2017-07-07
Jump to navigation
Jump to search
Accel. Physics - Todd Satogata
Todd Satogata
Previous two weeks (Jun 26-Jul 7) - ADMIN: S&T Dry Runs (Jun 26, Jul 6), slide updates - ADMIN: Finish JINST, PRAB paper reviews - OPS: Review ORFP, troubleshooting guide notes - JLEIC: Add space charge, other calcs to RampCalculator - USPAS: Search committee meeting (Jun 27), prep - JACoW: Board of Directors telecon (Jun 29) - IPAC18: Start sending out invited oral invitations - ADMIN: Summer student advising, lunch talk on cooling (Jun 29) - VACATION: July 3 Next two weeks (July 10-21) - IPAC18: Finish sending out invited oral invitations - JLEIC: RampCalculator to svn, ANL visit (Jul 11) - JLEIC: Booster ramp modeling, parameter documentation - USPAS: Search committee travel (Jul 12-13) - OPS: Restart BTeam, start prep for StayTreat talk - ODU: REU student presentations (Jul 20) - OPS: Larry Weinstein Great Course filming (Jul 21) - JACOW: Conference advisement (COOL'17)
Alex Bogacz
Previous two weeks (Jun 26-Jul 7) - ADMIN: Prep talk on "Challenges and Opportunities of Energy Recovering Linacs" - PERLE: CERN visit (June 19-June 28) coincident with ERL workshop - VACATION: Jun 29-July 7 Next two weeks (July 10-21) - VACATION: June 28-July 10, July 17-18 - USPAS: Travel (Jul 13) - PERLE: Followup discussions after ERL workshop
David Douglas
Previous two weeks (Jun 26-Jul 7) - JLEIC: FAST/IOTA study brainstorming - OPS: StayTreat presentation development for LERF beam studies - JLEIC: ERL/CCR status summary, exchange transport (fighting aberrations) - JLEIC: Continue CCR recirculation arc development - ADMIN: Start packing up trailer office Next two weeks (July 10-21) - VACATION: Jul 12-18 - OPS: Continue StayTreat presentation development - PERLE: CSR/uBI, lattice ruminations - JLEIC: Continue CCR recirculation arc development - JLEIC: Start CCR architecture/doomedness note - JLEIC: Continue work on EmEx with accelerating mode cavity (with Slava) - ADMIN: Perhaps start ruminations on Springer ERL book - ADMIN: Continue packing up trailer office
Rui Li
Previous two weeks (Jun 26-Jul 7) - VACATION: Jun 30, half Jun 29, Jul 3 - ADMIN: three interviews for the postdoc position in Yves' group - JLEIC: detailed calculations of coupled bunch instabilities Next two weeks (July 10-21) - JLEIC: continue detailed calculations of coupled bunch instabilities - JLEIC: Present coupled bunch instability results at R&D meeting - JLEIC: SRF HOM discussions re coupled bunch instabilities - JLEIC: start investigating electron cloud parameters, effect
Ed Nissen
Previous two weeks (Jun 26-Jul 7) - JLEIC: Finish chromaticity corrections; emittance growth verified to be space charge - JLEIC: Continue iterating Booster injection parameters (momentum spread) - JLEIC: Start ramping sections of Booster cycle - JLEIC: Investigate DESIREE for gear-changing; conclude tune spreads too low Next two weeks (July 10-21) - JLEIC: Booster lattice to COSY/COMFY for tune footprint - JLEIC: Iterating base tunes based on COSY/COMFY results - JLEIC: Move on to Booster 6D injection space charge evaluation
Chris Tennant
Previous two weeks (Jun 26-Jul 7) - ADMIN: Wrap-up after ERL17 workshop (Jun 18-Jun 23) - PERLE: Checking elegant lattice (translated by Yves) - PERLE: initial uBI gain analysis - ADMIN: Start packing up office :( Next two weeks (July 10-21) - JLEIC: Continue electron cooler work (continue pushing 3nC distribution) - JLEIC: Test project E merger with electron cooler - ADMIN: Continue packing up trailer office - VACATION: Jul 17-21
Randy Gamage
Previous two weeks (Jun 26-Jul 7) - JLEIC: Coasting beam instability calculations/simulations - Dissertation writing: Continue coasting beam chapter, tech note Next two weeks (July 10-21) - JLEIC: Continue coasting beam instability calculations/simulations - Dissertation writing: Continue coasting beam chapter, tech note