2020-1-2-LeadershipReports
Jump to navigation
Jump to search
Jan 2 2020 Report - Dec 23 - Jan 17
Director - Todd Satogata
Todd Satogata
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
Alex Bogacz
Previous two weeks (Dec 23 - Jan 3) - Vacation & Holidays - Lecture preparation for USPAS'20 Next two weeks (Jan 6 - Jan 17) - Invention disclosures - review - Teaching Accelerator Physics course at USPAS’20
Rui Li
Previous two weeks (Dec 23 - Jan 3) - Holiday vacations - Recap and planning for works Next two weeks (Jan 6 - Jan 17) - Finish writing up the technote on uneven bunch spectra - Study literature about impact of uneven bunch fill on coupled bunch instability behavior - Schedule and planning for the next JLEIC impedance meeting
Edy Nissen
Previous two weeks (Dec 23 - Jan 3) - Away on sick leave - Then I was working on my preproposal for COMBINE Next two weeks (Jan 6 - Jan 17) - I am documenting the DODGE (DESIREE experiment) program - Working on the redesign of COMBINE
Chris Tennant
Previous two weeks (Dec 23 - Jan 3) - Shutdown/vacation - Administrative tasks (excessing desktop, spec'ing new laptop, answering e-mails, etc.) - Collected and sent Cheng-Ying CCR lattice material for collaborative work Next two weeks (Jan 6 - Jan 17) - Possible visit to CNU robotics lab - Start tracking distributions from Fay through CCR and evaluate performance - Prepping for AI presentation to DOE (meet with people about proposed projects)
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
Max Bruker
Previous (Dec 23 - Jan 3) - Vacation - Had a first look at some data from the IMP experiment Next (Jan 20 - Jan 31) - Plan and perform IMP data analysis - Tentatively: DC electron cooler discussion at Fermilab
Fanglei Lin
Previous two weeks (Dec 23 - Jan 3) - Had the holiday break Next two weeks (Jan 6 - Jan 17) - Work on simulations of spin transparency experiment - Work on the storage ring cooler project - Work on teaching material for the Spin@USPAS class
Bhawin Dhital
Previous two weeks (Dec 23 - Jan 3) - Learning python and data science with python. Took some online courses on python. - Preparing slides on ` beam cooling ' for coming USPAS . Next two weeks (Jan 6 - Jan 17) - Working with stability in a two energy storage ring cooler with ` Radiation on'. - Working on generalized formula for stability in a two - energy storage ring cooler. - Going to USPAS ( Jan 13 - Jan 24) San Diego, CA as a TA for "Accelerator Physics".
Vasiliy Morozov
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
Amy Sy
Previous two weeks (Dec 23 - Jan 3): - Preparing Early Career Award pre-proposal for submission. - DTL phase optimization in H- ion linac in TRACK. Next two weeks (Jan 6 - Jan 17) - Continued work on getting the DTL portion of the ion linac working in PyORBIT. - Schottky signal analysis for latest IMP experiment as necessary.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (Dec 23 - Jan 3) - Holiday Shutdown Next two weeks (Jan 6 - Jan 17) - Vacation (until Jan 8) - AI workshop organizing committee meetings and organizational work - Accelerator restart, BTEAM meetings - TRC committee meetings - FOA report on beambeam - Staff evaluations
Randi Gamage
Previous two weeks (Dec 23 - Jan 3) - Holiday Shutdown Next two weeks (Jan 6 - Jan 17) - Chromaticity correction - Implementing two mobius insertions to one arc
River Huang
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
Isurumali Neththikumara
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
Dennis Turner
Previous two weeks (Dec 23 - Jan 3) - Holiday Shutdown Next two weeks (Jan 6 - Jan 17) -
He Zhang
Previous two weeks (Dec 23 - Jan 3) - Revised JSPEC for better management of the code. - Calculated the IBS rate for new lattices from Vasiliy. - Ao Liu, A scientist from Euclid Techlab, want to apply for an SBIR project on space charge effects and he wish Ji Qiang and I can join. Discussed with them and helped to write an LOI. Next two weeks (Jan 6 - Jan 17) - FOA Quarterly report. - Set up turn-by-turn tracking for IMP experiment and ion beam edge cooling.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
Joe Gubeli
Previous two weeks (Dec 23 - Jan 3) - Isotope Experiment – Helped with the two day run to the 1G dump. - Halo monitor – Conducted the Halo Monitor experiment in the LERF. - ARDDOT – Was able to install and run the Beamenizer on a Windows 10 machine. Next two weeks (Jan 6 - Jan 17) - Isotope Experiment – Help with the two day run to the 1X line. - ARDDOT – Start work on the other CEBAF SLMs
Michael Tiefenback
Previous two weeks (Dec 23 - Jan 3) - Next two weeks (Jan 6 - Jan 17) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (Dec 23 - Jan 3) - Vacation until January 1st - Scheduled seminar committee meeting - Hosted FOA status briefing. - Started reviewing two SBIRs for DOE - Set up CBETA Advisory Committee meeting Next two weeks (Jan 6 - Jan 17) - Certify User Lab 4 in the LERF - Complete review of SBIRs - Arrange for temperature bump in LERF injector cryounit - Meet with seminar committee to set up schedule for upcoming seminars. - Get Isotope ERR punch-list items completed and signed off.
Andrew Hutton
Previous two weeks (Dec 23 - Jan 3) - Before Christmas, I developed a scaling for the AWA-ANL defection cavity for JLEIC straight merger. I managed to find a parameter set that would enable the straight merger cavity to be a room-temperature copper cavity, rather than an SRF cavity. But it is a bit of a brute, so may not be the optimum. - After Christmas, I returned to AccApp 2020 preparations. I have already evaluated the Abstracts, now I am trying to develop a layout for each Session I am responsible for (4). - Jan 3, I am hosting Courtney Washington for a visit to the isotope irradiation area in the LERF vault. I promised her that I would invite her once she turned 18, which happened in November. Next two weeks Jan 6 - Jan 17) - I will complete the AccApp 202 preparations. - I have to prepare the first draft of the Quarterly Report for the Isotope Program. In addition, Doug Wells and I have a conference call with Ethan Balkin, the DOE Isotope Program Manager, to discuss the relative importance of Copper64 when mixed with Copper 67. - I leave for Vienna on January 9, returning on January 16, but will not come to the lab on January 17.