2015-07-24 Diagnostic Development Biweekly Report

From Administrative
Revision as of 08:55, 31 July 2015 by Anichols (talk | contribs) (Created page with "CASA Diagnostic Development<br> Biweekly Report: 07/11/15 - 07/24/15<br> Submitted by: Pavel Evtushenko<br> M. Tiefenback • finished the paper review • participated in ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

CASA Diagnostic Development
Biweekly Report: 07/11/15 - 07/24/15
Submitted by: Pavel Evtushenko

M. Tiefenback • finished the paper review • participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task • continuing engagement with turning the multi-pass steering procedure into an operational tool • continuing engagement with hot-wire anemometer mass-flow meter • has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered • About 2.5 days of personal leave time the past week


P. Evtushenko • prepared talk for the S&T review and presented it at the dry run • has completed plan of finishing the early career grant work; • this includes al tasks, personal required for the work, procurement and labor plan • works on various ongoing aspects of the early career grant • large fraction of it - discussions with potential manufacturers of system components • reviewed several revisions of the setup at 1C12 for transverse beam profile measurements • with a combination of SR and OTR; the last revision is declared final • reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design

K. Jordan • Travel