2017-Jan-06 Accel. Phys. Biweekly Report

From Administrative
Revision as of 13:37, 7 February 2017 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (Jan 3-6) - USPAS: Class preparation - OPS: Daily meetings, spring run preparation - IPAC18: SPC1 meeting prep - ER@CEB...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Todd Satogata

  Previous two weeks (Jan 3-6)
    - USPAS: Class preparation
    - OPS: Daily meetings, spring run preparation
    - IPAC18: SPC1 meeting prep
    - ER@CEBAF: Seminar prep
    - ADMIN: ODU/Adelphi REU recommendation letters
    - ADMIN: student meetings (Randy, EricT)
  Next two weeks (Jan 9-Jan 20)
    - ADMIN: Meet with Rui, establish expectations/reporting
    - ADMIN: Distribute normalized annual reviews to group
    - IPAC18: SPC1 meetings (Jan 10-12)
    - ODU: Randy annual research presentation (Jan 11)
    - OPS: Daily meetings, spring run preparation, BTeam/ATLis prep
    - ADMIN: student meetings (Randy, EricT)
    - USPAS: Teaching (Jan 15-28)

Alex Bogacz

  Previous two weeks (Jan 3-6)
    - Publication survey analysis (APS publication committee)
    - JLEIC: Transfer of Booster lattice to Ed
    - Vacation (Jan 4-6)
  Next two weeks (Jan 9-Jan 20)
    - PERLE : continue lattice design, Feb trip prep
    - JINST article review
    - Invention disclosure reviews

David Douglas

  Previous two weeks (Jan 3-6)
    - JLEIC: CCR arc option evaluation
    - JLEIC: Devise/refine solutions for arcs with local axial
      symmetry, dispersion suppression, and isochronicity (and
      working to shorten an initial design)
  Next two weeks (Jan 9-Jan 20)
    - JLEIC: Write up CCR arc option evaluation tech note
    - JLEIC: Work with Chris on longitudinal beam dynamics
      of EUV FEL-type arcs and magnetized beam transport

Ed Nissen

  Previous two weeks (Jan 3-6)
   - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims
   - JLEIC: Start evaluating/planning Booster lattice from Alex
  Next two weeks (Jan 9-Jan 20)
   - JLEIC: Continue evaluating/planning Booster lattice
   - JLEIC: Review recent PRST:AB on booster injection space charge compensation
   - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims

Chris Tennant

  Previous two weeks (Jan 3-6)
    - DarkLight: Finished TN on emittance analysis
    - JLEIC: Translate Dave DIMAD ERL cooler recovery arc to elegant
    - JLEIC: Transport simulations of magnetized beam in EUV FEL-type arc
  Next two weeks (Jan 9-Jan 20)
    - JLEIC: Tracking studies for new CCR baseline through arc
      (axisymmetric and non-axisymmetric)
    - JLEIC: Investigation of measuring emittance in multi-component
      beams (also applicable to DarkLight TN analysis)
    - LERF: Start evaluating injector simulations for NASA irradiation project

Randy Gamage

  Previous two weeks (Jan 3-6)
    - JLEIC: Continue writing outlines of initial dissertation chapters
    - JLEIC: Continue esme simulations of debunch/rebunch with impedance
    - Start preparations for USPAS TA-ship
  Next two weeks (Jan 9-Jan 20)
    - Annual report presentation to committee (Jan 11)
    - USPAS: TA for Todd/Cedric course (Jan 15-28)