2019-05-15-LeadershipReports

From Administrative
Revision as of 09:28, 28 May 2019 by Tristan (talk | contribs)
Jump to navigation Jump to search

May 15, 2019 Report - May 13 - June 7

Director - Todd Satogata

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  

Alex Bogacz

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 

Rui Li

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  

Ed Nissen

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 

Chris Tennant

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Accelerator R & D - Yuhong Zhang

Fanglei Lin

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Vasiliy Morozov

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 
 


Amy Sy

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Yuhong Zhang

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 




Computational Physics - Yves Roblin
Yves Roblin

   CEBAF
     - 
    JLEIC:   
     -    
   OTHER
     - 


He Zhang

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 


River Zhang

  Previous two weeks (May 13 - May 24)
     - Completed IPAC2019-poster and submitted paper.
     - "CASA BeamBeam"
     - Revised, optimized and accelerated “Crab Kick” of “CASA BeamBeam” codes by using the High Performance Python Compiler,
       Numba. Based on JIT(Just in Time), Numba translates part of our “Crab Kick” Python functions to optimized machine code
       at runtime using the industry-standard LLVM compiler library. 
     - Performance of “Crab kicking”
     - Simulations have been down for the JLEIC parameters again. For example, for the case CM Energy 21.9GeV, comparing with
       previous job, the “Numba” based “Crab Kick” codes can save 1/5 time than the old code for 4000 turn in a collider ring.
     - 3 Particles Spin Tracking
     - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”.
  Next two weeks (May 27 - June 7)
     - pyFMM will be under investigation.
     - Continue spin tracking study.



Diagnostic Development - Kevin Jordan

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 


Joe Gubeli

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  


Michael Tiefenback

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  



LERF - Steve Benson

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -