2020-6-5-LeadershipReports
Jump to navigation
Jump to search
June 5 2020 Report - May 25 - June 19
Director - Todd Satogata
Todd Satogata
Previous two weeks (May 25 - Jun 5) - Next two weeks (Jun 8 - Jun 19) -
Alex Bogacz
Previous two weeks (May 25 - Jun 5) - Next two weeks (Jun 8 - June 19) -
Rui Li
Previous two weeks (May 25 - June 5) - Next two weeks (Jun 8 - Jun 19) -
Edy Nissen
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
Chris Tennant
Previous two weeks (May 25 - Jun 5) - AI lunch (recruiting and coordinating external speakers) - Submitted draft paper to PRAB and arxiv - Complete and record mini-presentation for EEML school - Complete TN about unsupervised learning and cluster analysis on dataset _ presented results to LDRD group - Watched several talks from the (free) AnacondaCON conference Next two weeks (Jun 8 - Jun 19) - Create talk for AI Lunch Series on "Problem of the Quarter #4" solution - Work with A. Carpenter for visualizations for the SRF fault classifier - Work on talk outlines (LBNL and JLab seminars) - Explore machine learning for data streams
Accelerator R & D - Yuhong Zhang
Yuhong Zhang
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
Max Bruker
Previous (May 11 - May 22) - IPAC - Did tracking simulations of IMP storage ring dynamics with bunched cooling beam space charge to find out the reason for the particle loss. A simple longitudinal model shows considerable heating when bunch length jitter is introduced, but it does not show instability. Full optics tracking in 6-d including a 3-d calculation of the electric field shows a random beating of the transverse action, which results in a particle loss rate comparable with the experimental result. - Communication with IMP folks on potential additions to the manuscript. Next (May 25 - Jun 5) - Finalize additions and reach consensus on the full contents of the article. - I'd like to understand the underlying cause of the particle loss on a conceptual level. This investigation, albeit very interesting and necessary, is unlikely to make it into the current publication because of time constraints. Depending on the ultimate quality of the results, we may consider writing something up at a later time.
Fanglei Lin
Previous two weeks (May 25 - Jun 5) - Working on study of the compact spin rotator and presented the working progress in the meeting - Studying the integer and half integer spin tune modes in the eSR - Studying electron polarization in the eSR and presented the progress in the meeting - Worked on the storage ring cooler project and evaluated the cooling performance - Miscellaneous: attended the Novel Techniques for eSR Polarization Improvement, attended the EIC eSR polarization meeting, attended the EIC RCS polarization meeting, attended the EIC hadron polarization meeting, attended the EIC low energy luminosity/facility optimization meeting, attended EIC design team meeting, attended alternate strong cooling task force meeting, attended the Storage Ring Cooler meeting, attended the Innovative HE Cooling Project Status meeting, attended the EIC Accelerator Design meeting, attended the EIC general meeting Next two weeks (Jun 8 - Jun 19) - Work on the task force on novel techniques for eSR polarization improvement - Study the polarization in the eSR - Work on the storage ring cooler project - Work on the evaluation of two-energy storage ring cooler for the task force on alternate strong cooling schemes
Bhawin Dhital
Previous two weeks (May 25 - Jun 5) - Single particle tracking with synchrotron radiation on. - Many particle tracking with synchrotron radiation on. - Equilibrium beam emittance and energy spread estimation from elegant particle tracking. Compared those values with analytical values. - For a long run with bunched beam and many particles, decided to go with parallel elegant. Asked Yves to install in JLab ifarm Next two weeks (Jun 8 - Jun 19) - Installation of PELEGANT in JLab ifarm is in progress - Dynamic Aperture, Momentum Aperture and Touschek Lifetime calculation - Run simulation using PELEGANT
Vasiliy Morozov
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
Amy Sy
Previous two weeks (May 25 - Jun 5) - Submission of LDRD proposal on preservation of magnetized ion beams. - Optimization of various compact spin rotator designs using ZGOUBI and TUNE. Testing various combined function magnet configurations for spin rotation at 18 GeV, and then modifying those configurations to test for effectiveness at 10 and 5 GeV. Solutions exist at each electron energy, but further optimization is ongoing to find a solution for all energies with minimal orbit excursion in the spin rotator. - MADX simulations for design of upstream/rear ion optics in the second IR. Matching to existing optics for the primary IR just beyond the crab cavity location. - Collected and edited inputs for the EIC design update newsletter. Next two weeks (Jun 8 - Jun 19) - Working out a distribution strategy for the EIC newsletter. - Continued work on spin rotator optimization simulations. - Continued work on upstream/rear ion optics for the second IR.
