations and provided QW and solenoid setpoints.
 
        - Simulated harp emittance measurements to verify it will work with the latest layout.
 
        - Prepared slides regarding optics to present to AIPINJ meeting.
 
 
       - '''HLA'''
 
       - '''HLA'''
         - Tweaks to qsUtility.
+
         -  
        - Reviewed rayTrace code and began code cleanup and streamlining.
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - Attended AI for NP conference.
 
      - Attended BTeam, CASA, AIPINJ, AI Lunch, and 12GeV PRAB meetings.
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
      - Optics On-Call
 
 
       - '''AIPINJ'''
 
       - '''AIPINJ'''
         - Build a deck for the run after the summer shutdown.  We will be running 130keV with the new beamline up to the chopper, and
+
         -
          existing beamline downstream.
 
        - Present optics slides to AIPINJ meeting.
 
 
       - '''HLA'''
 
       - '''HLA'''
         - Continue with rayTrace.
+
         -  
 
       - '''AI'''
 
       - '''AI'''
         - Provide detailed outline of RF cavity instability detection idea for upcoming funding proposal.
+
         -  
        - Experiment with using Keras/TensorFlow on archived RF cavity data to learn hands-on.
 
      - Attend BTeam, 12GeV PRAB, AI Lunch, Accelerator AI, AIPINJ, CASA, 0800 meetings.
 
      - Remain socially distant.
 
  
  
Line 251: Line 184:
 
'''He Zhang'''
 
'''He Zhang'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''     
+
     '''Previous two weeks (Mar 16 - Mar 27)'''     
       - Finished the UI of the new JSPEC code. Finished testing features in most scenarios. The new codes have been released in a new
+
       - New model added to JSPEC, which allows to use multiple electron bunches to cool one ion bunch. The electron bunches are assumed
         github repository. A few small new features added. Examples with results are added to the erpository. Documents has been updated.  
+
         identical but placed at different positions. Kick due to the raising/falloing edge of a cylindrical electron bunch is added into
     '''Next two weeks (Mar 16 - Mar 27)'''  
+
        the turn-by-turn model.  
       - Add cooling mode of using multiple electron bunches to cool one long ion bunch.
+
      - Did some calculation/simulations on eRHIC low energy cooling.  
      - Add mode of the edging effect of the electron bunch.  
+
     '''Next two weeks (Mar 30 - Apr 10)'''  
       - Continue document the code.  
+
       - Non-magnetic friction force formula to JSPEC. Heating effect to JSPEC.  
       - Perform simulation on IMP experiment
+
       - Keep documenting JSPEC.  
 +
       - Perform simulation on IMP experiment if data is available.
 +
 
  
 
   
 
   
 
    
 
    
 
 
  
 
----
 
----
Line 270: Line 203:
 
'''Kevin Jordan'''
 
'''Kevin Jordan'''
  
   '''Previous two weeks (Mar 2 - Mar 13)'''
+
   '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
   '''Next two weeks (Mar 16 - Mar 27)'''
+
   '''Next two weeks (Mar 30 - Apr 10)'''
 
       -   
 
       -   
  
Line 280: Line 213:
 
'''Joe Gubeli'''
 
'''Joe Gubeli'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - '''Isotope Experiment –''' Spent a large portion of the last two weeks on this project. Started with support of the 1kW run which
+
       - '''Isotope Experiment –'''  
        had to be terminated early to investigate the solid hBN target that developed a crack. We had discussions on the cause of the
+
       - '''Halo monitor –'''
        crack as well as a path forward. Going forward we decided to investigate the use of graphite over hBN due to its better thermal
+
       - '''ARDDOT –'''  
        and electrical conductivity. I performed some analytical energy loss and absorbed power calculations on the window, radiator and
+
       - '''HPWS -'''  
        target. Three targets were analyzed, solid hBN, solid graphite and gallium filled graphite. Using these numbers I ran a number of
+
     '''Next two weeks (Mar 30 - Apr 10)'''
        simulations of these three cases plus a few more using different material properties. I made a presentation of the results.
+
       - '''HPWS –'''  
       - '''Halo monitor –''' – The missing $27k received by JLab. We are working on creating an account code for these funds
+
       - '''ARDDOT –'''  
       - '''ARDDOT –''' Started investigating a new design for SLM1A09 to place the camera over the dipole. The idea is to use the dipole
+
       - '''Isotope Experiment -'''  
        steel as additional radiation protection.
 
