Difference between revisions of "2017-09-18"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | |||
'''Accelerator Physics (T. Satogata)''' <br> | '''Accelerator Physics (T. Satogata)''' <br> | ||
Todd Satogata | Todd Satogata |
Revision as of 08:42, 18 September 2017
Accelerator Physics (T. Satogata)
Todd Satogata
Previous two weeks (Sep 4-Sep 15) - JLEIC: Continue assembling documents, pCDR meetings/planning - JLEIC: Continued esme simulations for coasting beam instability evaluation - ADMIN: AAC review preparations, talk (Sep 13-15) - IPAC18: invited program followup, registration SPMS work - OPS: BTeam (Sep 5), ATLis cleanup, documentation - ODU: USPAS January 2018 class coordination - ODU: JMU PHYS 417 class sharing, 4-VA inquiries Next two weeks (Sep 18-Sep 29) - ADMIN: Appraisal training (Sep 19) - OPS: BTeam (Sep 19), ATLis cleanup, troubleshooting guide, RSR accounting - IPAC18: invited program finalization, registration opening - JLEIC: Continue assembling documents, pCDR meetings/planning - JLEIC: Continued esme simulations for coasting beam instability evaluation - ODU: USPAS January 2018 class coordination (registration opening) - ADMIN: Attend Neil Symposium (Sep 27) - JMU seminar/trip (Sep 29)
Alex Bogacz
Previous two weeks (Sep 4-Sep 15) - IPAC18: APS scientific publication board org for light peer review - JLEIC/PERLE: Talks on synergy, planning at LHeC workshop and AAC - ADMIN: AAC review preparations, talk (Sep 13-15) - USPAS: Continue work on lectures for "Practical Accelerator Design" Next two weeks (Sep 18-Sep 29) - NUFACT: NUFACT'17, talk on "Muon Acceleration for Neutrino Factory and Beyond" - IPAC18: Continue APS scientific publication board org for light peer review - ADMIN: Invention disclosure review, TRC work
David Douglas
Previous two weeks (Sep 4-Sep 15) - VACATION: Aug 28-Sep 5 - ADMIN: Office cleaning, housekeeping, throwing away/recycling - ADMIN: Inordinate time spent with travel; working to shorten BNL time - ADMIN: Couple of reviews, including one PRAB review paper - PERLE: Fire drill on PERLE motivations (Sep 11-12) - JLEIC: Working through implications of Slava tilted solenoid concept Next two weeks (Sep 18-Sep 29) - JLEIC: More work beating on tilted solenoid, comparison to DIMAD - JLEIC: respond to any results Chris develops on the simple CCR arcs (and write up the simple arc) - ADMIN: Continue prep of talks for collaboration meeting and Bonn - PERS: sedation - which I'm going to need if travel planning doesn't settle down... - ADMIN: Particplate/planning for Neil symposium (Sep 27)
Rui Li
Previous two weeks (Sep 4-Sep 15) - ADMIN: take care matters in thesis award committee (may delay Cheng-Ying's nomination to next year to avoid conflict) - ADMIN: listen to talks at the AAC - JLEIC: discuss with Kirsten about her puzzle found in the ASTRA simulation of the magnetized beam transport---possible signal to noise problem - JLEIC: discuss with Salvador on his studies of crab cavity HOM coupled-bunch instability---the Rs and Q are orders of magnitude bigger than those found in accelerating cavities, suggested him to check similar data from existing crab cavities to see whether others have better HOM damping - ADMIN: get to know Eric's plan for his Fulbright application, in preparing recommendation letter Next two weeks (Sep 18-Sep 29) - JLEIC: start to work on slides summarizing my understanding of electron cloud in JLEIC (for presentation at R&D meeting) - JLEIC: start to work on slides summarizing JLEIC collective effects for the upcoming collaboration meeting in BNL - ADMIN: continue to work on matters for the thesis award committee (deadline is 9/16)
Ed Nissen
Previous two weeks (Sep 4-Sep 15) - ADMIN: Attend JPos - JLEIC: Further work on phase space painting, booster space charge acceleration simulations. Next two weeks (Sep 18-Sep 29) - JLEIC: Further work on phase space painting, booster space charge acceleration simulations.
Chris Tennant
Previous two weeks (Sep 4-Sep 15) - ADMIN: FFAG Workshop: Sep 6-7 (school), Sep 8-11 (workshop) - JLEIC: (re-)learning Bmad - VACATION: Sep 12-15 Next two weeks (Sep 18-Sep 29) - JLEIC: analyze CCR arc with Bmad - JLEIC: learn to use Bmad with CSR shielding (benchmark with other codes) - JLEIC: uBI gain for CCR arc (learn to use Cheng-Ying's code for magnetized beams) - PERLE: uBI gain for PERLE (learn to use Cheng-Ying's code including acceleration)
Randy Gamage
Previous two weeks (Sep 4-Sep 15) - Dissertation writing: Continue coasting beam chapter, tech note Next two weeks (Sep 18-Sep 29) - Dissertation writing: Hopefully coasting beam chapter, tech note
Accelerator R and D (Y. Zhang)
No report.
Computational Physics (R. Roblin)
No report.
Diagonistic Development (K. Jordan)
No report.
LERF (S. Benson)
September 5-15
- Prepared talks for JPos17, COOL17, and EIC collaboration meeting
- Attended JPos17 and organized LERF tour
- Continued to clean up the materials moved from the trailers to the LERF
- Discussed possible proposal for positron source at the LERF
- Worked on possible CRADA for high efficiency FEL development
- Debriefed with CI officers about the CRADA
September 18-29
- Attend COOL17 and present talk on bunched beam cooler
- Attend Neil Symposium and host the speakers
- Complete detailed statement of work for CRADA
- Writeup JPos publication