Jan 2 2020 Report - Dec 23 - Jan 17 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Dec 23 - Jan 3)
     - 
  Next two weeks (Jan 6 - Jan 17)
     - 




Alex Bogacz

  Previous two weeks (Dec 23 - Jan 3) 
     - Vacation & Holidays
     - Lecture preparation for USPAS'20
  Next two weeks (Jan 6 - Jan 17)
     - Invention disclosures - review
     -	Teaching Accelerator Physics course at USPAS’20



Rui Li

  Previous two weeks (Dec 23 - Jan 3)
     - Holiday vacations
     - Recap and planning for works
  Next two weeks (Jan 6 - Jan 17)
     - Finish writing up the technote on uneven bunch spectra
     - Study literature about impact of uneven bunch fill on coupled bunch instability behavior
     - Schedule and planning for the next JLEIC impedance meeting



Edy Nissen

   Previous two weeks (Dec 23 - Jan 3)
     - Away on sick leave
     - Then I was working on my preproposal for COMBINE
   Next two weeks (Jan 6 - Jan 17)
     - I am documenting the DODGE (DESIREE experiment) program
     - Working on the redesign of COMBINE




Chris Tennant

   Previous two weeks (Dec 23 - Jan 3)
     - Shutdown/vacation
     - Administrative tasks (excessing desktop, spec'ing new laptop, answering e-mails, etc.)
     - Collected and sent Cheng-Ying CCR lattice material for collaborative work
   Next two weeks (Jan 6 - Jan 17)
     - Possible visit to CNU robotics lab
     - Start tracking distributions from Fay through CCR and evaluate performance
     - Prepping for AI presentation to DOE (meet with people about proposed projects)




Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Dec 23 - Jan 3)
     - 
  Next two weeks (Jan 6 - Jan 17)
     - 


Max Bruker

  Previous (Dec 23 - Jan 3)
     - Vacation
     - Had a first look at some data from the IMP experiment
  Next (Jan 20 - Jan 31)
     - Plan and perform IMP data analysis
     -	Tentatively: DC electron cooler discussion at Fermilab




Fanglei Lin

  Previous two weeks (Dec 23 - Jan 3)
       - Had the holiday break
  Next two weeks (Jan 6 - Jan 17)
       - Work on simulations of spin transparency experiment
       - Work on the storage ring cooler project
       - Work on teaching material for the Spin@USPAS class




Bhawin Dhital

   Previous two weeks (Dec 23 - Jan 3)
     - Learning python and data science with python. Took some online courses on python.
     - Preparing slides on ` beam cooling ' for coming USPAS .
   Next two weeks (Jan 6 - Jan 17)
     - Working with stability in a two energy storage ring cooler with ` Radiation on'.
     - Working on generalized formula for stability in a two - energy storage ring cooler.
     - Going to USPAS ( Jan 13 - Jan 24) San Diego, CA as a TA for "Accelerator Physics".


Vasiliy Morozov

   Previous two weeks (Dec 23 - Jan 3)
     -
   Next two weeks (Jan 6 - Jan 17)
     -




Amy Sy

   Previous two weeks (Dec 23 - Jan 3):
     - Preparing Early Career Award pre-proposal for submission.
     - DTL phase optimization in H- ion linac in TRACK.
   Next two weeks (Jan 6 - Jan 17)
     - Continued work on getting the DTL portion of the ion linac working in PyORBIT.
     - Schottky signal analysis for latest IMP experiment as necessary.






Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Dec 23 - Jan 3)
     - Holiday Shutdown
   Next two weeks (Jan 6 - Jan 17)
     - Vacation (until Jan 8)
     - AI workshop organizing committee meetings and organizational work
     - Accelerator restart, BTEAM meetings
     - TRC committee meetings
     - FOA report on beambeam
     - Staff evaluations




Randi Gamage

   Previous two weeks (Dec 23 - Jan 3)
     - Holiday Shutdown 
   Next two weeks (Jan 6 - Jan 17)
     - Chromaticity correction
     - Implementing two mobius insertions to one arc 



River Huang

   Previous two weeks (Dec 23 - Jan 3)
     - 
   Next two weeks (Jan 6 - Jan 17)
     -


Isurumali Neththikumara

   Previous two weeks (Dec 23 - Jan 3)
     - 
   Next two weeks (Jan 6 - Jan 17)
     - 



Dennis Turner

   Previous two weeks (Dec 23 - Jan 3)
     - Holiday Shutdown
   Next two weeks (Jan 6 - Jan 17)
     -



He Zhang

   Previous two weeks (Dec 23 - Jan 3)     
     - Revised JSPEC for better management of the code. 
     - Calculated the IBS rate for new lattices from Vasiliy.
     - Ao Liu, A scientist from Euclid Techlab, want to apply for an SBIR project on space charge effects and he wish Ji Qiang and I can join.
       Discussed with them and helped to write an LOI. 
   Next two weeks (Jan 6 - Jan 17) 
     - FOA Quarterly report.
     - Set up turn-by-turn tracking for IMP experiment and ion beam edge cooling. 
 



Diagnostic Development - Kevin Jordan

Kevin Jordan

   Previous two weeks (Dec 23 - Jan 3)
     - 
   Next two weeks (Jan 6 - Jan 17)
     - 



Joe Gubeli

   Previous two weeks (Dec 23 - Jan 3)
     - Isotope Experiment – Helped with the two day run to the 1G dump.
     - Halo monitor – Conducted the Halo Monitor experiment in the LERF.
     - ARDDOT – Was able to install and run the Beamenizer on a Windows 10 machine.
   Next two weeks (Jan 6 - Jan 17)
     - Isotope Experiment – Help with the two day run to the 1X line.
     - ARDDOT – Start work on the other CEBAF SLMs



Michael Tiefenback

   Previous two weeks (Dec 23 - Jan 3)
     - 
   Next two weeks (Jan 6 - Jan 17)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Dec 23 - Jan 3)
     - Vacation until January 1st
     - Scheduled seminar committee meeting
     - Hosted FOA status briefing.
     - Started reviewing two SBIRs for DOE
     - Set up CBETA Advisory Committee meeting
   Next two weeks (Jan 6 - Jan 17)
     - Certify User Lab 4 in the LERF
     - Complete review of SBIRs
     - Arrange for temperature bump in LERF injector cryounit
     - Meet with seminar committee to set up schedule for upcoming seminars.
     - Get Isotope ERR punch-list items completed and signed off.




Andrew Hutton

   Previous two weeks (Dec 23 - Jan 3)
     - Before Christmas, I developed a scaling for the AWA-ANL defection cavity for JLEIC straight merger.  I managed to find a parameter set 
       that would enable the straight merger cavity to be a room-temperature copper cavity, rather than an SRF cavity.  But it is a bit of a 
       brute, so may not be the optimum.  
     - After Christmas, I returned to AccApp 2020 preparations.  I have already evaluated the Abstracts, now I am trying to develop a layout
       for each Session I am responsible for (4).  
     - Jan 3, I am hosting Courtney Washington for a visit to the isotope irradiation area in the LERF vault.  I promised her that I would
       invite her once she turned 18, which happened in November.  
   Next two weeks Jan 6 - Jan 17)
     - I will complete the AccApp 202 preparations.  
     - I have to prepare the first draft of the Quarterly Report for the Isotope Program.  In addition, Doug Wells and I have a conference call
       with Ethan Balkin, the DOE Isotope Program Manager, to discuss the relative importance of Copper64 when mixed with Copper 67.  
     - I leave for Vienna on January 9, returning on January 16, but will not come to the lab on January 17.