       - '''HPWS -''' I created an analytical as well as a sequential Zemax simulation of the optics use to image the wire as well as
 
        collect photons into a photodiode.
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - '''HPWS –''' Design a test setup to pulse a diode laser that simulates the electron beam. This will allow us
 
        to test the scanner’s acquisition in pulsed mode.
 
       - '''ARDDOT –''' Build first a sequential Zemax model of the new SLM1A09 optics then move to a non-sequential Zemax model. After
 
        completion of the Zemax models create a solid model and then prepare a presentation for review.
 
       - '''Isotope Experiment -''' Support 1kW run.
 
  
  
Line 304: Line 228:
 
'''Michael Tiefenback'''
 
'''Michael Tiefenback'''
  
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
 
       -  
 
       -  
     '''Next two weeks (Mar 16 - Mar 27)'''
+
     '''Next two weeks (Mar 30 - Apr 10)'''
 
       -  
 
       -  
  
Line 315: Line 239:
 
'''LERF - Steve Benson'''  
 
'''LERF - Steve Benson'''  
 
   
 
   
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - Assisted in isotope commissioning run the week of March 9. Will have to redo due to target damage.
+
       -  
      - Hosted seminar by Ying Wu.
+
     '''Next two weeks (Mar 30 - Apr 10)'''
      - Sent Straight merger coils to ANL
+
       -  
      - Certified User Lab 4 for laser operation
 
      - Signed off on TOSP for laser testing in User Lab 4
 
      - Worked with Operations liaison to revise turn-on procedures for the LERF
 
      - Continued to review the new LERF Operations Directive
 
      - Completed report for CBETA close-out revie
 
     '''Next two weeks (Mar 16 - Mar 27)'''
 
       - Set up simulations of EIC cooling
 
      - Review Optics Communications paper
 
      - Finalize the new LERF Operations Directive
 
      - Organize studies for low energy cooling on eRHIC
 
  
 
   
 
   
Line 336: Line 250:
 
'''Andrew Hutton'''
 
'''Andrew Hutton'''
 
   
 
   
     '''Previous two weeks (Mar 2 - Mar 13)'''
+
     '''Previous two weeks (Mar 16 - Mar 27)'''
       - I visited Jamal at VCU to find out more information on the hot cell we need for Isotope separation.  Jamal has been
+
       -   
        shut down by their Radiation Officer until the hot-cell has been relocated. The future location has been secured. However,
+
     '''Next two weeks (Mar 30 - Apr 10)
        with the coronavirus, I do not expect any rapid resolution of the problem. 
+
       -
      - We carried out our first irradiation in the hutch, unfortunately fracturing a solid block of boron nitride used for setting
 
        up CW beam (I have described this in detail in other correspondence, I will not belabor it here).  The Isotope team is
 
        preparing for a supplemental ERR as we are considering changing the crucible to graphite.  A suitable graphite grade has
 
        been identified and a dozen blocks ordered (Kevin). We all received measurements of the residual metallic impurities, which
 
        are being looked at by RadCon for completeness (Keith).  The NMT students are on Spring Break and have ramped up thermal
 
        simulations, which are being compared to our simulations (Joe).
 
      - I participated in a VNECA meeting, which was unusually interesting as we are trying to address the major changes in
 
        energy policy enacted by the Virginia legislature (again, I reported on this in a separate report). 
 
      - I completed my HPI training.  Overall, I was not impressed, the trainer spent too much time pointing out mistakes made at
 
        Jefferson lab in the past (totally against the principles of HPI). 
 
      - I attended a meeting of the EIC RF group discussing HOM losses in the electron ring SRF cavities, but did not contribute
 
        much. Bob and Frank know way more than I ever will.  I have also interacted with Vasiliy and Yuhong on increasing the
 
        luminosity in the medium energy region. 
 
