Difference between revisions of "2015-06-26 Accelerator Physics Report"

From Administrative
Jump to navigation Jump to search
Line 11: Line 11:
 
<li>Administrate RSR, BTeam (TS)
 
<li>Administrate RSR, BTeam (TS)
 
<li>UITF reengagement (AB)
 
<li>UITF reengagement (AB)
<li>Project E/Darklight
+
</ul>
 +
 
 +
Project E/Darklight
 
<li>Continued halo, aperture analysis (DD, CT)
 
<li>Continued halo, aperture analysis (DD, CT)
 
<li>Document flat beam/magnetized beam transforms (DD)
 
<li>Document flat beam/magnetized beam transforms (DD)
Line 25: Line 27:
 
<li>Lattice s2e setup, including magnetization (CT with input from DD)
 
<li>Lattice s2e setup, including magnetization (CT with input from DD)
 
<li>Begin transverse parameter scans for cooler linac (CT)
 
<li>Begin transverse parameter scans for cooler linac (CT)
<li>Community service/training/other
+
</ul>
 +
 
 +
 
 +
Community service/training/other
 
<li>Work on overdue NIM/PR reviews (DD)
 
<li>Work on overdue NIM/PR reviews (DD)
 
<li>Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)
 
<li>Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)

Revision as of 08:16, 21 July 2015

CASA Accelerator Physics
Bi-Weekly Report - 06-12-2015 to 06-26-2015
Submitted by: Todd Satogata


CEBAF / Operations

  • Optics analysis, preparation for StayTreat (TS)
  • Evaluate Hall D optics feedback status (TS)
  • Evaluate quad centering with data from test archiver (TS)
  • Administrate RSR, BTeam (TS)
  • UITF reengagement (AB)

Project E/Darklight

  • Continued halo, aperture analysis (DD, CT)
  • Document flat beam/magnetized beam transforms (DD)
  • Use Cheng-Ying's code for microbunching gain calculation for Project E (CT)


    MEIC

    • Develop bunch splitting simulations, IPAC15 followup (TS, RG)
    • Continue nonlinear crabbing simulation planning, implementation (AC, TS)
    • Cooler re-engagement, lattice resurrection (DD, CT)
    • Lattice s2e setup, including magnetization (CT with input from DD)
    • Begin transverse parameter scans for cooler linac (CT)


    Community service/training/other

  • Work on overdue NIM/PR reviews (DD)
  • Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)


    Travel/vacation

    • DD/CT: IEB Workshop 6/16-19 (Cornell)
    • AB: vacation 6/16-7/29 (note long vacation)
    • TS: vacation 6/16, 6/24-25
    • CT: vacation 6/29-7/3 (beyond two-week horizon but worth mentioning)