2016-Nov-26 Accel. Phys. Biweekly Report
Jump to navigation
Jump to search
Todd Satogata
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - ODU PHYS 231 class prep/teaching (MW half-days; midterm 3 grading) - BTeam/model team prep/participation - JLEIC R&D talk preparation - ODU/JLEIC Randy Gamage mentoring (CERN Blond code) - Thanksgiving break Next two weeks (Nov 27-Dec 10) - ODU PHYS 231 class prep/teaching (MW half-days) - JLEIC R&D talk preparation and travel (Nov 28-Dec 1) - BTeam/model team prep/participation, CEBAF ops support with Hall D? - ODU/JLEIC Randy Gamage mentoring (CERN Blond code) - IPAC17 abstract coordination/submission (Due Fri Dec 2) - CLAS12 review (Dec 6-7) - ODU: Alex Castilla PhD defense (Dec 8) - ER@CEBAF: Restart biweekly meetings - IPAC18 SPC1: Meeting prep - Various recommendation letters - ADMIN: Rui Li joining group
Alex Bogacz
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - SBIR proposal review - Development of coupled beta rotator, continued - APS: Prep survey of publication standards - CEBAF optics support Next two weeks (Nov 27-Dec 10) - PRST:AB paper review - APS: Prep/deliver/analyze survey of publication standards - JLEIC: Final pass on JLEIC Booster lattice
David Douglas
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - Tech note: magnetized beam transformations with symmetries to better understand insertions for CCRs and ERLs - SBIR proposal review - Completed cardiac rehab class! Next two weeks (Nov 27-Dec 10) - JLEIC: Continuing cooling insertion design - JLEIC: Evaluate Derbenev proposal on longitudinal/transverse emittance exchange in cooling system (Derbenev proposal) - JLEIC: Continue cooler ERL/CCR architecture (have idea for present baseline)
Ed Nissen
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - JLEIC: Continuation of collider beam-beam simulations (with gaps, fixed bug that was suppressing growth rates) - JLEIC: Continuation of booster injection space charge simulations Next two weeks (Nov 27-Dec 10) - JLEIC: Continuation of collider beam-beam simulations (alternating offsets and stopband evaluation) - JLEIC: Continuation of booster injection space charge simulations - JLEIC: Start draft of analytic beam-beam items from CERN/JLEIC work - IPAC17: Prep and submit abstracts (based on withdrawn NAPAC'16 versions)
Chris Tennant
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - Emittance error analysis for DarkLight, with Monte Carlo Next two weeks (Nov 27-Dec 10) - Finish up DarkLight emittance analysis, start writing TN - Prepare slides for diagnostic PIT meeting (Beaminizer ideas/needs) - JLEIC: Cooler development (extending/refinining end to end sims)
Randy Gamage
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - JLEIC: Continue writing outlines of initial dissertation chapters - JLEIC: Continue esme simulations of debunch/rebunch with impedance - JLEIC: Continue GA simulations of bunch splitting optimization Next two weeks (Nov 27-Dec 10) - JLEIC: Continue writing outlines of initial dissertation chapters - JLEIC: Continue esme simulations of debunch/rebunch with impedance - Schedule annual report presentation to committee - Start preparations for USPAS TA-ship