Difference between revisions of "2015-06-12 Accelerator Physics Report"
Jump to navigation
Jump to search
DD: vacation 5/29-6/3
TS: partial FMLA 6/5-8
CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)
Line 14: | Line 14: | ||
<li>UITF reengagement (AB) | <li>UITF reengagement (AB) | ||
</ul> | </ul> | ||
− | |||
− | |||
Line 25: | Line 23: | ||
<li>Aperture studies for Project E lattice (CT) | <li>Aperture studies for Project E lattice (CT) | ||
</ul> | </ul> | ||
− | + | ||
− | |||
MEIC<br> | MEIC<br> | ||
Line 37: | Line 34: | ||
</ul> | </ul> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | LDRD<br> | ||
+ | <ul> | ||
+ | <li>No progress (microbunching info from CT in hands of Rui/Yves) | ||
+ | <li>Community service/training/other | ||
+ | <li>Prepare LHeC talk for ERL workshop (AB) | ||
+ | <li>Summer lecture series: intro to accelerators, 6/9 (TS) | ||
+ | <li>IPAC15 proceedings finalization (TS) | ||
+ | <li>JACoW annual team meeting planning (TS) | ||
+ | <li>Thesis writing (AC) | ||
+ | </ul> | ||
− | + | Travel/vacation<br> | |
− | + | <li>DD: vacation 5/29-6/3 | |
− | + | <li>TS: partial FMLA 6/5-8 | |
− | + | <li>CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook) | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | Travel/vacation | ||
− | DD | ||
− | |||
− | TS: | ||
− | CT: |
Revision as of 15:06, 20 July 2015
CASA Accelerator Physics
Bi-Weeklly Report - due 06-12-2015
Submitted by: Todd Satogata
Here is the biweekly report from Physics. I use initials for group members as usual: AB=Alex Bogacz, DD=Dave Douglas, CT=Chris Tennant, AC=Alex Castilla, RG=Randy Gamage, TS=Todd Satogata. A lot of group time is involved in the ERL and IEB workshops in this period. I'll chat with Yves separately about whether more work is needed from Chris on the CSR experiment LDRD over the next month.
Previous two weeks (May 29-Jun 12) CEBAF / Operations
- LOC meetings/planning for mid-July StayTreat (TS)
- Administrate RSR, BTeam (TS)
- Finished/circulated emittance contributed talk paper (TS)
- UITF reengagement (AB)
Project E/Darklight
- Darklight collaboration meeting 6/4-5 (DD,CT)
- Lattice hypersensitivity to alpha evaluation (DD, CT)
- Calculated flat beam/magnetized beam transforms (DD)
- Aperture studies for Project E lattice (CT)
MEIC
- Calculations of coasting beam stability needs (TS)
- Develop bunch splitting simulations, IPAC15 followup (RG, TS)
- Nonlinear crabbing simulation planning (AC, TS)
- Synergia compilation for Booster injection sims (TS, AB)
- Lattice s2e setup (CT)
LDRD
- No progress (microbunching info from CT in hands of Rui/Yves)
- Community service/training/other
- Prepare LHeC talk for ERL workshop (AB)
- Summer lecture series: intro to accelerators, 6/9 (TS)
- IPAC15 proceedings finalization (TS)
- JACoW annual team meeting planning (TS)
- Thesis writing (AC)
Travel/vacation