2017-07-07

From Administrative
Revision as of 13:06, 21 July 2017 by Anichols (talk | contribs) (Created page with "'''Accel. Physics - Todd Satogata''' Todd Satogata Previous two weeks (Jun 26-Jul 7) - ADMIN: S&T Dry Runs (Jun 26, Jul 6), slide updates - ADMIN: Finish JINS...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Accel. Physics - Todd Satogata

Todd Satogata

   Previous two weeks (Jun 26-Jul 7)
     - ADMIN: S&T Dry Runs (Jun 26, Jul 6), slide updates
     - ADMIN: Finish JINST, PRAB paper reviews
     - OPS: Review ORFP, troubleshooting guide notes
     - JLEIC: Add space charge, other calcs to RampCalculator
     - USPAS: Search committee meeting (Jun 27), prep
     - JACoW: Board of Directors telecon (Jun 29)
     - IPAC18: Start sending out invited oral invitations
     - ADMIN: Summer student advising, lunch talk on cooling (Jun 29)
     - VACATION: July 3
   Next two weeks (July 10-21)
     - IPAC18: Finish sending out invited oral invitations
     - JLEIC: RampCalculator to svn, ANL visit (Jul 11)
     - JLEIC: Booster ramp modeling, parameter documentation
     - USPAS: Search committee travel (Jul 12-13)
     - OPS: Restart BTeam, start prep for StayTreat talk
     - ODU: REU student presentations (Jul 20)
     - OPS: Larry Weinstein Great Course filming (Jul 21)
     - JACOW: Conference advisement (COOL'17)

Alex Bogacz

   Previous two weeks (Jun 26-Jul 7)
     - ADMIN: Prep talk on "Challenges and Opportunities of Energy Recovering Linacs"
     - PERLE: CERN visit (June 19-June 28) coincident with ERL workshop
     - VACATION: Jun 29-July 7
   Next two weeks (July 10-21)
     - VACATION: June 28-July 10, July 17-18
     - USPAS: Travel (Jul 13)
     - PERLE: Followup discussions after ERL workshop

David Douglas

   Previous two weeks (Jun 26-Jul 7)
     - JLEIC: FAST/IOTA study brainstorming
     - OPS: StayTreat presentation development for LERF beam studies
     - JLEIC: ERL/CCR status summary, exchange transport (fighting aberrations)
     - JLEIC: Continue CCR recirculation arc development
     - ADMIN: Start packing up trailer office
   Next two weeks (July 10-21)
     - VACATION: Jul 12-18
     - OPS: Continue StayTreat presentation development
     - PERLE: CSR/uBI, lattice ruminations
     - JLEIC: Continue CCR recirculation arc development
     - JLEIC: Start CCR architecture/doomedness note
     - JLEIC: Continue work on EmEx with accelerating mode cavity (with Slava)
     - ADMIN: Perhaps start ruminations on Springer ERL book
     - ADMIN: Continue packing up trailer office

Rui Li

   Previous two weeks (Jun 26-Jul 7)
     - VACATION: Jun 30, half Jun 29, Jul 3
     - ADMIN: three interviews for the postdoc position in Yves' group
     - JLEIC: detailed calculations of coupled bunch instabilities
   Next two weeks (July 10-21)
     - JLEIC: continue detailed calculations of coupled bunch instabilities
     - JLEIC: Present coupled bunch instability results at R&D meeting
     - JLEIC: SRF HOM discussions re coupled bunch instabilities
     - JLEIC: start investigating electron cloud parameters, effect

Ed Nissen

   Previous two weeks (Jun 26-Jul 7)
     - JLEIC: Finish chromaticity corrections; emittance growth verified to be space charge
     - JLEIC: Continue iterating Booster injection parameters (momentum spread)
     - JLEIC: Start ramping sections of Booster cycle
     - JLEIC: Investigate DESIREE for gear-changing; conclude tune spreads too low
   Next two weeks (July 10-21)
     - JLEIC: Booster lattice to COSY/COMFY for tune footprint
     - JLEIC: Iterating base tunes based on COSY/COMFY results
     - JLEIC: Move on to Booster 6D injection space charge evaluation

Chris Tennant

   Previous two weeks (Jun 26-Jul 7)
     - ADMIN: Wrap-up after ERL17 workshop (Jun 18-Jun 23)
     - PERLE: Checking elegant lattice (translated by Yves)
     - PERLE: initial uBI gain analysis
     - ADMIN: Start packing up office :(
   Next two weeks (July 10-21)
     - JLEIC: Continue electron cooler work (continue pushing 3nC distribution)
     - JLEIC: Test project E merger with electron cooler
     - ADMIN: Continue packing up trailer office
     - VACATION: Jul 17-21

Randy Gamage

   Previous two weeks (Jun 26-Jul 7)
      - JLEIC: Coasting beam instability calculations/simulations
     - Dissertation writing: Continue coasting beam chapter, tech note
   Next two weeks (July 10-21)
     - JLEIC: Continue coasting beam instability calculations/simulations
     - Dissertation writing: Continue coasting beam chapter, tech note