2016-Jun-13 Biweekly Report

From Administrative
Revision as of 15:04, 19 July 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (May 30-June 10) - ER@CEBAF: proposal writing - OPS: BTeam, RAR writing, RSR meetings, beam studies organization - REU: Star...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Todd Satogata

  Previous two weeks (May 30-June 10)
    - ER@CEBAF: proposal writing
    - OPS: BTeam, RAR writing, RSR meetings, beam studies organization
    - REU: Start work with REU student Deepsana Shahi (Adelphi)
    - JLEIC: Parameters meeting organization
    - JACOW: Assist IPAC'17/HB'16 with SPMS problems
    - ADMIN: Prep/deliver summer lecture (Introduction to Accelerators)
  Next two weeks (June 13-24)
    - OPS: Optics on call, BTeam, RAR writing, beam studies organization
    - OPS: StayTreat talk draft preparations
    - OPS: TAC Hall D LOI reviews/comments to TAC members
    - REU: Continue work with REU student Deepsana Shahi (Adelphi)
    - ER@CEBAF: organize next steps (optics coordination with BNL)

Alex Bogacz

  Previous two weeks (May 30-June 10)
    - ER@CEBAF: write section for proposal
    - JLEIC: Booster studies planning, meeting, coordination
    - USPAS: Lecture and homework preparations
  Next two weeks (June 13-24)
    - USPAS: Teaching at Colorado USPAS with Geoff Krafft

David Douglas

  Previous two weeks (May 30-June 10)
    - Cbeta: travel and design review preparations
    - DarkLight: Optics deck to Chris for LED-ification
    - MSU BES proposal: Wrap up and deliver
  Next two weeks (June 13-24)
    - Cbeta: Review participation
    - Darklight: Continued preparation for summer runs, coordination
      with LED/ops, write TN on optics design
    - JLEIC cooler: Finish TNs on magnetized beam transport

Ed Nissen

  Previous two weeks (May 30-June 10)
    - JLEIC Beam-Beam: Improve tracking, physical results for low
      energy beams
    - JLEIC: Finished initial look at space charge in booster
  Next two weeks (June 13-24)
    - JLEIC Beam-Beam: Working towards middle energy set
    - JLEIC Beam-Beam: Parameterization of beam-beam growth in energy

Chris Tennant

  Previous two weeks (May 30-June 10)
    - Project E: Work on ubunching gain analysis and troubleshooting
    - OPS: Work with Yves to understand orbit correction in elegant
    - LERF: Translate DarkLight dimad deck to elegant for LED import
  Next two weeks (June 13-24)
    - JLEIC Cooler: Working on further start to end tracking, corrections
    - ADMIN: Reading up on MARIE for August light source workshop

Randy Gamage

  Previous two weeks (May 30-June 10)
    - JLEIC: esme model development, bunch split optimization
    - Continue documenting results for thesis, IPAC'16 paper
    - USPAS: homework preparations
  Next two weeks (June 13-24)
    - USPAS: TA for Alex / Geoff in Colorado USPAS