2019-01-18-LeadershipReports

From Administrative
Revision as of 16:56, 18 January 2019 by Tristan (talk | contribs)
Jump to navigation Jump to search

Jan 7-Jan 18

Director - Todd Satogata

  Previous two weeks ()
     - 
  Next two weeks ()
     - 

Alex Bogacz

  Previous two weeks ()
     - 
  Next two weeks ()
     -  

Rui Li

  Previous two weeks ()
     - 
  Next two weeks ()
     -  

Ed Nissen

  Previous two weeks ()
     - 
  Next two weeks ()
     - 

Chris Tennant

  Previous two weeks ()
     - 
  Next two weeks ()
     -  



Accelerator R & D - Y. Zhang

Fanglei Lin

 Previous two weeks (Jan 7 - Jan 18)
    - Optimizing the electron collider ring design with PEP-II magnets
    - Working on the storage ring cooler project
    - Miscellaneous: attended the spin transparency test teleconference, attended the Pre-CDR Update meeting, attended
      the JLEIC R&D meeting, attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, attended JLEIC general meeting
 Next two weeks (Jan 18 - Feb 1)
    - Work on the electron collider ring design with PEP-II magnets
    - Work on the storage ring cooler project
    - Electron spin study using BMAD


Vasiliy Morozov

 Previous two weeks (Jan 7 - Jan 18)
    - 
 Next two weeks (Jan 18 - Feb 1)
    - 


Amy Sy

Previous two weeks (Jan 7 - Jan 18)
    - 
 Next two weeks (Jan 18 - Feb 1)
    - 




Computational Physics - Y. Roblin
Yves Roblin

   CEBAF
   OTHER


He Zhang

   Previous two weeks (Jan 7 - Jan 18)
     - Development of JSPEC code
     - DeCooling Rate Calculation for JLEIC with New Parameters
     - BeamBeam3D
   Next two weeks (Jan 18 - Feb 1)
     - Finish th core-tail model  
     - Finish space charge effect in friction force calculation
     - Continue documenting JSPEC development
   Others
     - Write for three FOA quarterly reports



Diagnostic Development - K. Jordan
No report.



LERF - S. Benson

  • May 14-25
    • Derived draft budget for isotope production
    • Went over isotope project with DOE site office staff
    • Summarized labor resources needed for FOA proposal
    • Continued cleaning up the LERF for isotope visit.
    • Attended teleconference with DOE for isotope project.
    • Hosted Cooling ring meetings on May 16 and 23rd and wrote up minutes
    • Established CCR circumference for Pre-CDR
    • Reviewed IRMMW paper, LDRD proposals and IPAC contribution
  • May 29-June 8
    • Arrange for collaboration with HZDR for Elbe II facility.
    • Submit budget for isotope project
    • Complete AWP for FOA proposal
    • Revise LOD to match new ASE document.
    • Complete question answers for LDRD proposals
    • Review a couple of AIP papers