2017-01-06

From Administrative
Revision as of 09:23, 2 November 2017 by Anichols (talk | contribs) (Created page with "'''Director - M. Spata <br>''' No report ---- '''Accelerator Physics - T. Satogata <br>''' Todd Satogata Previous two weeks (Jan 3-6) - USPAS: Class preparation...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Director - M. Spata

No report



Accelerator Physics - T. Satogata

Todd Satogata

 Previous two weeks (Jan 3-6)
   - USPAS: Class preparation
   - OPS: Daily meetings, spring run preparation
   - IPAC18: SPC1 meeting prep
   - ER@CEBAF: Seminar prep
   - ADMIN: ODU/Adelphi REU recommendation letters
   - ADMIN: student meetings (Randy, EricT)
 Next two weeks (Jan 9-Jan 20)
   - ADMIN: Meet with Rui, establish expectations/reporting
   - ADMIN: Distribute normalized annual reviews to group
   - IPAC18: SPC1 meetings (Jan 10-12)
   - ODU: Randy annual research presentation (Jan 11)
   - OPS: Daily meetings, spring run preparation, BTeam/ATLis prep
   - ADMIN: student meetings (Randy, EricT)
   - USPAS: Teaching (Jan 15-28)

Alex Bogacz

 Previous two weeks (Jan 3-6)
   - Publication survey analysis (APS publication committee)
   - JLEIC: Transfer of Booster lattice to Ed
   - Vacation (Jan 4-6)
 Next two weeks (Jan 9-Jan 20)
   - PERLE : continue lattice design, Feb trip prep
   - JINST article review
   - Invention disclosure reviews

David Douglas

 Previous two weeks (Jan 3-6)
   - JLEIC: CCR arc option evaluation
   - JLEIC: Devise/refine solutions for arcs with local axial
     symmetry, dispersion suppression, and isochronicity (and
     working to shorten an initial design)
 Next two weeks (Jan 9-Jan 20)
   - JLEIC: Write up CCR arc option evaluation tech note
   - JLEIC: Work with Chris on longitudinal beam dynamics
     of EUV FEL-type arcs and magnetized beam transport

Ed Nissen

 Previous two weeks (Jan 3-6)
  - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims
  - JLEIC: Start evaluating/planning Booster lattice from Alex
 Next two weeks (Jan 9-Jan 20)
  - JLEIC: Continue evaluating/planning Booster lattice
  - JLEIC: Review recent PRST:AB on booster injection space charge compensation
  - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims

Chris Tennant

 Previous two weeks (Jan 3-6)
   - DarkLight: Finished TN on emittance analysis
   - JLEIC: Translate Dave DIMAD ERL cooler recovery arc to elegant
   - JLEIC: Transport simulations of magnetized beam in EUV FEL-type arc
 Next two weeks (Jan 9-Jan 20)
   - JLEIC: Tracking studies for new CCR baseline through arc
     (axisymmetric and non-axisymmetric)
   - JLEIC: Investigation of measuring emittance in multi-component
     beams (also applicable to DarkLight TN analysis)
   - LERF: Start evaluating injector simulations for NASA irradiation project

Randy Gamage

 Previous two weeks (Jan 3-6)
   - JLEIC: Continue writing outlines of initial dissertation chapters
   - JLEIC: Continue esme simulations of debunch/rebunch with impedance
   - Start preparations for USPAS TA-ship
 Next two weeks (Jan 9-Jan 20)
   - Annual report presentation to committee (Jan 11)
   - USPAS: TA for Todd/Cedric course (Jan 15-28)



Accelerator R and D - Y. Zhang



Computational Physics - Y. Roblin



Diagnostic Development - K. Jordan