2015-Aug-21 Biweekly Report

From Administrative
Revision as of 15:12, 19 July 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (Aug 10-21) - CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Todd Satogata

  Previous two weeks (Aug 10-21)
    - CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam;
      fopt optics tuning development (w/Eric Thompson)
    - ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning
    - ADMIN: IPAC'15 proceedings finalization; COOL'15 program work
    - MEIC: Gear-changing summary report contribution; beam-beam model development
    - ODU/MEIC: Continue bunch-splitting simulations, education with Randy
    - ODU: NNSA funding proposal development (biweekly telecon)
    - VACATION: 8/10(pm), 8/12, 8/14(am)
  Next two weeks (Aug 24-Sep 4)
    - CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric
      Thompson); Hall D weekly meeting
    - ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip
      planning (BNL Sep 4-11)
    - ADMIN: JACoW documentation development (Board of Directors)
    - MEIC: Continue beam-beam model development
    - ODU/MEIC: Continue bunch-splitting simulations, education with Randy
    - ODU: NNSA funding proposal development (biweekly telecon)
    - FMLA: 08/28

Alex Bogacz

  Previous two weeks (Aug 10-21)
    - NuFact15 (Aug 10-15)
    - Vacation (Aug 16-21)
  Next two weeks (Aug 24-Sep 4)
    - CEBAF: Check M56=0 lattices from Yves for fall run
    - ER@CEBAF: continue optics longitudinal match, extraction considerations

Dave Douglas

  Previous two weeks (Aug 10-21)
    - MEIC: Wrote up magnetized beam matching note; arc to Chris for space
      charge simulations; DIMAD model developed to work out dechirp.
    - Project E: Thinking about compressors in new optics, kibitzing to ASML
    - ER@CEBAF: Meetings
    - Other: DOE FWP review for LK Len
  Next two weeks (Aug 24-Sep 4)
    - MEIC: Deliver magnetized beam matching note; finish DIMAD model for
      dechirp; start writing technote on magnetized arc transport design.
    - LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz
      chicane); start reconfiguring optis to integrate detector/isotope
      production.
    - Project E: Possibly start developing diagnostics lines pending
      guidance; trip planning for September.
    - ER@CEBAF: Meetings, start writing on motivation section
    - Other: PRL Review

Chris Tennant

  Previous two weeks (Aug 10-21)
    - MEIC: magnetized beam transport/matching, including adaption to Tstep and
      incorporation of Douglas optics for space charge simulation
    - LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo
    - Bubble Chamber: 5D line to elegant, configured zigzag harp scans for
      5 MeV region, shifts awaiting measurement opportunities.
    - ER@CEBAF: Meetings, measurements planning
  Next two weeks (Aug 24-Sep 4)
    - MEIC: Continued magnetized beam transport, start technote documentation
    - LERF: Check FEL lattice in LED
    - Project E: start evaluating momentum aperture of lattice, Touschek impact,
      compare to Rui's predictions
    - Bubble Chamber: run planning for September, guidance for tuning (e.g.
      small spot size on radiator)

Alex Castilla

  Previous two weeks (Aug 10-21)
    - Dissertation writing
    - Continue preparations for MEPAS teaching in Nov
  Next two weeks (Aug 24-Sep 4)
    - Dissertation writing
    - Start preparations for MEPAS teaching in Nov

Randy Gamage

  Previous two weeks (Aug 10-21)
    - MEIC: Longitudinal model development
  Next two weeks (Aug 24-Sep 4)
    - MEIC: Longitudinal model development