2019-04-15-LeadershipReports
Jump to navigation
Jump to search
April 15, 2019 Report - April 15 - May 10
Director - Todd Satogata
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Alex Bogacz
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Rui Li
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Ed Nissen
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Chris Tennant
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Accelerator R & D - Yuhong Zhang
Fanglei Lin
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Vasiliy Morozov
Previous two weeks (Apr 15 - Apr 26) - Preparation of the DoE quarterly reports: they were submitted on April 26 - Polarization studies: calculation of RHIC's spin response function, preparation of IPAC'18 paper - Two-energy storage ring cooler: study of stability of the longitudinal dynamics
Next two weeks (Apr 29 - May 10) - Preparation of IPAC'18 papers - Pre-CDR update
Amy Sy
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Yuhong Zhang
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Computational Physics - Yves Roblin
Yves Roblin
CEBAF - Ran BTEAM, prepare for the summer run. Initial algorithm development for speeding up CED update in order to adapt optics to the gradient profile of the linac prior to starting ORFP. JLEIC: - Wrote and send report to DOE for the 2nd quarter of the FY18 FOA. - Writing tech note on the implementation of IR multipole kicks in BB3D. - Gave a presentation on the status of the beam-beam for the new pCDR100 optics OTHER - Attended the ML seminar - Starting to work on the use of deep learning networks for CEBAF (matching with sync light ) Next two weeks (Apr 29 - May 10) - Fiish tech note on the IR multipole kicks implementation - Start comparing elegant+bbeam (River's code) with bb3d an IR kicks - Work on a model for a landau cavity (its 3rd quarter of FOA)
+work on optics for the summer run (CEBAF)
He Zhang
Previous two weeks (Apr 15 - Apr 26) - MAD-X 5d Map tracking - JSPEC development Next two weeks (Apr 29 - May 10) - Update the manual for the luminosity module. - Dispersive cooling (New friction force formulas and benchmark with theory).
Diagnostic Development - Kevin Jordan
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Joe Gubeli
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -
Michael Tiefenback
Previous two weeks (Apr 15 - Apr 26) - Specify quadrupole configuration for Hall B for summer run (HPS beam spots ~ 30 microns) - Specify depth of field limiting slit widths for Arc 7 SLM - Specify dual-magnet steering modulation for real-time rayTrace (in progress; appears promising) - Planning for overall diagnostic system integration, including periodic calibration requirements Next two weeks (Apr 29 - May 10) - Model SyncLightMonitor matching process for arcs - Review field map updates for Moller quads requested by Benesch - Continue on 4) above (diagnostic system integration)
LERF - Steve Benson
Previous two weeks (Apr 15 - Apr 26) - Next two weeks (Apr 29 - May 10) -