      - I provided advice to Alex and Deborah about the Awards and Prizes Committee which I initiated, was not maintained, and which
 
        Alex is now willing to take on.  I stressed that this initiative will only work if Stuart mandates the team. 
 
      - My week ended with a request to self-isolate until further notice.  
 
     '''Next two weeks (Mar 16 - Mar 27)
 
       - I am now working from home, for which I am well equipped. 
 
      - I will be following up on the isotope preparations.
 
      - I will work through the luminosity parameters in the eRHIC pCDR and have already found some errors.
 

Revision as of 09:27, 31 March 2020

April 2 2020 Report - Mar 16 - Apr 10 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10)
     - 



Alex Bogacz

  Previous two weeks (Mar 16 - Mar 27) 
     - 
  Next two weeks (Mar 30 - Apr 10)
     - 



Rui Li

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10) 
     - 



Edy Nissen

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



Chris Tennant

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 




Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10)
     - 


Max Bruker

  Previous (Mar 16 - Mar 27)
     - Started writing the PRAB article about the IMP experiment. Some questions are still unresolved, but the quality of the results is
       starting to look convincing nonetheless.
     -	Remotely attended the first UITF training session
  Next (Mar 30 - Apr 10)
     - Continue and hopefully finish my part of the article. There is not much left to do as far as the longitudinal and transverse 
       profile data are concerned, but I'd like to understand what happens to the synchrotron frequency. Also, I'm getting the impression
       that nobody quite knows what our objective/conclusion is supposed to be. I hope we'll figure it out along the way.
     -	Attend more UITF training and hopefully the communication seminar that keeps being postponed.



Fanglei Lin

  Previous two weeks (Mar 16 - Mar 27)
       - 
  Next two weeks (Mar 30 - Apr 10)
       - 


Bhawin Dhital

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 


Vasiliy Morozov

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 




Amy Sy

   Previous two weeks (Mar 16 - Mar 27)
     -  
   Next two weeks (Mar 30 - Apr 10)
     - 






Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



Randi Gamage

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 


River Huang

   Previous two weeks (Mar 16 - Mar 27)
     - CASA Beam-Beam package - 
   Next two weeks (Mar 30 - Apr 10)
     - 


Isurumali Neththikumara

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



Dennis Turner

   Previous two weeks (Mar 16 - Mar 27)
     - AIPINJ
        - 
     - HLA
        - 
   Next two weeks (Mar 30 - Apr 10)
     - AIPINJ
        -
     - HLA
        - 
     - AI
        - 



He Zhang

   Previous two weeks (Mar 16 - Mar 27)     
     - New model added to JSPEC, which allows to use multiple electron bunches to cool one ion bunch. The electron bunches are assumed
       identical but placed at different positions. Kick due to the raising/falloing edge of a cylindrical electron bunch is added into
       the turn-by-turn model. 
     - Did some calculation/simulations on eRHIC low energy cooling. 
   Next two weeks (Mar 30 - Apr 10) 
     - Non-magnetic friction force formula to JSPEC. Heating effect to JSPEC. 
     - Keep documenting JSPEC. 
     - Perform simulation on IMP experiment if data is available. 




Diagnostic Development - Kevin Jordan

Kevin Jordan

  Previous two weeks (Mar 16 - Mar 27)
     - 
  Next two weeks (Mar 30 - Apr 10)
     -  



Joe Gubeli

   Previous two weeks (Mar 16 - Mar 27)
     - Isotope Experiment – 
     - Halo monitor –
     - ARDDOT – 
     - HPWS - 
   Next two weeks (Mar 30 - Apr 10)
     - HPWS – 
     - ARDDOT – 
     - Isotope Experiment - 



Michael Tiefenback

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Mar 16 - Mar 27)
     - 
   Next two weeks (Mar 30 - Apr 10)
     - 



Andrew Hutton

   Previous two weeks (Mar 16 - Mar 27)
     -  
   Next two weeks (Mar 30 - Apr 10)
     -