2015-07-24 Diagnostic Development Biweekly Report
CASA Diagnostic Development
Biweekly Report: 07/11/15 - 07/24/15
Submitted by: Pavel Evtushenko
M. Tiefenback • finished the paper review • participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task • continuing engagement with turning the multi-pass steering procedure into an operational tool • continuing engagement with hot-wire anemometer mass-flow meter • has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered • About 2.5 days of personal leave time the past week
P. Evtushenko
• prepared talk for the S&T review and presented it at the dry run
• has completed plan of finishing the early career grant work;
• this includes al tasks, personal required for the work, procurement and labor plan
• works on various ongoing aspects of the early career grant
• large fraction of it - discussions with potential manufacturers of system components
• reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
• with a combination of SR and OTR; the last revision is declared final
• reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design
K. Jordan • Travel