2015-Nov-09 Comp. Phys. Biweekly Report

From Administrative
Revision as of 14:03, 20 July 2016 by Anichols (talk | contribs) (Created page with "Yves Roblin <ul> <li>working on Optics for CEBAF restart **optics for 6 pass run **optics for gradient calibration **debugging CED scripts used to load optics (with AHLA) <li...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Yves Roblin

  • working on Optics for CEBAF restart
      • optics for 6 pass run
      • optics for gradient calibration
      • debugging CED scripts used to load optics (with AHLA)
  • prepared and then gave a seminar at ODU on "computational beam physics challenges for MEIC"
  • submitted a proposal to DOE for NET2025 with Amber Boehlen
  • conducted interviews for position 11602. Offer has been made as of last Friday.

He Zhang

  • Working on cooling LDRD