Difference between revisions of "2018-05-11"

From Administrative
Jump to navigation Jump to search
(Created page with "'''Director - M. Spata'''<br> ''No report.'' Acting Accelerator Division Head. ---- '''Accelerator Physics - T. Satogata'''<br> ---- '''Accelerator R & D - Y. Zhang'...")
 
Line 25: Line 25:
 
----
 
----
 
'''LERF - S. Benson''' <br>
 
'''LERF - S. Benson''' <br>
 +
April 30-May 11
 +
**Worked on preparing the LERF for the isotope visit
 +
**Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
 +
**Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
 +
**Started putting together AWP for FOA proposal
 +
**Hosted visit from Steve Peggs for CBETA discussions
 +
 +
May 14-25
 +
**Arrange for collaboration with HZDR for Elbe II facility.
 +
**Complete AWP for FOA proposal
 +
**Derive draft budget for isotope production
 +
**Revise LOD to match new ASE document.
 +
**Continue cleaning up the LERF for isotope visit.
 +
**Attend teleconference with DOE for isotope project.

Revision as of 08:37, 14 May 2018

Director - M. Spata
No report. Acting Accelerator Division Head.



Accelerator Physics - T. Satogata



Accelerator R & D - Y. Zhang



Computational Physicss - Y. Roblin



Diagnostic Development - K. Jordan



LERF - S. Benson
April 30-May 11

    • Worked on preparing the LERF for the isotope visit
    • Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
    • Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
    • Started putting together AWP for FOA proposal
    • Hosted visit from Steve Peggs for CBETA discussions

May 14-25

    • Arrange for collaboration with HZDR for Elbe II facility.
    • Complete AWP for FOA proposal
    • Derive draft budget for isotope production
    • Revise LOD to match new ASE document.
    • Continue cleaning up the LERF for isotope visit.
    • Attend teleconference with DOE for isotope project.