2019-05-15-LeadershipReports
Jump to navigation
Jump to search
May 15, 2019 Report - May 6 - May 30
Director - Todd Satogata
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Alex Bogacz
Previous two weeks (May 6 - May 17) - Preparing poster on ‘Dogbone’ ERL for IPAC'19 - Selection of Technical Reviewers for the new Internal Publication system - Light Peer Review for IPAC'19 Next two weeks (May 20 - May 31) - IPAC’19 - Vacation - PRAB paper - review
Rui Li
Previous two weeks (May 6 - May 17) - Coordinate JLEIC impedance meeting: good progress in the IR chamber design (Mark wiseman) and EM modeling (Frank Marhauser), and heated discussion about Gunn Tae Park's presentation about harmonic kicker impedance analysis. Also interesting discussion with Dan Wang of LBL who participated the meeting via bluejeans - Literature studies on impedance theories - Family vacation for most of the 2nd week Next two weeks (May 20 - May 31) - Impedance studies - Bunch spectrum for JLEIC bunch pattern and its impact on coupled bunch instabilities - CSR effect studies (Georg Haffstaetter visit to discuss CSR effects in CBETA)
Ed Nissen
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Chris Tennant
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Accelerator R & D - Yuhong Zhang
Fanglei Lin
Previous two weeks (May 6 - May 17) - Finished IPAC19 paper and poster - Worked on the storage ring cooler project - Provided parameters for SR background study in JLEIC - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, attended JLEIC general meeting, attended ZGOUBI workshop committee meetings Next two weeks (May 20 - May 31) - Update the pCDR-100 - Work on the storage ring cooler project - Prepare tutorial material for ZGOUBI workshop
Vasiliy Morozov
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Amy Sy
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Yuhong Zhang
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Computational Physics - Yves Roblin
Yves Roblin
CEBAF - JLEIC: - OTHER -
He Zhang
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
River Zhang
Previous two weeks (May 6 - May 17) - Completed IPAC2019-poster and submitted paper. - "CASA BeamBeam" - Revised, optimized and accelerated “Crab Kick” of “CASA BeamBeam” codes by using the High Performance Python Compiler, Numba. Based on JIT(Just in Time), Numba translates part of our “Crab Kick” Python functions to optimized machine code at runtime using the industry-standard LLVM compiler library. - Performance of “Crab kicking” - Simulations have been down for the JLEIC parameters again. For example, for the case CM Energy 21.9GeV, comparing with previous job, the “Numba” based “Crab Kick” codes can save 1/5 time than the old code for 4000 turn in a collider ring. - 3 Particles Spin Tracking - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”. Next two weeks (May 20 - May 31) - pyFMM will be under investigation. - Continue spin tracking study.
Diagnostic Development - Kevin Jordan
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Joe Gubeli
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Michael Tiefenback
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -
Andrew Hutton
Previous two weeks (May 6 - May 17) - Next two weeks (May 20 - May 31) -