Difference between revisions of "2015-06-26 Accelerator Physics Report"
Jump to navigation
Jump to search
(Created page with "CASA Accelerator Physics<br> Bi-Weekly Report - 06-12-2015 to 06-26-2015 Submitted by: Todd Satogata CEBAF / Operations<br> <ul> <li>Optics analysis, preparation for StayTrea...") |
|||
Line 28: | Line 28: | ||
<li>Thesis writing (AC) ODU reengagement with NNSA proposal team (TS) | <li>Thesis writing (AC) ODU reengagement with NNSA proposal team (TS) | ||
</ul> | </ul> | ||
+ | |||
Travel/vacation | Travel/vacation |
Revision as of 15:12, 20 July 2015
CASA Accelerator Physics
Bi-Weekly Report - 06-12-2015 to 06-26-2015
Submitted by: Todd Satogata
CEBAF / Operations
- Optics analysis, preparation for StayTreat (TS)
- Evaluate Hall D optics feedback status (TS)
- Evaluate quad centering with data from test archiver (TS)
- Administrate RSR, BTeam (TS)
- UITF reengagement (AB)
- Project E/Darklight
- Continued halo, aperture analysis (DD, CT)
- Document flat beam/magnetized beam transforms (DD)
- Use Cheng-Ying's code for microbunching gain calculation for Project E (CT)
MEIC
- Develop bunch splitting simulations, IPAC15 followup (TS, RG)
- Continue nonlinear crabbing simulation planning, implementation (AC, TS)
- Cooler re-engagement, lattice resurrection (DD, CT)
- Lattice s2e setup, including magnetization (CT with input from DD)
- Begin transverse parameter scans for cooler linac (CT)
- Community service/training/other
- Work on overdue NIM/PR reviews (DD)
- Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)
Travel/vacation
- DD/CT: IEB Workshop 6/16-19 (Cornell)
- AB: vacation 6/16-7/29 (note long vacation)
- TS: vacation 6/16, 6/24-25
- CT: vacation 6/29-7/3 (beyond two-week horizon but worth mentioning)