Computational Physics - Yves Roblin
Yves Roblin
Previous two weeks (May 28 - Jun 5) - Beam-beam meetings, - Wrote notes on how to determine tunes by tracking in elegant - New method to calculate tune diffusion implemented in python - Bteam meetings, support for restart - AI meetings, litterature search and reading on AI, in particular the - Concept of using streaming AI's for CEBAF data. - Vacation (June 1-5th) Next two weeks (Jun 8 - Jun 19) - Build the latest (very latest, from the subversion branch.) Pelegant for the farm - Wrote scripts for bhawin to allow for running Pelegant with multiple processors and across computing nodes using SLURM. - Next, will attempt to rebuild bb3d and do the same for it. (it is currently limited to running multiple processors but only on one node) - AI lunch series, AI reading, working on drafting proposals for using streaming AIs in order to process the CEBAF data - Bteam, getting ready for restart, discussions with Hall A/C regarding engineered controls for beam excursions
Randi Gamage
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
River Huang
Previous two weeks (May 28 - Jun 5) - Doing the particle tracking (with / without H-kick and V-kick) using CASA Beam-Beam scripts For JLEIC ring and BNL EIC ring. - CASA Beam-Beam package - Optimizing phase coordinates output of CASA Beam-Beam. Next two weeks (Jun 8 - Jun 19) - Continue working on EIC project.
Isurumali Neththikumara
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
Dennis Turner
Previous two weeks (May 11 - May 22) - Attended IPAC talks - HLA - Released new version of eDT in response to feature requests from Ops. - AIPINJ - Continue finalizing optics in the elegant model - Further explored numerical solutions for QW settings vs Wien settings - Presented latest optics at AIPINJ meeting, resulting in a list of - Attended CASA, BTeam, AIPINJ meetings - Attended Accelerator Seminars and AI Lunch Series talks - Caught up with reading various papers on Wien filters, optics, etc. Next two weeks (May 25 - Jun 5) - AIPINJ - Continue (and hopefully finish) finalizing optics - Camille will be requesting a review soon; prepare slides - Explore implementing the beta matching using beam jitter from the paper Jay sent around - Attend CASA, BTeam, AIPINJ meetings - Attend Accelerator Seminars and AI Lunch Series talks - Continue with online training opportunities as time permits
He Zhang
Previous two weeks (May 25 - Jun 5) - Confirmed the turn-by-turn model and the edge effect model for IMP cooling experiment in JSPEC. - Exposed the single particle model to the UI in JSPEC. - Finished and submitted the LDRD proposal. Next two weeks (Jun 8 - Jun 19) - Repeat previous simulations with the single particle model and continue JSPEC development and cooling simulation for eRHIC. - Continue simulation on IMP experiment.
Diagnostic Development - Kevin Jordan
Kevin Jordan
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
Joe Gubeli
Previous two weeks (May 11 - May 22) - Isotope Experiment – Next two weeks (May 25 - Jun 5) - Isotope Experiment –
Michael Tiefenback
Previous two weeks (May 11 - May 22) - Next two weeks (May 25 - Jun 5) -
CASA Fellows
LERF - Steve Benson
Previous two weeks (May 28 - Jun 5) - Submitted LDRD proposal - Hosted Low-energy cooling meetings and wrote up minutes - Worked on Developing budget for Isotope proposal - Worked on parts of the isotope proposal - Reviewed Tennant AI paper - Attended several seminars and some IPAC talks Next two weeks (Jun 8 - Jun 19) - Develop budgets for isotope proposals - Attend FAST/IOTA workshop remotely - Review LERF start-up procedures - Get SOW for Linac Development revised - Revise AWPs for Electron cooling contract to match new SOWs and resource availability.
Andrew Hutton
Previous two weeks (May 28 - Jun 5) - Next two weeks (Jun 8 - Jun 19) -